Oil India Limited · NSE:OIL
Oil India — Avendus Spark Investor Conference 2025
11 slides from Oil India's conference presentation, Nov 18, 2025
Slide 1: Regulation 30 cover letter to NSE and BSE
oI 3frqd EEqr ft{ft'€ oil lndia Limited e{rt-d {r&Ert A 3ifra tr6 a-6rGT SSEE€ ffifr q'rqfd-q /Corporate Office sfq-d E'rstt / otl House, dd Ei. / Ptot No.1 9, testlSector -164, *rrsr I l,loiOa- 201 30 1F.q. ) (U.P ) qia/Phone: +91 -1 20-24 1 9000 srfiffi€Cqr A Maharatna CPSE under 0t1 tltDlA Govern
Slide 2: Conquering Newer Horizons
Conquering Newer Horizons Avendus Spark Investor Conference 19 NOVEMBER 2025
Slide 3: Key questions we will address today
Key questions we will address today 1 Oil India Scale-Up Plan What is Oil India’s forecasted scale-up plan for Oil and Gas production? What pipeline infrastructure expansion is currently underway to enable 2 Pipeline Infrastructure Expansion production and capacity scale-ups? How will NRL’s operatio
Slide 4: FY25-26 Crude Oil Production Plan: Production to remain steady at 3.5-3.6 MMT
FY25-26 Crude Oil Production Plan: Production to remain steady at 3.5-3.6 1 MMT Crude Oil Production Plan Actual Crude Oil Production (FY 2025-26, MMT) (H1FY26, MMT) 1.692 0.07 0.01 0.15 0.13 3.46 3.5-3.6 Lack of production growth driven by external factors resulting in temporary shutdown and subseq
Slide 5: Gas offtake scale-up plan
Gas offtake scale-up plan: Gas offtake scale-up to be driven by increased 1 offtake to NRL, tea gardens, and operationalization of IGGL feeder-line FY26 FY27 FY28 Particulars Gas Gas Particulars Gas Gas Particulars Gas Gas Offtake Offtake in Offtake Offtake in Offtake Offtake in in BCM MMSCMD in BCM
Slide 6: Pipeline Infrastructure Expansion: pipeline extensions to be operational within timelines
Pipeline Infrastructure Expansion: Raw material and finished product pipeline 2 extensions to be operational within timelines to enable capacity expansion Natural Gas Pipeline Network Crude Oil Pipeline Network Planned Current Current Start Point Pipeline Current Capacit Status/ Start Point Pipeline
Slide 7: Paradip Numaligarh Crude Pipeline (PNCPL) Construction Progress
Pipeline Infrastructure Expansion: Paradip Numaligarh Crude Pipeline 2 (PNCPL) Construction Progress Progress: ~96% RoW opened with ~88% pipeline lowered Balance RoW to open in phases RoW in km. All in km State Scope RoW opened Welding Lowering 74 1,636 1,562 1 Odisha 213 198 185 164 2 West Bengal 4
Slide 8: NRL Capacity Ramp-Up: from 3 MMT to 9 MMT in a phased manner
NRL Capacity Ramp-Up: Capacity to be ramped-up from 3 MMT to 9MMT in a 3 phased manner to ensure seamless transition to expanded operations NRL capacity to ramp-up in a phased manner; 4-4.5 MMT by FY27 and 7.5-8.5 MMT by FY28 NRL Operational Capacity (MMT) 3.5-4 7.5-8.5 1-1.5 4-4.5 3 3 FY25 FY26 FY2
Slide 9: Product Portfolio: Product mix to change post refinery expansion
4 Product Portfolio: Product mix to change post refinery expansion Existing Product Slate: ~70% HSD and ~20% MS Expanded Product Slate: 55-60% HSD and 20-25% MS 2,965 TMT 8,650-9,550 TMT 251 (8%) ~800 (9%) 52 (2%) ~150 (2%) ~350 (4%) ~550 (6%) 640 (22%) 1,800 – 2,300 Others (20 – 25%) LPG Sulphur MS
Slide 10: Petrochemicals: Upcoming greenfield Polypropylene plant
Petrochemicals: Upcoming greenfield Polypropylene plant to supplement 5 NRL's GRM by USD 1 per barrel Key project specifications Current project status and key milestones Basic Capacity: 360 KTPA August 2024: Environment clearance received configuration Lummus Novolen® Technology license NRL's Petro
Slide 11: Thank You
) Thank You et