Qpm Energy Limited · ASX:QPM

Qpm Energy — Investor Presentation (December 2025)

47 slides from Qpm Energy's investor presentation, Dec 3, 2025

  1. Slide 1: Powering a sustainable Queensland

    Powering a sustainable Queensland 3 December 2025 | ASX:QPM | qpmenergy.com.au LM6000 Aeroderivative Gas Turbine

  2. Slide 2: Important Notices & Disclaimers

    Important Notices & Disclaimers You must read the following carefully before continuing or making use of the information contained in this investor presentation (“Presentation”). By attending an investor presentation or briefing, or accepting, accessing or reviewing this Presentation, you acknowledg

  3. Slide 3: Important Notices & Disclaimers

    Important Notices & Disclaimers Not an offer and foreign jurisdictions This Presentation is not, and should not be considered, an offer or an invitation to acquire New Shares or any other financial products and does not and will not form any part of any contract to acquire New Shares. The distributi

  4. Slide 4: IPS Funding Update and Equity Raise Overview

    IPS Funding Update and Equity Raise Overview

  5. Slide 5: Isaac Energy Hub development update

    Isaac Energy Hub development update Isaac Power Station (IPS) development activities are on track with FID due by March 2026 Key Workstreams  Design, engineering and procurement  Detailed engineering design nearing completion, turbines on track for delivery to Queensland around March / April 2026

  6. Slide 6: Funding is Well Progressed

    Funding is Well Progressed QPM has signed a non-binding term sheet for a $40m convertible note investment, which together with the ~$113 million MLA with Macquarie underpins timely development of the IPS Project Debt Update Convertible Note  The MLA fully funds the two LM6000 gas turbines acquired

  7. Slide 7: Equity Raise Overview

    Equity Raise Overview $30 million Placement to maintain project momentum and deliverability • QPM is conducting a placement to raise approximately $30 million (before costs) via the issue of ~866.6 million fully paid ordinary shares (“New Shares”), comprising: Offer size and • ~747.3 million New Sha

  8. Slide 8: Indicative Timetable

    Indicative Timetable Indicative Offer timetable Event Date (AEDT) Trading Halt lifted and announcement of completion of the Placement Wednesday, 3 December 2025 Settlement of New Shares under Tranche 1 of the Placement Monday, 8 December 2025 Allotment, quotation and trading of New Shares under tran

  9. Slide 9: IPS Indicative Sources and Uses

    IPS Indicative Sources and Uses QPM is on track to complete all funding packages in the March 2026 quarter Sources Indicative Amount ($m) QPM investment to date 18 Project Finance Facilities 180 Convertible Note 40 Initial IPS Equity Raise 30 development costs Total 268 and GE turbine xx deposit Use

  10. Slide 10: Pathway to Final Investment Decision

    Pathway to Final Investment Decision Strong progress being made across to ensure IPS Project remains on track for mid 2027 commissioning Commentary Status Update  Material Change of Use Development Application (“MCUDA”) submitted to  The equity capital raising will allow the assessing body, Isaac

  11. Slide 11: QPM's Track Record of Delivery

    QPM’s Track Record of Delivery QPM’s execution of its “Molecules to Electronics” strategy has been swift Month Achieved Nov-24 Dec-25 Feb-25 Jun-25 Oct-25 Mar-26 Jul-27 Months from Electricity Generation 0 1 3 7 11 16 32 Strategy Milestone Status Strategy announcement at AGM Complete MPS Acquisition

  12. Slide 12: Company Overview

    Ou Company Overview

  13. Slide 13: QPM Corporate Snapshot

    QPM Corporate Snapshot Share price Market cap. Shares on issue Cash Gas + Elec Sales $4.0c $124m 3,089m $18.8m $88m As at 28 Nov 2025 As at 28 Nov 2025 As at 28 Nov 2025 As at 30 Sep 2025 FY2025 Board of Directors / Executive Management LTM Share Price Performance Share Price (A$) Eddie King David W

