Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (August 2017)

27 slides from Pure Gold Mining's investor presentation, August 2017

  1. Slide 1: August 2017 PGM:TSX-V

    August 2017 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut

  3. Slide 3: Keys to Success

    Pure Gold Mining KEYS TO SUCCESS TEAM Owners team in place with expert technical knowledge Current mineral resource – 1,648,000 ozs at 8.9 g/t Gold in 5.79 GRADE Mt Indicated and 178,000 ozs at 9.4 g/t Gold in 0.59 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mining distric

  4. Slide 4: Direct Red Lake Experience

    Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac

  5. Slide 5: Capital Structure

    Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at August 2, 2017) Key Shareholders (2) Shares Outstanding 191.5 million Management & Directors 4.9% Options Outstanding Strategic Shareholders 27.3% Weighted average exercise 13.3 million AngloGold Ashanti 10.8% price $0.34 Evanachan Ltd. (Ro

  6. Slide 6: Madsen Gold Project

    Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.65 million oz INDICATED RESOURCE (2) 0.18 million oz INFERRED RESOURCE (2) Madsen Mineral Resource (2): 1,648,000 ozs at 8.9 g/t Gold in 5.79 Mt Indicated 178,000 ozs at 9.4 g/t Gol

  7. Slide 7: +$200 Million of Existing Infrastructure

    Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE(1) (1) Management estimate to replace existing infrastructure at current cost estimates

  8. Slide 8: 2017 Objectives: Focus on Growth

    Pure Gold Mining 2017 OBJECTIVES Focus on Growth Significantly Expanded Resource • Mineral resource updated in August incorporating Pure Gold geological model and 178,000 metres of additional drilling • 1,648,000 ozs at 8.9 g/t Gold in 5.79 Mt Indicated • 178,000 ozs at 9.4 g/t Gold in 0.59 Mt Infer

  9. Slide 9: Roadmap to Value Creation

    Pure Gold Mining ROADMAP TO VALUE CREATION Project Milestones Commence Scoping Satellite Underground Studies Deposits Drill Drilling Results Resource Q2,Q3, Update Q4 Resource Update August 70,000m 2017 Site Visit Drilling October 2017 July Revised Q4 2017 PEA Q3 2017 8

  10. Slide 10: Infrastructure in Place

    Madsen Gold Project INFRASTRUCTURE IN PLACE Tailings Management Facility Shaft Mill Portal and Ramp 200 m

  11. Slide 11: Modern Science Driving Exploration

    Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested section Portal to underground ramp decline 10

  12. Slide 12: Multiple Gold Zones Open for Expansion

    Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Madsen Portal and Ramp 8 Zone Resource1 Ind: 253koz in 379kt @ 20.8 g/t Au Inf: 74koz in 142kt @ 16.3 g/t Au Note: Mine workings and geologic contacts in this image are schematic. (1) See news release August 2, 2017 for disclosure of Mads

  13. Slide 13: New Geologic Understanding

    Pure Gold Mining NEW GEOLOGIC UNDERSTANDING Historic Interpretation • Mineralization modelled as stratabound • Mapped alteration as rock units • Does not explain geometry or relationship • No common link between targets Pure Gold Interpretation • Mineralization structurally controlled • Competence c

  14. Slide 14: Madsen – Starratt Corridor

    Madsen Gold Project MADSEN – STARRATT CORRIDOR • 5 kilometre mineralized system +5 km mineralized system 13

  15. Slide 15: +5km Mineralized System

    Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Significant Gold Mineralized System, Scale Potential • Austin open down plunge - AD-11-01 returns 14.3 g/t gold over 2.0m at 2.1km vertical depth • McVeigh open for expansion – drilling expanding gold mineralization outside of curr

  16. Slide 16: Prospective Folded Geology

    Madsen Gold Project PROSPECTIVE FOLDED GEOLOGY • Madsen host rocks folded along key ultramafic units Fold links prospective host rocks 15

  17. Slide 17: Prospective Folded Geology

    Madsen Gold Project PROSPECTIVE FOLDED GEOLOGY • Prospective targets linked by continuous folded geology 16

  18. Slide 18: Potential for Near Surface Resource

    Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • Satellite gold target located ~1.5 km west of the McVeigh horizon and existing infrastructure • Russet South to be included in planned Q4 2017 resource update • New Zone of Mineralization Discovered PG17-335 returns 4.4 g/t gold over 12.0m including

  19. Slide 19: Russet – 8 Zone Target

    Madsen Gold Project RUSSET – 8 ZONE TARGET • Russet South open down plunge • 8 Zone open up and down plunge Russet South 0m Fork Zone -500m 8 Zone 2m Composites -1000m >3 g/t Au Mineralized Footprint • Inclined long section – 200 metre section width 18

  20. Slide 20: Investment Highlights

    Pure Gold Mining INVESTMENT HIGHLIGHTS High grade deposit in a proven mining jurisdiction Actively growing resource through aggressive exploration program Existing infrastructure on-site contributes to favourable economics Proven management team with experience in Red Lake region Strategic investors

  21. Slide 21: Appendix

    APPENDIX % puregold dream big 20

  22. Slide 22: Current Mineral Resource (August 2017)

    Madsen Gold Project CURRENT MINERAL RESOURCE (August 2017) Grade Contained Gold Resource Classification Tonnes g/t Au (oz.) Indicated 5,785,000 8.9 1,648,000 Inferred 587,000 9.4 178,000 The updated mineral resource estimate for Madsen is reported at a 4.0 g/t Au cut-off effective August 2, 2017 (1)

  23. Slide 23: Preliminary Economic Assessment (April 2016)

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT (April 2016) • Initial PEA (April 2016) shows total gold 2016 PEA (1) production of ~260,000 ounces over a 6.5 year mine life at an average diluted head grade of Pre-Tax / After-Tax IRR 8.3 g/t gold (1) 74% / 62%  Positive base case assessment of

  24. Slide 24: 2016 PEA – Additional Details

    Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re

  25. Slide 25: Benchmarking vs. Peers – Resource Grade

    Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 9.13 M&I Resource Grade (g/t Au) 8.90 8.72 8.42 8.0 5.87 6.0 4.91 4.09 4.0 3.50 2.66 1.63 2.0 0.0 (2) (1) Dalradian Integra Pure Gold Harte Osisko Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Inferr

  26. Slide 26: Benchmarking vs. Peers – Market Cap & P/NAV

    Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 0.97x 1.00x 0.86x 0.84x 0.74x 0.75x Price / NAV 0.50x 0.50x 0.42x 0.41x 0.24x 0.25x 0.00x (2) Sabina Gold Integra Osisko Dalradian Pure Gold Midas Gold ATAC Eastmain Market Capitalization $830 $600 $525 $500 Market Cap (C$mm) $

  27. Slide 27: Corporate Inquiries

    Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca