  1. Slide 1: Facing Impediments to Growth for 11 Years…

    ENERGY PARTNERS, L.P. Facing Impediments to Growth for 11 Years… January 24, 2008

  2. Slide 2: Forward Looking Statements

    ENERGY PARTNERS, L.P. Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 27A of the Securities Act of 1933, as amended and Section 21E of the Exchange Act of 1934, as amended. Forward looking statements are not guarantees

  3. Slide 3: Use of Non-GAAP Financial Measures

    ENERGY PARTNERS, L.P. Use of Non-GAAP Financial Measures This presentation utilizes the non- non-generally accepted accounting principles financial measures of segment segment distributable cash flow, KMP distributable cash flow, distributable cash flow per unit, unit, earnings before interest, taxe

  4. Slide 4: Agenda

    ENERGY PARTNERS, L.P. Agenda Vision – Rich Kinder Financial Excellence – Park Shaper Operational Excellence – Steve Kean 4

  5. Slide 5: Vision

    ENERGY PARTNERS, L.P. Vision Rich Kinder Chief Executive Officer

  6. Slide 6: Capital Structure

    ENERGY PARTNERS, L.P. Capital Structure Kinder Morgan Energy Partners, L.P. Market Equity (a) $13.3B Debt (b) 7.0B Enterprise Value $20.3B 2008E EBITDA (c) $2.5B 2008E DCF (d) $1.8B Additional Cash Incentive Shares Distribution Distribution KMR KMP (LLC) (Partnership) 72 million i- i-units (a) 176 m

  7. Slide 7: The Kinder Morgan Strategy

    ENERGY PARTNERS, L.P. The Kinder Morgan Strategy Same Strategy Since Inception Focus on stable, fee-based assets which are core to the energy infrastructure of growing markets Increase utilization of assets while controlling costs  Classic fixed cost businesses with little variable costs  Improve

  8. Slide 8: Unmatched Footprint

    ENERGY PARTNERS, L.P. Unmatched Trans Footprint Mountain 2 Cochin Largest independent transporter 2 of petroleum products in the U.S. Pacific  Transport more than 2 million barrels per day (Bbl/d) 2nd largest transporter of natural Trailblazer 2 gas in U.S. (a) REX 3 2  Approximately 22,000 miles

  9. Slide 9: But More Important Than Size – Location, Location, Location

    ENERGY PARTNERS, L.P. But More Important Than Size – Location, Location, Location Demographics: products pipelines and associated terminals serve 9 of 10 fastest growing markets in U.S. (a) Shifting Natural Gas Supply Sources: natural gas pipelines well-positioned in Rockies and Texas High Crude Oil

  10. Slide 10: Well-diversified Asset Base

    ENERGY PARTNERS, L.P. Well-diversified Asset Base KMP CO2 2008 DCF Natural Gas Pipelines 32% CO2 transport and sales Profile (b) 47% Texas Intrastate 68% oil production related 53% Rockies Production hedged (a): Little incidental commodity risk CO2 Natural Gas 2008=83% ($44/Bbl) 28% Pipelines 2009=7

  11. Slide 11: Powerful Combination

    ENERGY PARTNERS, L.P. Powerful Combination 1. Large asset base 2. Well-located 3. Diversified 4. Proven strategy 5. Efficient structure 6. Consistently well-managed Stable Cash Flow with Visible Growth 7

  12. Slide 12: Eleven Years of Consistent Growth

    ENERGY PARTNERS, L.P. Eleven Years of Consistent Growth Total Distributions (GP + LP) ($mm) LP Distribution Per Unit (b) $2,000 $1,843 $4.50 $4.24-$4.32 GP (a) $1,750 $4.00 $3.68 % LP $1,469 $3.50 R = 17 $3.20 $3.32 $1,500 8% CAG $2.96 =4 $1,265 $1,162 $3.00 $2.72 GR $1,250 $2.50 $1,000 CA $827 $978

