Highway 50 Gold Corp. · TSXV:HWY

Highway 50 Gold — Investor Presentation (March 2026)

18 slides from Highway 50 Gold's investor presentation, March 2026

  1. Slide 1: Highway 50 Gold Corp.

    HIGHWAY 50 GOLD CORP. North-Central Nevada Western Nevada Rift Target Corridor Drill-ready Tier 1 potential gold exploration projects in Nevada March 2026 W: www.highway50gold.com TSX-V: HWY

  2. Slide 2: Forward-Looking Statements

    2 Forward-Looking Statements This presentation contains forward-looking statements and forward-looking Accordingly, the Company cautions that any forward-looking statements are not guarantees information (collectively, “forward-looking statements”) within the meaning of of future results or performa

  3. Slide 3: Highway 50 Gold

    3 Highway 50 Gold • Two 100% owned Tier 1 projects located 100 km west of the Cortez gold district, Nevada – both located on the Northern Nevada Rift Central • Successful management; sold 3 companies • Mine finders: Lindero gold mine currently in production by Fortuna Mining • Management has spent d

  4. Slide 4: Share Structure

    4 Share Structure • Issued and outstanding: 44.5 M • Options outstanding: 4.4 M - $0.30 to $0.70 • Warrants outstanding: 17.3 M - $0.32 to $0.50 • Fully diluted: 66.2 M • $22.2 M market cap • 16% management ownership March 2026 HWY – TSX-V

  5. Slide 5: Leadership Team with Proven Track Record

    5 Leadership Team with Proven Track Record Management Strategic Advisor Gordon P. Leask CEO & Director Megan Cameron-Jones Scott Davis CFO Cal Everett P.Eng. with 35+ years exploration Secretary & Director CPA, CGA, 20+ years experience in finance 14+ years of surface and underground experience. Fou

  6. Slide 6: Management's History of Corporate Transactions

    6 Management’s History of Corporate Transactions March 2026 HWY – TSX-V

  7. Slide 7: North-Central Nevada: Tectonic Elements

    9 North-Central Nevada: Tectonic Elements Highway 50 Gold Corp. Properties: ❑ Gold Knob ❑ Johnson Canyon ❑ Quito North ❑ Golden Brew This slide illustrates most of the crustal array now proposed in northcentral Nevada. March 2026 HWY – TSX-V

  8. Slide 8: Northcentral Nevada Crustal Block Model

    10 Northcentral Nevada Crustal Block Model Identifying locations for focus of major gold system engines. Crustal interference is key to development of large Robust gold systems. March 2026 HWY – TSX-V

  9. Slide 9: Gold Knob Project

    11 Gold Knob Project • Newly recognized location by management of potential major gold system. • Enormous surface gold footprint, likely leakage from a major system at depth. • Property consists of 514 mineral claims. • Work completed: geological mapping and prospecting, biogeochem orientation surve

  10. Slide 10: GOLD KNOB – Gold in Drill Holes

    12 GOLD KNOB – Gold in Drill Holes • The Gold Knob project consists of 514 claims (10,497 acres). • The distribution of gold in shallow drill holes at Gold Knob to the north and Wildhorse to the south shows a clear bias to the direction of the regional crustal west central boundary structure. The go

  11. Slide 11: GOLD KNOB – Drill Hole Locations & Intercepts

    13 GOLD KNOB – Drill Hole Locations & Intercepts • Of particular note is drill hole GK-2, at the northeast corner of Gold Knob. This drill-hole intersected weakly silicified / decalcified limestones grading 0.573 g/t over 17 m. A strong gravity-low / magnetic-low anomaly is evident in recent geophys

  12. Slide 12: GOLD KNOB – Cross Section

    14 GOLD KNOB – Cross Section March 2026 HWY – TSX-V

  13. Slide 13: Quito North Target

    15 Quito North Target • Quito district has pedigree; former high-grade production • Jurassic laccolith with broad thermal aureole • Potential karst collapse feature • Intersection Eastgate Trough and Northern Nevada Rift Central • Apex of breached anticline • Large gold-antimony-arsenic anomaly with

  14. Slide 14: Quito North – Spires Target

    16 Quito North – Spires Target • An extensive alteration zone containing numerous discrete NNW-aligned resistant pinnacles of rusty Fe- dolomite, jasperoid and silica- cemented breccia, containing anomalous Au and As • High-angle structures cut the Roberts Mountain Fm and Upper-plate lithologies • I

  15. Slide 15: Quito Window / Cortez Window Comparison

    17 Quito Window / Cortez Window Comparison March 2026 HWY – TSX-V

  16. Slide 16: Quito North / Cortez Hills Cross Section Comparison

    18 Quito North / Cortez Hills Cross Section Comparison March 2026 HWY – TSX-V

  17. Slide 17: Summary

    19 Summary • Strong property portfolio in favourable political jurisdiction. • Proven geologic terrane for major gold discovery. • Extensive research and distillation process to establish and acquire targets. • 100% ownership. • Large gold footprints on surface for both projects. • Shallow drill-rea

  18. Slide 18: Highway 50 Gold Corp.

    20 Highway 50 Gold Corp. Telephone: Corporate Address: +1 (604) 681-4462 200 Burrard St, Suite 1570, Vancouver, BC V6C 3L6 Gordon P. Leask Legal Counsel: gord@highway50gold.com Maxis Law Corporation, Vancouver BC John M. Leask Auditors: jml@highway50gold.com Davidson & Company LLP, Vancouver Don Mos

Highway 50 Gold — Investor Presentation (March 2026) on 6ix