Vhm Limited · ASX:VHM

Vhm — TZMI Congress 2023

24 slides from Vhm's conference presentation, November 2023

  1. Slide 1: Securing supply of critical minerals for the global energy transition

    Securing supply of critical minerals for the global energy transition TZMI Congress 2023 I Singapore ASX:VHM Acknowledgement of Country VHM acknowledges the Australian Aboriginal and Torres Strait Islander peoples as the first inhabitants of the nation and the traditional custodians of the lands whe

  2. Slide 2: Disclaimer and forward-looking statements

    Disclaimer and forward-looking statements Important Information This presentation has been prepared by VHM Limited ACN 601 004 102 (Company). It contains general Forward looking statements are based on numerous assumptions regarding VHM Limited’s present and future background information only which

  3. Slide 3: VHM Limited (ASX:VHM) overview

    VHM Limited (ASX:VHM) overview Australian owned rare earths and mineral sands Corporate Snapshot1 mine and processing developer Market Cap Top 20 Shareholders GOSCHEN PROJECT3 210Mt @ 3.8% THM, MRE A$96.57M Top 20: 34% 629Mt, 413Kt TREO, Zircon 21.4%, Rutile 9.7%, Ellison WA: 8.9% Mon 3.5%, Xen 0.6%

  4. Slide 4: VHM – Our value proposition

    VHM – Our value proposition Emerging Tier 1 integrated rare earth and minerals sands project with globally significant mineral assemblage​​ Goschen’s Strong Financials: NPV A$1.525B I IRR 44% I Low Capex A$500M I FCF A$270M I Dual commodity stream1 Life of Mine: 20 years I Potential for a further 20

  5. Slide 5: Goschen Project permitting and approval pathway

    Goschen Project permitting and approval pathway We are here Planning Approvals & Construction Operation Closure 2018 – 2020 2021 – 2022 2023 2024 2025– 2026 2026 – 2044 2045  Feasibility studies  Prepare EES  EES Inquiry & Advisory  Production  Phase 1A  End of mining  EES public  Preliminar

  6. Slide 6: Accelerating Goschen towards production in 2025

    Accelerating Goschen towards production in 2025 Public exhibition of Approvals Construction Construction First production Environment Effects (Phase 1 and 1A) commences commences on (Phase 1) Statement for Final Investment (Phase 1) Hydromet Circuit permitting Decision (Phase 1A) Q4 2023 H1 2024 H2

  7. Slide 7: Geology overview

    Geology overview Discovery of a significant critical minerals province 7

  8. Slide 8: Geology overview

    2 1 4 Geology overview 3 Notes: (1): See Company ASX release dated 8 August 2023 (2): See Company ASX release dated 29 September 2023 (3): See Company ASX release dated 16 May 2023 8 (4): See Company ASX release dated 28 March 2023

  9. Slide 9: Geology overview

    3 1 Geology overview 2 Notes: High-grade composite data from (2-4 drill collars) is illustrated for each project area (1): See Company ASX release dated 8 August 2023 (2): See Company ASX release 4 April 2023 9 (3): See Company ASX release 29 September 2023

  10. Slide 10: Conventional low-cost processing

    Conventional low-cost processing Simple, low-risk, proven flowsheet: multiple commodity streams with demonstrated high recoveries High recoveries: Continuous improvements achieved through multiple bulk sample drill programs and metallurgical testwork programs has delivered high recoveries of valuabl

  11. Slide 11: Ore Reserve peer comparison

    Ore Reserve peer comparison Selected Global Rare Earth and Mineral Sand Reserves  Monazite and Xenotime (% in-situ) vs. Zircon (% in-situ)  Bubble size denotes in-situ HM Tonnes (Mt) 0.40% Bubble size denotes in- situ HM tonnes 0.35% Goschen (Area 4 Z5) 0.30% % In-Situ Monazite and Xenotime 0.25%

