Robyg — Q1-Q3 2023 Earnings Presentation
61 slides from Robyg's earnings presentation, December 2023

Slide 1: Financial Results 1-3Q 2023
FINANCIAL RESULTS 1-3Q 2023 Warsaw, December 2023 1

Slide 2: Agenda
AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Estimated financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

Slide 3: Part 01 Summary 1-3Q 2023
ROBYG PART 0! Summary 1-3Q 2023

Slide 4: Summary 1-3Q 2023
01. Summary 1-3Q 2023 Summary Operating cash flow: Revenues: Strong cash position*: PLN 170 million PLN 606 million PLN 345 million (excl. purchase of new plots) 4 * Including amounts kept on individual escrow accounts.

Slide 5: Summary – ROBYG Group
01. Summary 1-3Q 2023 Summary – ROBYG Group Developer agreements signed: Units presold: 2 562 2 245 (net after cancellations) (net after cancellations) Number of units under Units on offer: 2 297 construction: 4 275 (out of which 5% finished goods) 5

Slide 6: Summary – Vantage Development Group
01. Summary 1-3Q 2023 Summary – Vantage Development Group Developer agreements signed*: Units presold*: 314 Units rented: 2 230 314 (net after cancellations) (net after cancellations) Number of units under Units on offer: 448 (for sale) Bond issue*: EUR 24 milion construction*: 1 062 (out of which 1

Slide 7: Material acquisitions and financial activities
01. Summary 1-3Q 2023 ROBYG Group – material acquisitions and financial activities Total new financing: PLN 350 million New plots NEW PLOTS FINANCING Wroclaw, Gdansk, Warsaw Total expected potential for construction CREDIT FACILITIES of ca. 56 000 sqm of usable area. • revolwing loan with the limit

Slide 8: Part 02 Presale & revenue perspective
PART 02 Presale & revenue perspective 8

Slide 9: Presale structure – quarterly net units presold
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1-3Q 2023: 2 562 units (22% 1-3Q’23/ 1-3Q’17-22*), PLN 1 497 million (71% 1-3Q’23/ 1-3Q’17-22*) Net number of presold units (quarterly)** 1196 1110 1032 938 894 892 755 776 638 650 445 381 Q4 2020 Q1 2021 Q2 2021 Q3 2021

Slide 10: Presale structure – annual net units presold
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1-3Q 2023: 2 562 units (22% 1-3Q’23/ 1-3Q’17-22*), PLN 1 497 million (71% 1-3Q’23/ 1-3Q’17-22*) Net number of presold units (annually)** 4276 4308 57% 17% 3471 98% -50% -50% -27% 27% 2957 2% -16% 2738 10% 2520 2569 2562

Slide 11: Presale structure by city
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1-3Q 2023: 2 562 units (22% 1-3Q’23/ 1-3Q’17-22*), PLN 1 497 million (71% 1-3Q’23/ 1-3Q’17-22*) Gdansk & Gdynia 42% 1 064 units Poznan 2% 61 units Wroclaw 6% 163 units Warsaw 50% 1 274 units on which 496 units presold in

Slide 12: Units on offer
02. Presales & revenue’s perspective ROBYG Group – units on offer Units on offer FINISHED GOODS 4925 ON OFFER: 6% 27 4386 298 3491 190 2724 4898 2297 4088 166 112 * 3301 2558 2185 3Q 2022 4Q 2022 1Q 2023 2Q 2023 3Q 2023 Units under construction** Units completed * The offer is decreased by 3 commerc

Slide 13: Revenue recognition as at 30 September 2023
02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 30 September 2023) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not recognized*: 2 300 2308 Completed: 115 Under construction: 837 1555 Which construct

Slide 14: Units to be completed in 2023-2024
02. Presales & revenue’s perspective Number of units to be completed in 2023-2024 and also (contracted) until 30 September 2023 Note: Estimation of the completed investments ( may change. Total & Presold 2022 2023 2024 2023+2024 Total units Presold Total units Presold Total units Presold Total units

Slide 15: Number of units to be completed in 2023
02. Presales & revenue’s perspective Number of units to be completed in 2023 Gdansk Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2023 completed in 2023 completed in 2023 Nowa Letnica 390 Mój Ursus 720 Jagodno

Slide 16: Number of units to be completed in 2024
02. Presales & revenue’s perspective Number of units to be completed in 2024 Gdansk Warsaw Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2024 completed in 2024 completed in 2024 Porto 259 Mój Ursus* 678 Początek Piątkowo 153 Se