  14. Slide 14: QPM Energy Ltd – QLD's Emerging Utility

    QPM Energy Ltd – QLD’s Emerging Utility… QPM Energy Ltd (ASX:QPM) is a uniquely positioned, integrated energy utility  Integrated – from molecule to electron… ― Gas reserves – 435PJ 2P Reserves ― Gas supply - ~25-30TJ / day (11 PJ / year)  Managed gas production – 125 – 130 producing wells  Third

  15. Slide 15: …With Growing Generation Capacity

    …With Growing Generation Capacity QPM is on the way to its goal of managing a portfolio of 500MW of electricity generation capacity 0 MW 100 MW 200 MW 300 MW 400 MW 500 MW TPS MPS IPS Stage 1 IPS Stage 2 / IEH Bess / Other generation Townsville Power Station Moranbah Power Station xx Station (IPS) I

  16. Slide 16: Electricity Revenue Growth to Date

    Electricity Revenue Growth to Date 30% increase in electricity revenue, despite having TPS offline in the FY25 June Quarter Forecasted Gas and Electricity Sales Uplift ($m) FY2025 vs FY2024 Cumulative Electricity Revenue  FY25 gas and electricity generation uplift 60 driven by: 1. First full 12 mon

  17. Slide 17: …With Plans to Grow Further

    …With Plans to Grow Further Over 80% of QPM revenues will be sourced from electricity generation and sales Forecasted Gas and Electricity Sales Uplift ($m) Forecasted annual revenue from planned ~100MW / 4-hour dispatch BESS Forecasted annual Stage 1 revenue from IPS Feasibility Study – 2x turbines

  18. Slide 18: Underpinned by Substantial 2P Reserves

    Underpinned by Substantial 2P Reserves QPM has added 165PJ of 2P Reserves since acquisition, with ~300PJ available for electricity generation MGP 2P Reserve Growth (PJ)  MGP has 435PJ of 2P reserves independently 165PJ Increase Since Acquisition certified by Netherland Sewell & Associates as at 30

  19. Slide 19: Attractively Positioned for Re-rating

    Attractively Positioned for Re-rating QPM is underpinned by significant gas reserves that can be monetised through high margin electricity generation Peer 2P Reserves1 Peer Market Capitalisations2 250 20,173 12,257 6,035 Oil & Gas 4,000 Step 2: become Utilities 205 2 recognised as an 200 3,500 integ

  20. Slide 20: Queensland Energy Roadmap 2025

    Queensland Energy Roadmap 2025 QPM is ideally positioned to help the Queensland Government deliver on its energy objectives Commentary from the Hon David Janetzki MP  “Gas has emerged as a critical technology for system reliability and firming as the generation mix changes over time” ― Current inst

  21. Slide 21: Looking Forward

    Looking Forward FY26 Guidance FY2026 Guidance1 Units Lower2 Upper FY25  FY2026 targets ― Continue to grow gas and electricity sales Total gas supply PJ 10.2 11.3 9.4 revenue Daily average gas supply TJ/d 28 31 25.8 ― Reap benefits of cost reductions arising from new TPS and NQGP contracts Gas Sales

  22. Slide 22: Isaac Energy Hub Stage 1 | 112MW Isaac Power Station

    Isaac Energy Hub Stage 1 | 112MW Isaac Power Station

  23. Slide 23: Isaac Energy Hub

    Isaac Energy Hub QPM is developing the Isaac Energy Hub to deliver critical support for Queensland’s Energy Transition Isaac Energy Hub 1 2 3 Gas Production Gas Management Stage 1 IPS Stage 2 IPS + IEH BESS Moranbah Gas Project / Other IEH generation  435PJ 2P Reserves  Collection point for  112M