  12. Slide 12: Global energy transition targets

    Global energy transition targets The catalyst driving demand for rare earth elements and commercialisation of Australia’s critical minerals 87% of Goschen basket value is derived from the critical rare earths crucial for electric vehicles and the green energy transition1. Notes: (1) Rare Earth Marke

  13. Slide 13: Hydromet Pilot Plant results demonstrate potential

    Hydromet Pilot Plant results demonstrate potential Exceptional recoveries meet specifications required by Western strategic offtake partners  Market leading recoveries achieved at ANSTO producing a high purity mixed rare earth carbonate (MREC) product  >97% critical light rare earths Nd/Pr Goschen

  14. Slide 14: Magnet rare earth oxide basket value peer comparison

    Magnet rare earth oxide basket value peer comparison Attractive proportion of valuable rare earth elements – heavy and light (US$/kg) 70 60 Dy Tb 50 US$ of magnet REO per kg of REO Nd Pr 40 30 20 10 0 Hastings VHM Astron Arafura Peak Yangibana Goschen Donald Nolans Ngualla 14 Note: See peer comparis

  15. Slide 15: Upcoming milestones

    Upcoming milestones Advance permitting Finalise offtake Secure arrangements Mineral Resource with the Public with strategic for a Final Investment exploration upside Exhibition of the partners Decision remains to be unlocked Goschen Project Australian owned rare earths and mineral sands developer 15

  16. Slide 16: APPENDIX A Peer Comparison Data

    APPENDIX A Peer Comparison Data

  17. Slide 17: Project comparison data table for Ore Reserve

    Project comparison data table for Ore Reserve % In-situ Titanium % Monazite % In-situ Commodity Reserve Material In-situ HM % Zircon % Rutile % In-situ % In-situ Minerals (rutile, Stage of Company Project Location % HM Grade & Xenotime Monazite & Product Classification tonnes (Mt) tonnes (Mt) Grade

  18. Slide 18: Project comparison table data for rare earth basket value

    Project comparison table data for rare earth basket value Magnet Rare Earth Oxide % Distribution of Rare Earth Product Stage of Name Project Product Neodymium (Nd) Praseodymium (Pr) Dysprosium (Dy) Terbium (Tb) Location Market Cap* Development Arafura1 Nolans Oxide 20.5 5.9 0.3 0.1 DFS N.T. $443.80M

  19. Slide 19: APPENDIX B VHM Board and Management

    APPENDIX B VHM Board and Management

  20. Slide 20: Board and management team

    Board and management team Michael Sheridan BEc, LLB, LLM, GradDipAppFinInv Chief Financial Officer 30+ years’ operations and financial experience as executive, having worked at senior management levels in publicly listed companies, predominantly in the international resources sector (mining and oil

  21. Slide 21: APPENDIX C JORC Tables

    APPENDIX C JORC Tables

  22. Slide 22: Company Ore Reserves

    Company Ore Reserves 210Mt Ore Reserve Note: (1) Any discrepancies in totals are a function of rounding. THM Assemblage and Rare Earth Oxides are reported as a percentage of in-situ THM content. 22 The Ore Reserve was prepared and first disclosed under the JORC Code (2012) in the ASX release dated 1

  23. Slide 23: Company Mineral Resources

    Company Mineral Resources 820Mt Mineral Resource estimate Total Heavy Oversize THM Assemblage(3) Rare Earth Oxides Mineral Material In Situ THM Bulk Density Mineral Slimes material Area Resource TREO + (THM) >2mm Zircon Rutile Leucoxene Ilmenite Monazite Xenotime La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3

  24. Slide 24: vhmltd.com.au

    vhmltd.com.au Level 11, 330 Collins Street, Victoria 3000 For further information contact: Ron Douglas Interim Chief Executive Officer Ron.Douglas@vhmltd.com.au Carly O’Regan Executive General Manager carly.oregan@vhmltd.com.au