Prosafe SE · OSL:PRS

Prosafe — Corporate Update (April 2022)

20 slides from Prosafe's corporate update, Apr 6, 2022

  1. Slide 1: Business Update

    Slide 1: Business Update

    April 2022 Business Update

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Restructuring complete YE 2021: Revitalized and well positioned

    Slide 3: Restructuring complete YE 2021: Revitalized and well positioned

    Restructuring complete YE 2021: Revitalized and well positioned A leading owner of semi accommodation units globally  Owner and operator of 7 vessels + 2 newbuilds at yard. Modern fleet  Remaining technical life of the vessels in the fleet ranging between est. 10-30 years  Have taken lead in flee

  4. Slide 4: The financial restructuring in a nut-shell

    Slide 4: The financial restructuring in a nut-shell

    The financial restructuring in a nut-shell Gross debt reduction Key information  $1100m in reduced debt $1100m in  3 tranches: debt reductions • USD 250 million secured in 5 vessels • USD 93 million secured in Safe Notos 1 576 • USD 93 million secured in Safe Eurus (Cosco sellers credit)  Debt to

  5. Slide 5: The largest owner of high-end offshore accommodation vessels

    Slide 5: The largest owner of high-end offshore accommodation vessels

    The largest owner of high-end offshore accommodation vessels - Controls 9 of the global fleet of about 23 vessels (incl. two newbuilds at yard) # vessels per construction year # of competitive accommodation vessels per operator Prosafe Others 14 Prosafe 9 12 Floatel 5 10 Cotemar 2 8 POSH 2 6 CIMC 2

  6. Slide 6: Well positioned towards hook-ups and fields in production

    Slide 6: Well positioned towards hook-ups and fields in production

    Well positioned towards hook-ups and fields in production - MMO as key demand driver Key demand drivers: Key demand drivers Typical Typical project (Example) (Example) BP ETAP: Seagull tie-in New fields Existing fields in production  Hook-up & commissioning  Maintenance & modification  Lifetime e

  7. Slide 7: All vessels working in 2022

    Slide 7: All vessels working in 2022

    All vessels working in 2022 - Except the TSV Safe Scandinavia Contract backlog Contracting update  Safe Boreas: In the yard preparing for a 90-day contract with Petrobras an option of up to 60 days and start-up in Q2 2022 on the NCS  Safe Caledonia: Commenced a 270-day contract plus one 30-day opt

  8. Slide 8: Safe Nova & Safe Vega

    Slide 8: Safe Nova & Safe Vega

    Safe Nova & Safe Vega - Available for delivery Agreed delivery terms with COSCO:  Payment on delivery: $25m each  Sellers Credit: $165m (Nova), $167m (Vega)  Prosafe pays no layup cost or financing cost until delivery  Interest cost and debt repayment dependent on dayrates and earnings achieved.

  9. Slide 9: Order backlog improving and anticipated to further improve

    Slide 9: Order backlog improving and anticipated to further improve

    Order backlog improving and anticipated to further improve - Post-auction discussions ongoing with Petrobras on new contract for Notos, Eurus and Boreas Indicative order backlog (USD million)* Ongoing commercial processes 600  Order backlog increasing and potentially set to grow significantly pendi

  10. Slide 10: Markets tightening in Brazil and the North Sea

    Slide 10: Markets tightening in Brazil and the North Sea

    Markets tightening in Brazil and the North Sea - Positive indicators in North Sea and several new FPSOs coming on stream in Brazil North Sea: # vessels working* Brazil: # vessels working* 9 7 6 6 6 6 6 6 6 6 5 5 5 5 5 2 2016 2017 2018 2019 2020 2021 2022F Competitive 2016 2017 2018 2019 2020 2021 20

  11. Slide 11: Brazil: Increasing activity and focus on high end vessels

    Slide 11: Brazil: Increasing activity and focus on high end vessels

    Brazil: Increasing activity and focus on high end vessels Brazil Brazil FPSO Projects 2022 – 2025 (Source: Petrobras)  20 new FPSOs announced & planned to be installed over the next years  Current FPSO fleet: (Let me revert here…need to ensure  Some of existing fleet to be phased out but large po

  12. Slide 12: North Sea market: High 2022 activity. Positive indicators

    Slide 12: North Sea market: High 2022 activity. Positive indicators

    North Sea market: High 2022 activity. Positive indicators North Sea # Fields in production (source: Spinergie)  The NCS will continue to be attractive driven by cost competitiveness, 400 low emissions, and long-term oriented regulators 350  Norwegian activity is increasing after the introduction o

  13. Slide 13: Our strategic priorities

    Slide 13: Our strategic priorities

    Our strategic priorities A• Will drive consolidation of the offshore accommodation industry B • Will continue to strive for best performance on safety and costs C• Will continue to strive for commercial outperformance D • Will actively address GHG emissions on our vessels 13

  14. Slide 14: Recap: Revitalized and well positioned

    Slide 14: Recap: Revitalized and well positioned

    Recap: Revitalized and well positioned A leading owner of semi accommodation units globally  Owner and operator of 7 vessels + 2 newbuilds at yard. Modern fleet Revitalized with financing through 2025  All time low net debt paving the way for refinancing by end of 2025. Amortizations based on cash

  15. Slide 15: Back-up

    Slide 15: Back-up

    Back-up ey Prosafe

  16. Slide 16: Costs development and -discipline

    Slide 16: Costs development and -discipline

    Costs development and -discipline SG&A* costs down over 60% since 2015 Daily opex down in all regions since 2014 45 Additional projects ongoing: 41 80  Fuel savings 40 40 40 40  Crew optimization 70 35 30 60 30 Opex / day ($k/d) 50 25 mUSD 22 21 40 20 19 15 30 15 14 13 10 20 5 10 0 0 2012 2013 201

  17. Slide 17: Key transaction terms – Safe Eurus, Nova & Vega

    Slide 17: Key transaction terms – Safe Eurus, Nova & Vega

    Key transaction terms – Safe Eurus, Nova & Vega Item Description Delivery 1. Safe Eurus – Delivery before 31st December 2019 Window and 2. Nova/Vega; 1. Delivery of one vessel within 3 years from agreement with COSCO, plus 1 year option (subject to certain conditions) 2. For the other vessel, delive

  18. Slide 18: Completely revitalized since 2015/2016

    Slide 18: Completely revitalized since 2015/2016

    Completely revitalized since 2015/2016 - All time low net debt. Modern fleet. Lean and flexible cost structure. Seasonal cashflow and high potential EBITDA cash conversion Pre downturn Post 2021 Rounded numbers Change (2015/ 2016)* restructuring Net Debt (mUSD) ~ 1200 354 -70 % Interest costs (mUSD)

  19. Slide 19: Efficient cost and spend levels anticipated over the next years

    Slide 19: Efficient cost and spend levels anticipated over the next years

    Efficient cost and spend levels anticipated over the next years - Next SPS’es are in 2024-2026* Opex SPS Schedule  SG&A costs of ca $14m per year 2022 2023 2024 2025 2026 Boreas  Offhire cost of ca $3 – 12k/ day depending on Zephyrus layup mode, duration and location Eurus Notos  Safe Scandinavia

  20. Slide 20: Oil & gas will play a key role in the energy transition

    Slide 20: Oil & gas will play a key role in the energy transition

    Oil& gas will play a key role in the energy transition Outlook Global energy supply according to IEA (EJ) The process of adapting to the energy Stated Policy Scenario Announced Pledges Sustainable transition will be complex and time Scenario Development Scenario 744 consuming. 671 674 651 Oil & gas