  24. Slide 24: Feasibility Study Outcomes - Physicals

    Feasibility Study Outcomes - Physicals High confidence operating metrics Feasibility Study Physicals Units Output Physical Nameplate generation capacity MW 111.6 Modelled Life Years 30+ Hourly Gas Consumption TJ/hour 1.0-1.1 xx Daily Gas Supply TJ/day 11 Annual Gas Usage PJ 4.0 Daily Operating Hours

  25. Slide 25: GE LM6000

    GE LM6000 xx GROWING EAST COAST GAS PRODUCTION Page | 25 Page | 25

  26. Slide 26: Feasibility Study Outcomes – Capital Costs

    Feasibility Study Outcomes – Capital Costs Strong certainty on capital costs with majority of capex relating to turbines, secured under fixed price Commentary Feasibility Study Capex Estimate Units Output Capital Costs  Co-locating to existing cleared land, in close proximity to key infrastructure

  27. Slide 27: High Value Gas Turbines Secured

    High Value Gas Turbines Secured QPM has entered into a fixed price contract to acquire 2x 55.8MW gas fired turbines from GE Vernova  Stage 1 of the IPS will involve the installation of 2 x GE LM6000 gas turbines  Demand for gas turbines have experienced an unprecedented surge following increase in

  28. Slide 28: Feasibility Study Outcomes – Compelling Economics

    Feasibility Study Outcomes – Compelling Economics Outstanding financial metrics Commentary Feasibility Study Financials (Real basis) Units Output Price Assumptions1 / Revenue  Will contribute to strong growth in QPM’s revenue 4 Hour Peak Power Price $/MWh 227-264 and earnings Shoulder Power Price $

  29. Slide 29: Funding is Well Progressed

    Funding is Well Progressed ~$113 million Master Lease Agreement (MLA) with Macquarie Bank to underpin timely development of IPS Key Comments Key Terms of MLA1 QPM Counterparty  Isaac Power Station No1 Pty Ltd  The MLA fully funds the two LM6000 gas turbines acquired  QPM Energy Limited, Isaac Ene

  30. Slide 30: Implied Historical Performance

    Implied Historical Performance Based on actual historical Queensland electricity prices, IPS would have outperformed feasibility projections Implied IPS Revenue Based on Historical Qld Electricity Prices  The forecast average annual revenue per the feasibility study for the IPS makes a number of co

  31. Slide 31: IPS to Operate at the Bottom of the Cost Curve

    IPS to Operate at the Bottom of the Cost Curve IPS will be Queensland’s Lowest Cost gas-powered generation (GPG) asset QLD GPG Cost Curve $/MWh 600 500 400 xx 300 200 Darling Downs Condamine Braemar 1 Braemar 2 Swanbank Smithfield Mt Stuart 100 Yarwun Oakey Roma TPS IPS - Cumulative Capacity – 3,538

  32. Slide 32: Straightforward Construction Process

    Straightforward Construction Process IPS to leverage ample existing supporting infrastructure and modular gas turbine units De-risked path to Generation QPM-Controlled from Molecule to Electron  QPM-owned MGP to supply 11TJ / day Supply  QPM-owned Moranbah Processing Facility MGP 435PJ 2P Reserves

  33. Slide 33: Positioned to Capture Attractive Market Dynamics

    Positioned to Capture Attractive Market Dynamics ~$60/MWh SRMC allows the IPS can be dispatched over a longer window vs other gas fired power stations Average Qld Electricity Price per settlement period since 2022 700 Average FY22-FY25 SRMC Daily peak electricity demand 600 typically occurs after su

  34. Slide 34: Ramping up Gas Supply Ahead of IPS

    Ramping up Gas Supply Ahead of IPS High-margin electricity generation from the IPS provides the catalyst for expanded gas supply and investment Targeted Daily Gas Supply Growth +11TJ/day 40 ~37 TJ/day ~13.5PJ/year ~3% of 2P Reserves 35 Stage 1 IPS to use 30 ~10-11TJ/day ~26 TJ/day 25 xx TJ/day 20 15