Slide 17: Part 03 Estimated financial result
PART 03 Estimated financial result 17

Slide 18: Estimated financial results
03. Estimated financial results Estimated financial results (PLNk) Q1-3 2023 Q1-3 2022 Change Revenues 606 288 508 668 19,2% Cost of sales (449 063) (365 396) 22,9% Gross profit on sales 157 225 143 272 9,7% Selling and marketing expenses (25 695) (19 687) 30,5% Administrative expenses (38 746) (35

Slide 19: Estimated financial condition
03. Estimated financial results Estimated financial condition (PLNk) Q3 2023 Q3 2022 Change 2022 Total assets, including: 3 603 492 3 720 856 (3,2%) 3 522 878 Non-current assets, including: 701 847 684 979 2,5% 664 070 Investment properties and investment 491 539 515 726 (4,7%) 517 050 properties un

Slide 20: Estimated statement of cash flow
03. Estimated financial results Estimated statement of cash flow (PLNk) Q1-3 2023 Q1-3 2022 Net cash flows from operating activities, including: 145 844 106 091 Expenditures for the purchase of new plots (24 423) (41 239) Net cash flows from investing activities, including: 65 339 220 286 Proceeds f

Slide 21: Debt financing
03. Estimated financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at September 30th, 2023 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years Total BANK CREDIT 220.88 0.00 0.00 220.88 FACILITIES BONDS 0.00 122.50 237.50 360.00 TOTAL 220.88 122.50 237.50 58

Slide 22: Leverage and collections
03. Estimated financial results Leverage and collections as at September 30th, 2023 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = 0.20 granted – intercompany loans – cash and cash equivalents – amounts kept on individu

Slide 23: Part 04 Plans of ROBYG Group
PART 04 Plans of ROBYG Group 23

Slide 24: Strategy
04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

Slide 25: Strategic goals
04. Plans of ROBYG Group Strategic goals Number of presold of residential units in 2023 app. 3.000 units Maintaining of sales in the years ahead Maintaining the margins Maintaining the adequate level of the land bank Realisation of the ROBYG’s ESG strategy 25

Slide 26: Total land bank
04. Plans of ROBYG Group Total land bank 14 195 units + 2 279 units on offer = 16 492 units Gdansk/Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Śródmieście/Gdansk 820 23% Włochy 2 080 33% Stare Miasto 260 18%

Slide 27: Commercial potential
04. Plans of ROBYG Group Commercial potential = 55 000 sqm of usable area Commercial potential = 55 000 sqm of usable area WROCLAW* POZNAN 35 000 20 000 TOTAL: 55 000 sqm 27 * Preliminary land purchase agreements.

Slide 28: Part 05 ESG
PART 05 ESG Creating people and planet friendly spaces 28

Slide 29: ESG – mission, values, directions
05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

Slide 30: ESG – Environmental dimension, ROBYG for Planet
05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals ROBYG for Planet means that we lead a sustainable development proce

Slide 31: ROBYG Green Standard
05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG GREEN STANDARD 31

Slide 32: ESG – Social dimension, ROBYG for People
05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction For us, construction is part of a new community shaping Strategic Goals process, which combines such el

Slide 33: Human Balance
05. ESG – Social dimension ROBYG FOR PEOPLE HUMAN BALANCE 33

Slide 34: ESG – Governance dimension
05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website www.esg.robyg.pl We act responsibly by choosing to partner with local businesses, ▪ ROBYG ESG Strategy caring for

Slide 35: ESG
05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

Slide 36: Part 06 Appendices
PART 06 Appendices 36

Slide 37: Senior Management Team
06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 15 Y

Slide 38: Ownership structure
06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 38

Slide 39: TAG Immobilien AG consolidated financials
06. Appendices TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) Q1-3 2023 2022 2021 2020 2019 2018 Assets 7 658,4 8 214,6 7 088,6 6 478,0 5 647,0 5 033,3 Equity 3 044,1 3 307,7 3 129,5 2 681,5 2 394,2 2 048,3 EBITDA (adjusted) 182,0 233,5 226,1 222,3 214,7 206,4 Consolidated ne

Slide 40: Investments under construction (1)
06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 40 No. of stages: 8 No. of stages: 14 Stages completed:

