    Forward Looking Statements and Non-GAAP Measures Certain statements in this presentation constitute "Forward-Looking Statements" within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and Canadian securities legislation. This presentation contains Forward-Looking Statements,

  3. Slide 3: Operational Turnaround Progressing

    Operational Turnaround Progressing • Caeté was commissioned in 3Q Gold Production (000 oz) 2010 and has been ramping up on plan 45 • Switch to cut and fill methodology at Turmalina is now complete 40 • Mill issues at Caeté have been resolved 35 • Management changes have been made at all three Jaguar

  4. Slide 4: Key Operating Metrics - consolidated

    Key Operating Metrics - consolidated Q3 YTD 2010 Q3 YTD 2011 % Change Development (km) 13.9 18.6 +34 % Stopes 30 43 +43 % Working Faces 55 91 +65 % Tonnes Mined 1,031,433 1,325,314 +28% Ore Processed (tonnes) 1,141,063 1,323,792 +16 % Gold Produced (oz) 103,185 122,366 +19 % JAGUAR MINING INC. 4

  5. Slide 5: Third Quarter Highlights

    Third Quarter Highlights • Record total of 41,390 ounces of gold sold • Record total revenue of $70.0 million • Total gold production of 40,660 ounces • Record cash operating margin of $806 per ounce • Operating profit of $6.7 million • Cash provided by operating activities totaled $30.0 million or

  6. Slide 6: Operating Cash Cost and Margin per Oz.

    Operating Cash Cost and Margin per Oz. $1,800 $1,600 $1,400 $806 $1,200 $708 $659 $1,000 $483 $800 $511 $431 $600 $364 $237 $886 $400 $732 $727 $799 $429 $468 $200 $370 $346 $0 2006 2007 2008 2009 2010 Q1 2011 Q2 2011 Q3 2011 Cash Cost Cash Margin JAGUAR MINING INC. 6

  7. Slide 7: Consolidated Cost Reconciliation

    Consolidated Cost Reconciliation Q2 2011 Operating Cash Cost/Oz. $799 Exchange Rate Variance ($21) Volume Variance ($38) Recovery Grade Variance $59 Regular Labor Expense $38 Incentive Bonus and Catch-up from June Contract $47 Other $2 Q3 2011 Operating Cash Cost/Oz. $886 JAGUAR MINING INC. 7

  8. Slide 8: Turmalina Complex

    Turmalina Complex Resources and Reserves (oz) Reserves 523,630 M + I Resources 856,300 Production (oz) 3Q 2011 YTD 47,930 3Q 2010 YTD 49,206 Cash Cost ($/oz) Q3 2011 $906 Q3 2010 $912  Key personnel changes complete Gold Production (oz.) 20,000  Switch to cut and fill mining methodology complete 1

  9. Slide 9: Turmalina Mine Development

    Turmalina Mine Development • Record 2.2 kilometers of underground development completed in 3Q 2011 •Total of 12 months advanced development completed •10.4 km of underground drilling completed in Q3 2011 Ore Body C Ore Body A Ore body B Level 4 Level 5 Completed 2010 Level 6 Completed 2011 (Level 7)

  10. Slide 10: Turmalina Resources and Exploration

    Turmalina Resources and Exploration Faina Target M+I = 444,400 oz Avg. 3.57 g/t Turmalina Mine Fex Pontal Target A and B ore bodies Penha Belt M+I = 112,000 oz M + I: 456,000 oz Avg. 2.76 g/t (500 m depth) Pontal C Ore Body Fex Target M+I = 178,000 oz Drilling: 3 m @ 4.40 g/t (300 m depth) 3 m @ 2.9

  11. Slide 11: Faina, Pontal & Body D Mineral Resources

    Faina, Pontal & Body D Mineral Resources • New study indicates an increase of over 250,000 M+I gold ounces Average Average Average Average Measured Indicated M+I Inferred M+I Inferred Target Grade Grade Grade Grade (t) (t) (t) (t) (oz Au) (oz Au) (g/t) (g/t) (g/t) (g/t) Faina 139,200 4.32 3,211,600

  12. Slide 12: Caeté Complex

    Caeté Complex Resources and Reserves (oz) Reserves 523,630 M + I Resources 856,300 Production (oz) Q3 2011 YTD 32,987 Q3 2010 YTD 5,139 Cash Cost ($/oz) Q3 2011 $841 Q3 2010 $732  Mill issues of 2Q 2011 were resolved early Gold Production (oz.) in 3Q 2011 20,000  Completed 11.2 km drilling in Q3 2

