Boral — Corporate Update (March 2020)
26 slides from Boral's corporate update, Mar 9, 2020
Slide 1: Berrima Colliery - Closure Working Group Meeting #6
Berrima Colliery - Closure Working Group Meeting #6 >Welcome Boral Cement Procurement Building 9 March 202
Slide 2: Agenda
Agenda 1. Welcome and Apologies 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Scientific Report Discussion - Rob Byrnes & Greg Johnson 5. Bulkhead Seals Update - David Spears 6. EPL/CCL Updates - Greg Johnson 7. Water Supply Pipeline Opportunity - Fabio Colusso 8.
Slide 3: Welcome - CWG Representatives, Apologies & Guests
1. Welcome - CWG Representatives, Apologies & Guests ● Boral - Fabio Colusso, Greg Johnson, David Spears, Tom Horn (BCW) ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority - William Dove, Andrew Couldridge ● WaterNSW - Ravi Sundaram ● Wingecarribee Shire Counci
Slide 4: Terms of Reference - Code of Conduct of CWG Members
2. Terms of Reference - Code of Conduct of CWG Members Titlefefefefeffff4g45g4545
Slide 5: Review of Minutes – suggested amendments
3. Review of Minutes – suggested amendments ● WaterNSW - Ravi comments The corrections relate to the environmental releases WaterNSW is required to discharge from Wingecarribee Dam and the incorrect reference of WaterNSW as Sydney Water. WaterNSW is required to discharge 4 ML/d environmental flow fr
Slide 6: Surface Water Monitoring Scientific Report
4. Surface Water Monitoring Scientific Report Titlefefefefeffff4g45g4545
Slide 7: Berrima Colliery Scientific Report Summary
Berrima Colliery Scientific Report Summary ● Prepared in response to Special Condition E3.1 of EPL 608 ● The report brings together environmental studies specific to Special Condition 8 and covers the complete two years of the Performance Monitoring Program ● Report compiles four separate studies in
Slide 8: Water Quality - Findings and Conclusions
Water Quality - Findings and Conclusions ● General Discussion from Report - Rob ● Titlefefefefeffff4g45g4545
Slide 9: Aquatic Ecology - Conclusion
Aquatic Ecology - Conclusion ● General Discussion from Report - Rob Titlefefefefeffff4g45g4545
Slide 10: Ecotoxicity Assessment - Discussion
Ecotoxicity Assessment - Discussion ● General Discussion from Report - Rob Titlefefefefeffff4g45g4545
Slide 11: Sediment Analysis - Fate Assessment - Conclusion
Sediment Analysis - Fate Assessment - Conclusion ● General Discussion from Report - Rob Titlefefefefeffff4g45g4545
Slide 12: Scientific Report - Overall Conclusion
Scientific Report - Overall Conclusion ● Discussion on overall conclusions - Rob Titlefefefefeffff4g45g4545
Slide 13: Bulkhead Sealing Plan Update - Location in respect of workings
5. Bulkhead Sealing Plan Update - Location in respect of workings Titlefefefefeffff4g45g4545
Slide 14: Bulkhead Seal installation update
Bulkhead Seal installation update Titlefefefefeffff4g45g4545
Slide 15: Bulkhead Seal installation update
Bulkhead Seal installation update Titlefefefefeffff4g45g4545
Slide 16: Bulkhead Seal installation update
Bulkhead Seal installation update ● Seven Bulkheads installed May 2019 ● Personnel inspecting and recording observations twice a week ● Observations to date - minor seepage in ribs adjacent to the bulkheads and some through floor ● Bulkheads down dip in roadways, other water from western area of min
Slide 17: Environmental Protection Licence/ CCL Updates
6. Environmental Protection Licence/ CCL 748 Updates EPL 608 Annual return due submitted late December 2019. Final Water Quality Report and Scientific report submitted 28 Feb 2020 CCL 748 AEMR submitted 28 Feb 2020. Titlefefefefeffff4g45g4545
Slide 18: Proposed Water Supply Pipeline - Medway to New Berrima
7. Proposed Water Supply Pipeline - Medway to New Berrima
Slide 19: Key Issues & Drivers, Project Considerations
ey Issues & Drivers ● Climate Change - extended period of severe drought / bushfires ● Local Cement works relies on a water source for operational & environmental needs ● Drought has placed pressure on local available water [river & town water] roject Considerations ● Review the use of Colliery mine
Slide 20: Mandemar Lane Update
8. Mandemar Lane Update ● Boral has made some good progress in preparing an Environmental Activities Land Access Agreement for landholders in Mandemar Lane ● Some additional monitoring of production bores outside of the approved EMP as been agreed and Boral has also committed to the following with r
Slide 21: Communications Update
9. Communications Update - Tom Horn (BCW) •Objective: Continue the flow of information with regard to the closure plan updates and activity, and provide forums for the community to easily raise and discuss questions with Boral. •Delivery methods: Community newsletter – since the last CWG, two newsle
Slide 22: Communications Update - Tom Horn (BCW)
9. Communications Update - Tom Horn (BCW) Titlefefefefeffff4g45g4545
Slide 23: Role of Committee Members - Review of Terms of Reference
10. Role of Committee Members - Review of Terms of Reference Titlefefefefeffff4g45g4545
Slide 24: General business
11. General business Titlefefefefeffff4g45g4545
Slide 25: Next meeting date
10. Next meeting date Proposing - Monday 15 June 2020 Location – Boral Procurement Building Berrima Cement Titlefefefefeffff4g45g4545
Slide 26: Slide 26