Slide 1: Lochinvar Coal Scoping Study Outcomes
LOCHINVAR COAL SCOPING STUDY OUTCOMES Community Briefing November 2014

Slide 2: Project Background
Project Background • 1960’s & 1980s NCB drilling & seismic • 2012 LCL Northern licence granted • 2013 LCL Phase 1a 4 boreholes drilled & historic seismic interpreted • 2014 LCL Southern Licence granted • 2014 LCL Phase 1b 6 boreholes drilled • 2014 LCL Scoping Study 2

Slide 3: Project Stages
Project Stages 2013-14 Phase 1A 2014 Phase 1B 2015-16 2014 Scoping Study Exploration Exploration Exploration 2015-16 2016 Planning 2015 Pre- 2016 Feasibility Environmental Application to Feasibility Study Study Impact Assessment Mine 2017 Construction 2018 Production Ongoing Community Engagement Thr

Slide 4: What do we mean by Scoping Study
What do we mean by “Scoping Study” • What is a scoping study? – A preliminary technical and economic assessment of a project – Identification of the key project risks • What is the purpose of a scoping study? – To form a view on whether further expenditure on the project is justified • Key Points –

Slide 5: Mine Conceptual Image
Mine Conceptual Image Reject Stockpile ~ cre =< ROM Stockpile — Sibateens— YT me Railway Siding — Final Product Stockpile (YY Le J Reject Storage 2 Pa Park a xg Oa ™ Laydown Area Drift Portal Office / Workshops ;~ Mined Out Area Longwall Face es Pritt Conveyor Coal Seams NEW AGE Exploration Ventilat

Slide 6: Scoping Study Parameters
Scoping Study Parameters Mine Access and Ventilation Development • Drift: roof supported conveyor, men and • 3 x continuous miner/bolters for materials vehicle access via 6m underground roadway development diameter drift • Ventilation: 5m vertical shaft • 2.0m minimum height • Roadways supported wit

Slide 7: Scoping Study Parameters
Scoping Study Parameters Longwall Production Coal Processing • Single bi-directional longwall shearer- • 60,000 t capacity ROM stockpile fed by 1.8m to 3.6m shearer cutting height mine conveyor, front end loader feeds • Panels 140m-200m wide and 500m-4km crusher long • 400 t/h wash plant to handle u

Slide 8: Scoping Study Parameters
Scoping Study Parameters Rejects Management Mine Infrastructure Area (MIA) • Fine rejects thickened, belt press filtered • Compact MIA (location TBD) and co-disposed with coarse rejects • MIA Includes: drift entrance, ROM stockpile, crushing and screening, wash plant, product • Reject material then

Slide 9: Scoping Study Results
Scoping Study Results Strong Economics and Project Fundamentals Coal Price Sensitivity • Valuation - Attractive investment at • Long Term Hard Coking Coal (HCC) forecast long term coal prices (but not Benchmark forecast price of viable on today’s coal prices) US$165/t used by NAE is within range • £

Slide 10: Environmental & Community Impact Assessment
Environmental & Community Impact Assessment Air Quality Sustainable Development Cradle to Grave Sustainability 10

Slide 11: Environmental Impact Assessment
Environmental Impact Assessment • Wildlife - Flora and fauna study & potential impacts • Groundwater - Piezometer network, aquifer modelling, conductivity & water balance studies • Water Quality - Stream, River & Solway monitoring • Flows - Surface water features studies, monitoring & potential impa

Slide 12: Community Impacts Assessment
Community Impacts Assessment • Infrastructure - Assessing impacts on; traffic and road conditions, rail, power, public safety, and utilities • Noise & Air Quality - Measuring baseline levels of existing industry, farming, road & rail noise to identify optimum design to mitigate effects from operatio

Slide 13: 2015-2016 Exploration
2015-2016 Exploration • Drilling • 2km Roadside Seismic 59 Partial Core Holes Trial 30 Open Holes • 2D Seismic lines Testing of coal quality and 57km of lines to survey gas content 17km historic lines to 4 Piezometer Installations process • Field Mapping • 3D Seismic 3 X 150Ha 3D Patches to survey M

Slide 14: Drilling – Future Program
Drilling – Future Program Drilling • 59 Partial Core Holes • 30 Open Holes • 4 Piezometer Installations • Drill hole spacing typically 500m apart (ranges from 250m to 1000m) • LAA, SEA, CARs, Class 53 or Class 54 • All holes grouted and pressure tested using approved sealing procedure Rehabilitated

Slide 15: Seismic Surveys
Seismic Surveys • Seismic Trial (1 month) • 2D Vibroseis - 57km of seismic lines (4-5 days per km) • 3D Vibroseis - 3 x 150Ha seismic patches (~4 weeks per patch) Steps Involved in Seismic Surveys: 1. Survey of surface topography, source & geophone locations 2. Seismic crew lay out cables & geophone

Slide 16: Community Benefits
Community Benefits • Local jobs Exploration (2015/16) - 12 jobs Construction (2017) - 270 to 810 jobs Operations (2018 on) - 270 direct jobs Operators, Trades (mechanical and electrical), Supervisors, Management, Professional, and Administration • Local employment maximised as far as possible • Trai

Slide 17: The Next Stages
The Next Stages Qi Qi Q2 Q3 Q4 Qi a4 Q1 Q2 Q3 Q4 Exploration Access and Approvals in Exploration Drilling and Coal Analysis | Environmental Impact Assessment ee Pre-Feasibility Study Planning Approvals and Financing Definitive Feasibility Study | ss NEW AGE Exploration

Slide 18: Community Engagement
Community Engagement • How would you like to communicate? • Information evenings • Newsletters • Media • Mail, email, phone, visits….. • How would you prefer to be approached regarding exploration access for drilling and seismic surveys? • Zone of exploration maps for people to directly approach us

Slide 19: Questions…
Questions… For further information please feel welcome to contact us directly: Donna Sheehy Exploration Manager Wyseby Office Kirtlebridge, Dumfries and Galloway DG113AN M: 07715 084750 P: 01461 500990 E: donnasheehy@nae.net.au Or Visit our website: www.nae.net.au 19
Source: Internet Archive copy of nae.net.au
More decks from New Age Exploration Limited
Investor Presentation (June 2026)15 slides · June 2026
FAME conference, IOM3, London 201822 slides · December 2018
Shareholder Meeting (November 2018)24 slides · Nov 28, 2018
Shareholder Meeting (July 2018)29 slides · Jul 26, 2018
Beer & Co Tin Conference 201719 slides · Nov 8, 2017
Beer & Co Tin Conference 201720 slides · Nov 3, 2017