  13. Slide 13: Significant Historical Returns

    ENERGY PARTNERS, L.P. Significant Historical Returns (a) KMP: 29% CAGR (b) KMR: 14% CAGR (c) Dollars Dollars $1,800 $300 $1,619 Alerian $269 MLP Index $1,500 $260 KMP $235 KMR $1,200 $220 $900 $180 $581 $600 $140 $132 Alerian MLP Index $300 $237 $100 S&P 500 S&P 500 $0 $60 1996 1997 1998 1999 2000 2

  14. Slide 14: Promises Made, Promises Kept

    ENERGY PARTNERS, L.P. Promises Made, Promises Kept Promises Made Promises Kept Budgeted Actual Distribution per unit: Distribution per unit: 2000: $1.60 2000: $1.71 2001: $1.95 2001: $2.15 2002: $2.40 2002: $2.435 2003: $2.63 2003: $2.63 2004: $2.84 2004: $2.87 2005: $3.13 2005: $3.13 2006: $3.28 20

  15. Slide 15: 2008 Partnership Goals

    ENERGY PARTNERS, L.P. 2008 Partnership Goals Distribution Target  $4.02 per unit (16% growth)  Excess coverage of ~$12 million Maintain Solid Balance Sheet  Expansions / acquisitions financed 50% equity, 50% debt Deliver Projects on Time and on Budget 11

  16. Slide 16: Growth Opportunities

    ENERGY PARTNERS, L.P. Growth Opportunities Current Projects (2008-2011) Additional Opportunities Shifting Natural Gas Supply Sources REX Northeast extension, REX/NGPL — Rockies Rockies Express pipeline Chicago project, MEP expansion, KMLP — LNG KM Louisiana pipeline expansion, storage, incremental s

  17. Slide 17: Shifting Natural Gas Supply Sources

    ENERGY PARTNERS, L.P. Shifting Natural Gas Supply Sources Natural Gas Supply % Production Volumes (Bcf/d) 2007E 2013 Change Change Rockies Natural Gas (a) 8.6 11.4 2.8 33% Rockies Barnett Shale Natural Gas (b) 2.1 6.4 4.3 200% production Gulf Coast LNG Imports (a) 0.7 2.8 2.1 300% expected to increa

  18. Slide 18: Newbuild Natural Gas Pipelines

    ENERGY PARTNERS, L.P. Newbuild Natural Gas Pipelines Wyoming Nebraska Indiana Ohio Illinois Colorado Kansas Missouri Oklahoma ROCKIES EXPRESS PIPELINE IN-SERVICE Mississippi ROCKIES EXPRESS PIPELINE Alabama MIDCONTINENT EXPRESS PIPELINE Texas Texas Louisiana KM LOUISIANA PIPELINE KM HEADQUARTERS Roc

  19. Slide 19: Increased Use of Renewable Fuels

    ENERGY PARTNERS, L.P. Increased Use of Renewable Fuels Renewable Fuels Standard (a) New legislation approximately doubles required use of 40 36.0 renewable fuels over next several years; increases Incremental Impact of EISA - 2007 35 EPACT - 2005 even more dramatically long- long-term 30 R CAG (bill

  20. Slide 20: Growing Crude Production from Canadian Oilsands

    ENERGY PARTNERS, L.P. Growing Crude Production from Canadian Oilsands WCSB Crude Production by Type (a) Heavy/Light Crude Differential (b) WTI vs. Mayan Crude Spot Price 4 $20 Oilsands -‘15 Condensate AG R ‘07 ~12 %C 3 Conventional Heavy il sa nds $15 O (MMBbl/d) Conventional Light 3.0 MMBbl/d ($/Bb

  21. Slide 21: High Oil Prices Mean Opportunities for Enhanced Oil Recovery

    ENERGY PARTNERS, L.P. High Oil Prices Mean Opportunities for Enhanced Oil Recovery CO2 Deliveries McElmo Dome 1,500  Premiere Source of CO2 in U.S. Other  ~22 years remaining deliverability  45% KM working interest (37% net revenue (MMcf/d) 1,000 Sheep Mtn interest)  9.5 Tcf of remaining reserve

  22. Slide 22: Increased Production and Use of Heavy Crude

    ENERGY PARTNERS, L.P. Increased Production and Use of Heavy Crude North American Petcoke Production (a) Refiners are converting to handle 120 Rest of N. America 102 heavier crude; Oilsands, South -‘1 GR 100 U.S. Gulf Coast America… (mm dry short tons) ‘07 CA 5 % 80 … Heavier, sour crude produces 8.5