Slide 41: Investments under construction (2)
06. Appendices Description of investments – under construction (2) Nowa Letnica Young City 2 Modern City City: Gdansk City: Warsaw City: Warsaw District: Letnica District: Bemowo District: Bemowo No. of stages: 15 No. of stages: 5 No. of stages: 9 Stages completed: 14 Stages completed: 1 Stages comp

Slide 42: Investments under construction (3)
06. Appendices Description of investments – under construction (3) Jagodno Osiedle Życzliwa Praga Nadmotławie Estate City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Tarchomin District: Śródmieście No. of stages: 10 No. of stages: 8 No. of stages: 10 Stages completed: 6 Stages comp

Slide 43: Investments under construction (4)
06. Appendices Description of investments – under construction (4) Moment Mój Ursus Lagom City: Gdansk City: Warsaw City: Gdansk District: Ujeścisko District: Ursus District: Ujeścisko No. of stages: 4 No. of stages: 8 No. of stages: 1 Stages completed: 1 Stages completed: 6 Stages under constructio

Slide 44: Investments under construction (5)
06. Appendices Description of investments – under construction (5) Szumilas Royal Residence Porto City: Gdansk (Kowale) City: Warsaw City: Gdansk District: Wilanów District: Nowy Port No. of stages: 6 No. of stages: 7 No. of stages: 16 Stages completed: 1 Stages completed: 1 Stages completed: 2 Stag

Slide 45: Investments under construction (6)
06. Appendices Description of investments – under construction (6) Sea Salt Początek Piątkowo Sady Ursynów City: Gańsk City: Poznań City: Warsaw District: Zaspa District: Piątkowo District: Ursynów No. of stages: 1 No. of stages: 7 No. of stages: 6 Stages under construction: 1 Stages under construct

Slide 46: Investments under construction (7)
06. Appendices Description of investments – under construction (7) Wiśniowa Aleja VISTA Dożynkowa 43 City: Gdańsk City: Gdańsk City: Wrocław District: Ujeścisko District: Piecki-Migowo District: Krzyki No. of stages: 2 No. of stages: 1 No. of stages: 1 Stages under construction: 2 Stages under const

Slide 47: Investments under construction (8)
06. Appendices Description of investments – under construction (8) Osiedle nad Widawą Rytm Mokotowa Praga Piano City: Wrocław City: Warszawa City: Warszawa District: Psie Pole District: Mokotów District: Praga Południe No. of stages: 1 No. of stages: 4 No. of stages: 1 Stages under construction: 1 S

Slide 48: Investments under construction (9)
06. Appendices Description of investments – under construction (9) Jutrzenki 92 Wendy City: Warszawa City: Gdynia District: Włochy District: Śródmieście No. of stages: 1 No. of stages: 5 Stages under construction: 1 Stages under construction*: 1 No. of units: 133 units No. of units: 780 units Total

Slide 49: Investments completed (1)
06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

Slide 50: Investments completed (2)
06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

Slide 51: Investments completed (3)
06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

Slide 52: Investments completed (4)
06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

Slide 53: Investments completed (5)
06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

Slide 54: Investments completed (6)
06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

Slide 55: Investments completed (7)
06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

Slide 56: Investments completed (8)
06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

Slide 57: Investments completed (9)
06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

Slide 58: Investments completed (10)
06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

Slide 59: Investments completed (11)
06. Appendices Description of investments – completed (11) Kameralna Olszówka Apartamenty przy metrze City: Wrocław City: Warsaw District: Krzyki District: Bemowo No. of stages: 1 No. of stages: 1 No. of units: 55 units No. of units: 88 units Total sellable area: ca. 3,2k sqm Total sellable area: ca

Slide 60: Disclaimer
Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

Slide 61: Summary Q1-3 2023
Summary Q1-3 2023 Please contact us: Units presold: 2 562 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl (22) 419 11 00 Developer agreements signed: 2 245 (net after cancellations) Units on offer: 2 297 (out of which 6% are finished goods) Revenues: PLN 606 million Strong ca
Source: company website
More decks from Robyg S.A.
H1 2026 Earnings Presentation63 slides · September 2026
H1 2026 Earnings Presentation63 slides · September 2026
Investor Presentation (August 2026)57 slides · August 2026
Q1 2026 Earnings Presentation64 slides · June 2026
Investor Presentation (May 2026)113 slides · May 2026
FY2025 Earnings Presentation63 slides · March 2026