  13. Slide 13: Roça Grande Mine Development

    Roça Grande Mine Development • 7.6 km of underground development completed Q3 2011 YTD • Total of 18 months mining equivalent advanced development • 11.2 km of underground drilling completed in Q3 2011 1195 LEVEL 1 1195 Ore Body A 1120 LEVEL 2 1120 LEVEL 3 1045 Access Ramp 1045 LEVEL 4 RG 2 970 970

  14. Slide 14: Paciência Complex

    Paciência Complex Resources and Reserves (oz) Reserves 523,630 M + I Resources 856,300 Production (oz) Q3 2011 YTD 32,949 Q3 2010 YTD 45,479 Average Cash Cost ($/oz) Q3 2011 YTD $683 Q3 2010 YTD $789  Completed 2.7 km drilling in Q3 2011 Average Cash Cost/oz  Production from Pilar mine has been sh

  15. Slide 15: Santa Isabel Mine Development

    Santa Isabel Mine Development •2.2 kilometers of underground development completed in 3Q 2011 • Total of 12 months advanced development completed • 2.7 km of underground drilling completed in Q3 2011 1150 Ore Body A and B Ore Body C 1100 1050 1000 950 900 Level 4 Access to NW-1 850 ( Marzagão) ~ 1 k

  16. Slide 16: Ball Mill Remediation Plan

    Ball Mill Remediation Plan • Replacing obsolete solid shaft with modern, segmented shaft and reducer system • Installation of optimized drive pinion to reduce vibration • To be implemented on 3 ball mills over the next 5 months JAGUAR MINING INC. 16

  17. Slide 17: Gurupi Project Update

    Gurupi Project Update

  18. Slide 18: Gurupi Project Status

    Gurupi Project Status • Board of Directors has approved continued development of project and it is advancing • Construction work on infrastructure is continuing • New housing for relocating families is under construction • Detailed engineering is approximately 15 percent complete • Issuance of insta

  19. Slide 19: Centro Novo Village Construction

    Centro Novo Village Construction JAGUAR MINING INC. 19

  20. Slide 20: Gurupi Initial Drilling Results

    Gurupi Initial Drilling Results • Initial results are encouraging and suggest down-dip mineralization continuity • Preliminary results from a couple of deep holes at Chega Tudo suggest the extension of the mineralization to approximately 300 meters • Approximately 65 percent (14,346 meters) of the p

  21. Slide 21: Gurupi Drilling Program - Cipoeiro 3D View

    Gurupi Drilling Program - Cipoeiro 3D View JAGUAR MINING INC. 21

  22. Slide 22: Gurupi Drilling Program – Initial Results

    Gurupi Drilling Program – Initial Results Cipoeiro Drilling Results Hole From (m) To (m) Au (g/t) Length (m) Type of Intersection 0.00 36.00 0.75 36.00 Step-out 115.75 117.70 11.61 1.95 Step-out FCP0010 169.00 186.00 0.70 17.00 169.00 170.00 5.08 1.00 Step-out 185.00 186.00 3.93 1.00 61.70 73.00 2.0

  23. Slide 23: Gurupi Drilling Program - Chega Tudo 3D View

    Gurupi Drilling Program - Chega Tudo 3D View JAGUAR MINING INC. 23

  24. Slide 24: Chega Tudo Cross Section A

    Chega Tudo Cross Section A JAGUAR MINING INC. 24

  25. Slide 25: Chega Tudo Cross Section B

    Chega Tudo Cross Section B JAGUAR MINING INC. 25

  26. Slide 26: Gurupi Drilling Program – Initial Results

    Gurupi Drilling Program – Initial Results Chega Tudo - Drilling Results Hole From (m) To (m) Au (g/t) Length (m) Type of Intersection 69.10 76.10 1.20 7.00 Infill FCTU0003 164.10 178.10 1.00 14.00 Step-out 177.10 178.10 5.29 1.00 FCTU0004 117.00 126.00 0.99 9.00 Infill 85.00 101.00 2.11 16.00 Infill

  27. Slide 27: Financing and Capital Structure

    Financing and Capital Structure • We are considering project financing as well as general capital requirements • Seeking to strengthen our balance sheet and more closely align stakeholder interests with corporate goals and objectives • We have reviewed numerous term sheets with several different fin

  28. Slide 28: Summary

    Summary • Turnaround efforts and plans to improve current operations are progressing and driving measurable results • We are successfully addressing some of the key mechanical issues we have experienced and the impact of these will be temporary • The Gurupi project is progressing and is now enhanced