  23. Slide 23: Coal Imports/Exports

    ENERGY PARTNERS, L.P. Coal Imports/Exports Our terminals are well-positioned on coasts and inland waterways to handle either export or import coal U.S. Coal Imports/Exports (a) Coal Imports 120 111 Appalachian coal production declining, U.S. Coal Imports U.S. Coal Exports 100 93 affecting Eastern Ut

  24. Slide 24: Current Projects

    ENERGY PARTNERS, L.P. Current Projects Over $7.0 Billion In Current Projects Estimated Project Expected Project Cost ($mm) Completion Rockies Express $2,445 (a) 2007-2009 Midcontinent Express 660 (a) 2009 KM Louisiana Pipeline 510 2009 CALNEV expansion 425 2011 Trans Mountain – Anchor Loop expansion

  25. Slide 25: On the Drawing Board: $10B+ of Potential Additional Capex

    ENERGY PARTNERS, L.P. On the Drawing Board: $10B+ of Potential Additional Capex (a) 9 Natural Gas 5 1. REX Northeast Extension 10 2. REX/NGPL Chicago Pipeline (b) 3. MEP Expansion 6 4. KMLP Expansion Oilsands 5. TMX2/TMX3 Expansions 2 1 6. Chinook Gulf Coast Pipeline CO2 7. Gulf Coast Pipeline Renew

  26. Slide 26: Future Growth

    ENERGY PARTNERS, L.P. Future Growth Present trends are long-term Other trends will emerge – ethanol transport, carbon capture and storage Management team has consistently identified opportunities over long period of time (1997-2007)  $8.2 billion in acquisitions  $6.5 billion in expansion capital

  27. Slide 27: Financial Excellence

    ENERGY PARTNERS, L.P. Financial Excellence Park Shaper President

  28. Slide 28: ~$15 Billion in Capital Invested To Date

    ENERGY PARTNERS, L.P. ~$15 Billion in Capital Invested To Date (a,b) ($ billions) Total Invested by Type (a,b) Total Invested by Year (a) $9.0 $8.2 $6.5 $3.5 $3.3 $3.3 $6.0 REX/MEP Expansion $3.0 Acquisition $3.0 $2.5 $0.0 $1.9 Acquisitions Expansions $2.0 $1.6 Total Invested by Segment (a,b) $1.5 $

  29. Slide 29: How We Have Done: Acquisitions

    ENERGY PARTNERS, L.P. How We Have Done: Acquisitions ($ millions) Acquisition Performance First- First-year DCF 2007 DCF (a) Acq. Acq. Acq. Acquisition Price Actual Model Variance Actual Model Variance First Dropdown – 1999 (b) $736 $119.6 $88.2 $31.4 $133.5 $84.9 $48.6 Second Dropdown – 2000 (c) 70

  30. Slide 30: How We Have Done: Returns on Capital

    ENERGY PARTNERS, L.P. How We Have Done: Returns on Capital 2000 2001 2002 2003 2004 2005 2006 2007 Segment ROI (a): Products Pipelines 11.9% 11.8% 12.8% 12.9% 12.4% 11.6% 11.8% 13.2% Natural Gas Pipelines 13.3 15.5 12.9 13.5 14.0 15.5 16.7 17.6 CO2 27.5 24.6 22.0 21.9 23.8 25.7 23.1 21.8 Terminals 1

  31. Slide 31: How We Expect to Do: Returns on Major Projects

    ENERGY PARTNERS, L.P. How We Expect to Do: Returns on Major Projects ($ millions) Expansion Capital Analysis Full Year-1 In-service Return on Total EBITDA Invested Segment Cost (a) (Annual) Capital Natural Gas Pipelines $4,044 $452 11.2% Products Pipelines (b) 1,721 211 12.3% Terminals (c) 649 91 14

