New Age Exploration Limited · ASX:NAE

New Age Exploration — Corporate Update (November 2014)

19 slides from New Age Exploration's corporate update, November 2014

  1. Slide 1: Lochinvar Coal Scoping Study Outcomes

    Slide 1: Lochinvar Coal Scoping Study Outcomes

    LOCHINVAR COAL SCOPING STUDY OUTCOMES Community Briefing November 2014

  2. Slide 2: Project Background

    Slide 2: Project Background

    Project Background • 1960’s & 1980s NCB drilling & seismic • 2012 LCL Northern licence granted • 2013 LCL Phase 1a 4 boreholes drilled & historic seismic interpreted • 2014 LCL Southern Licence granted • 2014 LCL Phase 1b 6 boreholes drilled • 2014 LCL Scoping Study 2

  3. Slide 3: Project Stages

    Slide 3: Project Stages

    Project Stages 2013-14 Phase 1A 2014 Phase 1B 2015-16 2014 Scoping Study Exploration Exploration Exploration 2015-16 2016 Planning 2015 Pre- 2016 Feasibility Environmental Application to Feasibility Study Study Impact Assessment Mine 2017 Construction 2018 Production Ongoing Community Engagement Thr

  4. Slide 4: What do we mean by Scoping Study

    Slide 4: What do we mean by Scoping Study

    What do we mean by “Scoping Study” • What is a scoping study? – A preliminary technical and economic assessment of a project – Identification of the key project risks • What is the purpose of a scoping study? – To form a view on whether further expenditure on the project is justified • Key Points –

  5. Slide 5: Mine Conceptual Image

    Slide 5: Mine Conceptual Image

    Mine Conceptual Image Reject Stockpile ~ cre =< ROM Stockpile — Sibateens— YT me Railway Siding — Final Product Stockpile (YY Le J Reject Storage 2 Pa Park a xg Oa ™ Laydown Area Drift Portal Office / Workshops ;~ Mined Out Area Longwall Face es Pritt Conveyor Coal Seams NEW AGE Exploration Ventilat

  6. Slide 6: Scoping Study Parameters

    Slide 6: Scoping Study Parameters

    Scoping Study Parameters Mine Access and Ventilation Development • Drift: roof supported conveyor, men and • 3 x continuous miner/bolters for materials vehicle access via 6m underground roadway development diameter drift • Ventilation: 5m vertical shaft • 2.0m minimum height • Roadways supported wit

  7. Slide 7: Scoping Study Parameters

    Slide 7: Scoping Study Parameters

    Scoping Study Parameters Longwall Production Coal Processing • Single bi-directional longwall shearer- • 60,000 t capacity ROM stockpile fed by 1.8m to 3.6m shearer cutting height mine conveyor, front end loader feeds • Panels 140m-200m wide and 500m-4km crusher long • 400 t/h wash plant to handle u

  8. Slide 8: Scoping Study Parameters

    Slide 8: Scoping Study Parameters

    Scoping Study Parameters Rejects Management Mine Infrastructure Area (MIA) • Fine rejects thickened, belt press filtered • Compact MIA (location TBD) and co-disposed with coarse rejects • MIA Includes: drift entrance, ROM stockpile, crushing and screening, wash plant, product • Reject material then

  9. Slide 9: Scoping Study Results

    Slide 9: Scoping Study Results

    Scoping Study Results Strong Economics and Project Fundamentals Coal Price Sensitivity • Valuation - Attractive investment at • Long Term Hard Coking Coal (HCC) forecast long term coal prices (but not Benchmark forecast price of viable on today’s coal prices) US$165/t used by NAE is within range • £

  10. Slide 10: Environmental & Community Impact Assessment

    Slide 10: Environmental & Community Impact Assessment

    Environmental & Community Impact Assessment Air Quality Sustainable Development Cradle to Grave Sustainability 10

  11. Slide 11: Environmental Impact Assessment

    Slide 11: Environmental Impact Assessment

    Environmental Impact Assessment • Wildlife - Flora and fauna study & potential impacts • Groundwater - Piezometer network, aquifer modelling, conductivity & water balance studies • Water Quality - Stream, River & Solway monitoring • Flows - Surface water features studies, monitoring & potential impa

  12. Slide 12: Community Impacts Assessment

    Slide 12: Community Impacts Assessment

    Community Impacts Assessment • Infrastructure - Assessing impacts on; traffic and road conditions, rail, power, public safety, and utilities • Noise & Air Quality - Measuring baseline levels of existing industry, farming, road & rail noise to identify optimum design to mitigate effects from operatio

  13. Slide 13: 2015-2016 Exploration

    Slide 13: 2015-2016 Exploration

    2015-2016 Exploration • Drilling • 2km Roadside Seismic 59 Partial Core Holes Trial 30 Open Holes • 2D Seismic lines Testing of coal quality and 57km of lines to survey gas content 17km historic lines to 4 Piezometer Installations process • Field Mapping • 3D Seismic 3 X 150Ha 3D Patches to survey M

  14. Slide 14: Drilling – Future Program

    Slide 14: Drilling – Future Program

    Drilling – Future Program Drilling • 59 Partial Core Holes • 30 Open Holes • 4 Piezometer Installations • Drill hole spacing typically 500m apart (ranges from 250m to 1000m) • LAA, SEA, CARs, Class 53 or Class 54 • All holes grouted and pressure tested using approved sealing procedure Rehabilitated

  15. Slide 15: Seismic Surveys

    Slide 15: Seismic Surveys

    Seismic Surveys • Seismic Trial (1 month) • 2D Vibroseis - 57km of seismic lines (4-5 days per km) • 3D Vibroseis - 3 x 150Ha seismic patches (~4 weeks per patch) Steps Involved in Seismic Surveys: 1. Survey of surface topography, source & geophone locations 2. Seismic crew lay out cables & geophone

  16. Slide 16: Community Benefits

    Slide 16: Community Benefits

    Community Benefits • Local jobs Exploration (2015/16) - 12 jobs Construction (2017) - 270 to 810 jobs Operations (2018 on) - 270 direct jobs Operators, Trades (mechanical and electrical), Supervisors, Management, Professional, and Administration • Local employment maximised as far as possible • Trai

  17. Slide 17: The Next Stages

    Slide 17: The Next Stages

    The Next Stages Qi Qi Q2 Q3 Q4 Qi a4 Q1 Q2 Q3 Q4 Exploration Access and Approvals in Exploration Drilling and Coal Analysis | Environmental Impact Assessment ee Pre-Feasibility Study Planning Approvals and Financing Definitive Feasibility Study | ss NEW AGE Exploration

  18. Slide 18: Community Engagement

    Slide 18: Community Engagement

    Community Engagement • How would you like to communicate? • Information evenings • Newsletters • Media • Mail, email, phone, visits….. • How would you prefer to be approached regarding exploration access for drilling and seismic surveys? • Zone of exploration maps for people to directly approach us

  19. Slide 19: Questions…

    Slide 19: Questions…

    Questions… For further information please feel welcome to contact us directly: Donna Sheehy Exploration Manager Wyseby Office Kirtlebridge, Dumfries and Galloway DG113AN M: 07715 084750 P: 01461 500990 E: donnasheehy@nae.net.au Or Visit our website: www.nae.net.au 19

Source: Internet Archive copy of nae.net.au