Prosafe SE · OSL:PRS
Prosafe — Corporate Update (April 2022)
20 slides from Prosafe's corporate update, Apr 6, 2022

Slide 1: Business Update
April 2022 Business Update

Slide 2: Disclaimer
Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

Slide 3: Restructuring complete YE 2021: Revitalized and well positioned
Restructuring complete YE 2021: Revitalized and well positioned A leading owner of semi accommodation units globally Owner and operator of 7 vessels + 2 newbuilds at yard. Modern fleet Remaining technical life of the vessels in the fleet ranging between est. 10-30 years Have taken lead in flee

Slide 4: The financial restructuring in a nut-shell
The financial restructuring in a nut-shell Gross debt reduction Key information $1100m in reduced debt $1100m in 3 tranches: debt reductions • USD 250 million secured in 5 vessels • USD 93 million secured in Safe Notos 1 576 • USD 93 million secured in Safe Eurus (Cosco sellers credit) Debt to

Slide 5: The largest owner of high-end offshore accommodation vessels
The largest owner of high-end offshore accommodation vessels - Controls 9 of the global fleet of about 23 vessels (incl. two newbuilds at yard) # vessels per construction year # of competitive accommodation vessels per operator Prosafe Others 14 Prosafe 9 12 Floatel 5 10 Cotemar 2 8 POSH 2 6 CIMC 2

Slide 6: Well positioned towards hook-ups and fields in production
Well positioned towards hook-ups and fields in production - MMO as key demand driver Key demand drivers: Key demand drivers Typical Typical project (Example) (Example) BP ETAP: Seagull tie-in New fields Existing fields in production Hook-up & commissioning Maintenance & modification Lifetime e

Slide 7: All vessels working in 2022
All vessels working in 2022 - Except the TSV Safe Scandinavia Contract backlog Contracting update Safe Boreas: In the yard preparing for a 90-day contract with Petrobras an option of up to 60 days and start-up in Q2 2022 on the NCS Safe Caledonia: Commenced a 270-day contract plus one 30-day opt

Slide 8: Safe Nova & Safe Vega
Safe Nova & Safe Vega - Available for delivery Agreed delivery terms with COSCO: Payment on delivery: $25m each Sellers Credit: $165m (Nova), $167m (Vega) Prosafe pays no layup cost or financing cost until delivery Interest cost and debt repayment dependent on dayrates and earnings achieved.

Slide 9: Order backlog improving and anticipated to further improve
Order backlog improving and anticipated to further improve - Post-auction discussions ongoing with Petrobras on new contract for Notos, Eurus and Boreas Indicative order backlog (USD million)* Ongoing commercial processes 600 Order backlog increasing and potentially set to grow significantly pendi

Slide 10: Markets tightening in Brazil and the North Sea
Markets tightening in Brazil and the North Sea - Positive indicators in North Sea and several new FPSOs coming on stream in Brazil North Sea: # vessels working* Brazil: # vessels working* 9 7 6 6 6 6 6 6 6 6 5 5 5 5 5 2 2016 2017 2018 2019 2020 2021 2022F Competitive 2016 2017 2018 2019 2020 2021 20

Slide 11: Brazil: Increasing activity and focus on high end vessels
Brazil: Increasing activity and focus on high end vessels Brazil Brazil FPSO Projects 2022 – 2025 (Source: Petrobras) 20 new FPSOs announced & planned to be installed over the next years Current FPSO fleet: (Let me revert here…need to ensure Some of existing fleet to be phased out but large po

Slide 12: North Sea market: High 2022 activity. Positive indicators
North Sea market: High 2022 activity. Positive indicators North Sea # Fields in production (source: Spinergie) The NCS will continue to be attractive driven by cost competitiveness, 400 low emissions, and long-term oriented regulators 350 Norwegian activity is increasing after the introduction o

Slide 13: Our strategic priorities
Our strategic priorities A• Will drive consolidation of the offshore accommodation industry B • Will continue to strive for best performance on safety and costs C• Will continue to strive for commercial outperformance D • Will actively address GHG emissions on our vessels 13

Slide 14: Recap: Revitalized and well positioned
Recap: Revitalized and well positioned A leading owner of semi accommodation units globally Owner and operator of 7 vessels + 2 newbuilds at yard. Modern fleet Revitalized with financing through 2025 All time low net debt paving the way for refinancing by end of 2025. Amortizations based on cash

Slide 15: Back-up
Back-up ey Prosafe

Slide 16: Costs development and -discipline
Costs development and -discipline SG&A* costs down over 60% since 2015 Daily opex down in all regions since 2014 45 Additional projects ongoing: 41 80 Fuel savings 40 40 40 40 Crew optimization 70 35 30 60 30 Opex / day ($k/d) 50 25 mUSD 22 21 40 20 19 15 30 15 14 13 10 20 5 10 0 0 2012 2013 201

Slide 17: Key transaction terms – Safe Eurus, Nova & Vega
Key transaction terms – Safe Eurus, Nova & Vega Item Description Delivery 1. Safe Eurus – Delivery before 31st December 2019 Window and 2. Nova/Vega; 1. Delivery of one vessel within 3 years from agreement with COSCO, plus 1 year option (subject to certain conditions) 2. For the other vessel, delive

Slide 18: Completely revitalized since 2015/2016
Completely revitalized since 2015/2016 - All time low net debt. Modern fleet. Lean and flexible cost structure. Seasonal cashflow and high potential EBITDA cash conversion Pre downturn Post 2021 Rounded numbers Change (2015/ 2016)* restructuring Net Debt (mUSD) ~ 1200 354 -70 % Interest costs (mUSD)

Slide 19: Efficient cost and spend levels anticipated over the next years
Efficient cost and spend levels anticipated over the next years - Next SPS’es are in 2024-2026* Opex SPS Schedule SG&A costs of ca $14m per year 2022 2023 2024 2025 2026 Boreas Offhire cost of ca $3 – 12k/ day depending on Zephyrus layup mode, duration and location Eurus Notos Safe Scandinavia

Slide 20: Oil & gas will play a key role in the energy transition
Oil& gas will play a key role in the energy transition Outlook Global energy supply according to IEA (EJ) The process of adapting to the energy Stated Policy Scenario Announced Pledges Sustainable transition will be complex and time Scenario Development Scenario 744 consuming. 671 674 651 Oil & gas
Source: Internet Archive copy of prosafe.com
More decks from Prosafe SE
Pareto Securities Energy Conference 202616 slides · September 2026
Q2 2026 Earnings Presentation35 slides · Aug 28, 2026
Q1 2026 Earnings Presentation37 slides · Jun 1, 2026
Q4 2025 Earnings Presentation35 slides · Feb 26, 2026
Investor Presentation (January 2026)38 slides · January 2026
Q3 2025 Earnings Presentation44 slides · Nov 13, 2025