  32. Slide 32: Return on Investment vs. Cost of Capital

    ENERGY PARTNERS, L.P. Return on Investment vs. Cost of Capital Full In-svc New Projects Actual (prev slide) 2007 KMP ROI: 12.1% 14.1% Cost of Capital Calculation: Equity = 6.5% ÷ 57% x 50% = 5.7% Debt = 6.5% x 50% = 3.3% Total Cost of Capital = 9.0% 9.0% Return above Cost of Capital 3.1% 5.1% In add

  33. Slide 33: Distribution Coverage

    ENERGY PARTNERS, L.P. Distribution Coverage Stable, low-risk assets distribute substantially all of our available cash; consistent with Partnership Agreement Actual coverage typically exceeds budget 2007 2006 2005 Actual Budget Actual Budget Actual Budget DCF (a) $3.65 $3.46 $3.29 $3.32 $3.38 $3.31

  34. Slide 34: How We Will Grow Over the Long-term

    ENERGY PARTNERS, L.P. How We Will Grow Over the Long-term Current expansion projects total approximately $7.0 billion over the next several years Significant increase in CO2 crude oil hedge prices Growth in base business Future expansion and newbuild opportunities – REX extensions, REX/NGPL project,

  35. Slide 35: CO2 Crude Production Hedge Profile

    ENERGY PARTNERS, L.P. CO2 Crude Production Hedge Profile SACROC & Yates Crude Oil Production (a) Avg Hedge Px WTI & WTS $43.97 $49.38 $55.72 $62.54 $74.61 ($/Bbl) (b) 50 Net Equity Production 40 (MBboe/d) 30 20 83% 73% 71% 69% 10 22% 0 2008 2009 2010 2011 2012 Swaps Puts Unhedged % Hedged __________

  36. Slide 36: Subset of Current Projects Secures 8% Growth

    ENERGY PARTNERS, L.P. Subset of Current Projects Secures 8% Growth 8% growth achievable with three components: 1. Increase in average CO2 hedge price from $44 in 2008 to $63 in 2011; currently unhedged barrels at market prices 2. $4.0 billion in natural gas and products pipeline projects Rockies Exp

  37. Slide 37: Subset of Projects Secures 8% Growth

    ENERGY PARTNERS, L.P. Subset of Projects Secures 8% Growth (millions except where noted) 2009 2010 2011 Expansion Capital (a) Natural Gas & Products Pipeline Projects $944 --- $320 CO2 - SACROC and Yates 358 339 273 Illustrative Total $1,302 $339 $592 Incremental Cash Flow Natural Gas & Products Pip

  38. Slide 38: Perceived Impediments to Growth

    ENERGY PARTNERS, L.P. Perceived Impediments to Growth Perceived Impediment Kinder Morgan View Size  Size does potentially make it harder to grow at the same rate as a smaller company. However, size also provides stability, reducing risk  Size provides more opportunities GP Incentive  We have been

  39. Slide 39: Risks

    ENERGY PARTNERS, L.P. Risks Regulatory  Pacific Products Pipeline FERC/CPUC case  Periodic rate reviews  Unexpected policy changes CO2 Crude Oil Production Volumes Construction Cost Overruns Environmental Terrorism Interest Rates  Approximately 50% floating rate debt  Budget assumes flat rates

  40. Slide 40: Kinder Morgan Energy Partners

    KINDER/MORGAN ENERGY PARTNERS, L.P.

  41. Slide 41: Operational Excellence

    ENERGY PARTNERS, L.P. Operational Excellence Steve Kean

  42. Slide 42: Overview

    ENERGY PARTNERS, L.P. Overview Progress on Major Projects Reducing Risk of Significant Incidents in our Operations 38

  43. Slide 43: Operations Goals – Safe, Reliable, Efficient Operations

    ENERGY PARTNERS, L.P. Operations Goals – Safe, Reliable, Efficient Operations Continuous reduction in risk to the public, employees, contractors and the environment Continuous improvement in the efficiency and productivity of existing operations Well-executed expansions and effective integration of

  44. Slide 44: Major Projects – Summary

    ENERGY PARTNERS, L.P. Major Projects – Summary (a) Capex ($mm) – KM Share $2.3 billion of capital projects in Original Current Variance service (33% of total); net Business Unit overrun of less than 1% Natural Gas $3,710 $4,044 $333 Total spend through 2007 $3.4 Products 934 942 8 billion (about 50%

