Slide 1: A New Frontier for Copper
TSX.V : VMS FSE: DM8 OTC: VMSSF A New Frontier for Copper vortexmetals.com Investor Presentation 2024
Slide 2: Disclaimer
Disclaimer The Company uses a number of financial measures to assess its performance. Some of these measures are not calculated in accordance with Generally Accepted Accounting Principles (GAAP), which are based on International Financial Reporting Standards (IFRS) as issued by the International Acc
Slide 3: No De-carbonization Without Copper
No De-carbonization Without Copper “By 2030, Copper demand from the energy transition, is estimated to grow nearly 600% to 5.4MT in the base case and 900% to 8.7MT in the case of hyper adoption of green technologies” Copper Supply and Demand Imbalance May Likely Grow1 Persistent decline in Copper di
Slide 4: Diversified Copper Exploration Portfolio
Diversified Copper Exploration Portfolio The inclusion of an emerging VMS copper-gold belt in Mexico and a developing brownfield copper project in Chile Advanced Copper Brownfield in Chile A fully permitted, Copper project in Choapa Province of Chile ROFR on the adjacent Rio 27 Mine, with a current
Slide 5: Management & Board
Management & Board Management VIKAS RANJAN MICHAEL WILLIAMS KEVIN MA Team Co-Founder, CEO & Director Co-Founder, Chairman & Director CFO Management professional with 25+ years’ Senior executive with 24+ years in mining, Kevin Ma is a seasoned Chief Financial Officer experience in finance, capital ma
Slide 6: Illapel Copper Project, Chile
Illapel Copper Project, Chile Manto type Stratabound deposit Three mineral leases totaling ~6,000 Ha Rights of First Refusal on Rio 27 RIO 27 Mine mine, with a current probable, in- dicated, and inferred resource of 6.2M tons source internal estimate (non 43-101 compliant)1 Favorable Geology Extends
Slide 7: Illapel Visualization
Illapel Visualization N10°E-Striking vein at Ventana IV in northern portion of the concession package. Vein contains chalcocite, CuCO3 and CuOx. Where mineralization intersects impermeable volcanic rocks, it tends to form tight veins with little dissemination in the wall-rock. Chalcocite with CuCO3
Slide 8: TSX.V : VMS FSE: DM8 OTC: VMSSF
TSX.V : VMS FSE: DM8 OTC: VMSSF 8
Slide 9: Project Overview
Project Overview The Illapel Copper Gold project is located in the Commune of Illapel, Choapa Province, the Fourth Region of Chile - 250 km north of Santiago Infrastucture Highlights Proximity to major infrastructure, paved roads, power grid and water 5 km from Central Transmission Line SIC Low Elev
Slide 10: Project Highlights
Project Highlights Source: 1. Purocobre Website Proximity to El Espino: Receiving an estimated value of US $380 million with annual expected production of 26,000 mt of fine copper and 13,000 oz of gold.1 Option to acquire up to an 80% Interest in the Illapel Copper Project, includes ROFR on the Rio
Slide 11: 2024 Exploration Program
2024 Exploration Program Exploration permits for the property have already been obtained for drilling and exploration Phase-1 Exploration – 2024 Plan Test high-priority, drill-ready targets immediately to the north and south along strike from the Rio 27 mine Map, sample and test drill-targets associ
Slide 12: TSX.V : VMS FSE: DM8 OTC: VMSSF
TSX.V : VMS FSE: DM8 OTC: VMSSF 12
Slide 13: North Rio 27 Mine Target
North Rio 27 Mine Target High-priority, drill-ready targets immediately to the north along strike General view of mineralized structure North of Rio 27 mine from the Rio 27 mine TSX.V : VMS FSE: DM8 OTC: VMSSF 13
Slide 14: Epithermal Vein Targets
Epithermal Vein Targets Epithermal veins in the western portion of the concession area Up to 4g Au at surface TSX.V : VMS FSE: DM8 OTC: VMSSF 14
Slide 15: VMS Projects, Mexico
VMS Projects, Mexico Volcanogenic massive sulphide ore deposit (VMS) Five high potential target areas have been identified on the basis of geology, geochemistry, and geophysics Analogous to large VMS deposits in Latin America, including Tambo Grande, San Nicholas, and Campo Morado. Three mineral lea
Slide 16: VMS Exploration Projects
VMS Exploration Projects Vortex Metals controls two of three high potential VMS exploration plays in the region. Renowned VMS expert, Jim Franklin has proposed that the geological setting is similar to the world class Noranda VMS Camp. Multiple high grade drill targets identified at each project sup
Slide 17: Project Location Map
Project Location Map Multiple High-Grade Drill Targets Drill Permitting Underway Access to infrastructure Local Support 17
Slide 18: Riqueza Marina Target Areas
Riqueza Marina Target Areas Extensive outcrops and subcrops of high-grade mineralized (Cu-Au-Pb-Zn) gossan occur along a 3km strike length at priority West and East Gossan targets Multiple areas of high-grade (>0.5% Cu) surface mineralization Large Gravity Anomalies may represent buried massive sulf
Slide 19: Copper Mineralization
Copper Mineralization West and East Gossan Targets Project Samples to date: 863 Rock Chip Samples 740 Soil samples (XRF analyses) 46 Stream sediment COPPER GOLD 10 > 10% CU 1 > 2.0 G/T AU 26 > 1.0% CU 13 > 0.2 G/T AU 59 > 0.5% CU 59 > 0.5% CU 97 > 0.2% CU 17 > 0.1 G/T AU All true gossan samples (n=2
Slide 20: Zaachila Claim
Zaachila Claim VORTEX METALS SECURES COMMUNITY APPROVAL FOR VMS COPPER-GOLD ZAACHILA PROJECT Click Here to veiw March 12th 2024 News Release Rocks consist of Cretaceous meta-volcanic and sedimentary rocks which include pillow basalts, andesites, rhyolite tuffs/ flows/domes, and an extensive silica e
Slide 21: Capital Structure
Capital Structure TSX.V : VMS FSE: DM8 OTC: VMSSF Total Shares Outstanding (Post Financing) 79,524,503 Warrants & Options 16,362,122 (Exercise Price C$0.20) 6,639,900 (Exercise Price C$0.135) 9,684,705 Founders & Insiders (Key Affiliates) Approx. 35% Post Money TSX.V : VMS FSE: DM8 OTC: VMSSF 21