  35. Slide 35: Appendices

    Ou Appendices

  36. Slide 36: Appendix A: MGP Project Reserves

    Appendix A: MGP Project Reserves Gas Reserves1 The estimated proved and probable reserves, evaluated as of 30 April 2025, are contained within granted Gross (100%) Net2 Petroleum Leases PLs 191, 196, 223 and 224, referred to as the Moranbah Project, located in the Bowen Basin of Category / Subclass

  37. Slide 37: Appendix B: Key Risks

    Appendix B: Key Risks You should be aware that an investment in New Shares involves various risks. This section sets out some of the key risks associated with an investment in New Shares. A number of risks and uncertainties, which are both specific to QPM, and of a more general nature, may adversely

  38. Slide 38: Appendix B: Key Risks (Cont.)

    Appendix B: Key Risks (Cont.) Cont. Environmental bond QPM is the holder of a resource activity environmental authority (EA) over the Moranbah Gas Project. As required under the Mineral and Energy Resources (Financial Provisioning) Act 2018 (Qld), where the estimated environmental rehabilitation cos

  39. Slide 39: Appendix B: Key Risks (Cont.)

    Appendix B: Key Risks (Cont.) Cont, Approvals QPM is in the process of securing approvals to construct and operate the IPS. These approvals, which include environmental and grid connection, have not yet been granted. Delays to receiving these approvals, or not receiving them at all, could have a mat

  40. Slide 40: Appendix B: Key Risks (Cont.)

    Appendix B: Key Risks (Cont.) GENERAL BUSINESS RISKS Occupational health and safety risks QPM’s business will become increasingly exposed to occupational health and safety issues, including the risk of workplace injuries (or death) which may result in workers’ compensation claims, related common law

  41. Slide 41: Appendix B: Key Risks (Cont.)

    Appendix B: Key Risks (Cont.) Cont. Market risk As with all stock market investments, there are risks associated with an investment in QPM. Share prices may rise or fall and the price of QPM shares might trade below or above the issue price for the new shares the subject of this offer. The price at

  42. Slide 42: Appendix C: Foreign Offer Jurisdictions

    Appendix C: Foreign Offer Jurisdictions This document does not constitute an offer of new ordinary shares (“New Shares”) of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, and the New Shares may not be offered or sold,

  43. Slide 43: Appendix C: Foreign Offer Jurisdictions

    Appendix C: Foreign Offer Jurisdictions This Presentation does not constitute an offer of New Shares in any jurisdiction in which it would be unlawful. In particular, this Presentation may not be distributed to any person, and the New Shares may not be offered or sold, in any country outside Austral

  44. Slide 44: Appendix C: Foreign Offer Jurisdictions

    Appendix C: Foreign Offer Jurisdictions Singapore This Presentation and any other materials relating to the New Shares have not been, and will not be, lodged or registered as a prospectus (as defined in the Securities and Futures Act 2001 of Singapore (“SFA”)) in Singapore with the Monetary Authorit

  45. Slide 45: Appendix C: Foreign Offer Jurisdictions

    Appendix C: Foreign Offer Jurisdictions Canada (Ontario and Quebec provinces) This Presentation constitutes an offering of New Shares only in the Provinces of Ontario and Quebec (“Provinces”), only to persons to whom New Shares may be lawfully distributed in the Provinces, and only by persons permit

  46. Slide 46: Appendix C: Foreign Offer Jurisdictions

    Appendix C: Foreign Offer Jurisdictions European Economic Area (“EEA”) In relation to each Member State of the EEA (each a “Relevant State”), this Presentation has not been, and will not be, registered with or approved by any securities regulator in any Relevant State. Accordingly, this Presentation

  47. Slide 47: Contact Us

    Contact Us Level 10 307 Queen St Brisbane QLD 4000 David Wrench Chief Executive Officer QPM Energy Limited ASX:QPM T: +61 7 3517 5900 E: info@qpmenergy.com.au