  45. Slide 45: Expansion Challenges

    ENERGY PARTNERS, L.P. Expansion Challenges Construction Labor – availability, cost, skill level Construction Equipment – e.g. high demand for pipeline spreads and specialized equipment Materials and Specially Fabricated Items Regulatory Delays and Permit Conditions – regulatory agencies are responsi

  46. Slide 46: Managing Expansion Risks

    ENERGY PARTNERS, L.P. Managing Expansion Risks Disciplined project approval process  Costs, contingency, required returns and schedule  Customer commitments underlying expansions Risk management  Properly allocate risk between Kinder Morgan and customers  Lock costs in where appropriate Experien

  47. Slide 47: Operations Performance – Safety, Reliability and Efficiency

    ENERGY PARTNERS, L.P. Operations Performance – Safety, Reliability and Efficiency Nature of Challenge: over 600,000 one calls, nearly 50,000 locates annually Progress to-date:  External reporting of performance  Incentive compensation tied to safety and environmental results  Budget process – sep

  48. Slide 48: OSHA Recordable Incidents

    ENERGY PARTNERS, L.P. OSHA Recordable Incidents OSHA Recordable Incidents per 200,000 Hours Worked 7 6.4 6 5 4 3.1 3.2 3 2 2 1.7 1.3 1.25 1 1.1 1.2 1.1 1 0.7 0.2 0.3 0 Natural Gas CO2 Products Terminals KM Canada Pipelines Pipelines 2005 KM 2006 KM 2007 KM Industry Average 44

  49. Slide 49: OSHA Lost Time Cases

    ENERGY PARTNERS, L.P. OSHA Lost Time Cases 5 Lost Time Incidents per 200,000 Hours Worked 4 3.4 3 2 1.4 1.2 1.1 1 1 0.7 0.8 0.7 0.6 0.2 0.2 0.2 0.2 0.3 0 0 Natural Gas CO2 Products Terminals KM Canada Pipelines Pipelines 2005 KM 2006 KM 2007 KM Industry Average 45

  50. Slide 50: Avoidable Vehicle Incidents

    ENERGY PARTNERS, L.P. Avoidable Vehicle Incidents 5 4.5 Avoidable Vehicle Incidents per Million Miles 4 3 2.4 2 1.8 1.2 0.9 0.9 1 0.6 0.7 0.8 0.7 0.7 0.7 0.2 0.3 0 Natural Gas CO2 Products Terminals KM Canada Pipelines Pipelines 2005 KM 2006 KM 2007 KM Industry Average 46

  51. Slide 51: Incidents & Releases: Liquids Pipeline ROW

    ENERGY PARTNERS, L.P. Incidents & Releases: Liquids Pipeline ROW Liquids Pipeline Incidents per 1,000 Miles (a) Liquids Pipeline Release Rate (a) 1.0 0.96 35 34.0 Bbl per billion barrel miles 30 Incidents per 1,000 miles 0.8 Industry 25 Industry Avg. 0.6 20 Avg. 0.45 15.5 0.4 15 0.29 10 6.0 0.2 5 0.

  52. Slide 52: Incidents & Releases: Natural Gas Pipe ROW

    ENERGY PARTNERS, L.P. Incidents & Releases: Natural Gas Pipe ROW Natural Gas Pipeline Release Rate (a) Industry 0.5 Avg. 0.4 Incidents per 1,000 miles 0.35 0.32 0.3 0.27 0.2 0.1 0.0 2005 KM 2006 KM 2007 KM __________________________ (a) An Incident means any of the following events: (1) An event tha

  53. Slide 53: Operations Performance: Continued Focus in 2008

    ENERGY PARTNERS, L.P. Operations Performance: Continued Focus in 2008 Special emphasis on risk reduction at high consequence assets and operations  ROW protection  Pipeline integrity  PSM / RMP facilities Extend existing compliance systems to more assets, more activities and more requirements – e

  54. Slide 54: Conclusions

    ENERGY PARTNERS, L.P. Conclusions Solid performance on our large project slate – but risks remain (particularly on “target price” construction contracts) Continued improvement in operations performance 50