Noront Resources — Investor Presentation (2017)
32 slides from Noront Resources's investor presentation, 2017
Slide 1: Corporate Presentation Q3 2017
CORPORATE PRESENTATION Q3 2017 NORONT RESOURCES 1
Slide 2: Cautionary Note Regarding Forward-Looking Information
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation. Examples of such forward-looking information includes information regarding the timing, extent and success of explo
Slide 3: North America's Next Mining District
NORTH AMERICA’S NEXT MINING DISTRICT COMMENTARY RING OF FIRE LOCATION • 2007 Discovered Eagle’s Nest Ni-Cu-PGE deposit • 2008 Blackbird Chromite discovery • 2012 Positive Feasibility Study on Eagle’s Nest • 2014 Ontario government committed C$1bn to Ring of Fire infrastructure development • 2015 Ame
Slide 4: Consolidation of the Ring of Fire Camp
CONSOLIDATION OF THE RING OF FIRE CAMP District Scale Play RING OF FIRE SUDBURY BASIN Sudbury Basin 5000 0 5000 10000 Podolsky (meters) Coleman Morrison Strathcona Mill McCreedy West Nickel Rim South Clarabelle Mill Smelter Copper Cliff Victoria Creighton Legend Current and Former Mines Totten Mills
Slide 5: Noront Management & Board
NORONT MANAGEMENT & BOARD MANAGEMENT Alan Coutts 30 years of domestic and international experience in mine development and operations with Falconbridge, President & CEO Noranda and most recently Managing Director, Australasia with Xstrata Nickel Stephen Flewelling 35 years of experience in all aspec
Slide 6: Corporate Information
CORPORATE INFORMATION Overview Listing TSX-V Symbol NOT September 30, 2017 $0.31 52 Week High $0.52 52 Week Low $0.22 Market Capitalization ~ $103.8 M Shares O/S ~ 340.4 M Shares F/D ~ 404.6 M Long Term Debt 1,2 US$ 40 M Major Shareholders Resource Capital Funds 19.1% Baosteel 6.7% 1. RCF Loan (secu
Slide 7: Deep Project Pipeline
DEEP PROJECT PIPELINE A World-Class Nickel Deposit and Chromite Resource DEVELOPMENT STRATEGY Thunder Bird • First mine will be Eagle’s Nest – Ni-Cu-PGM Kyle Butler deposit JJJ McFaulds Blackbird • Followed by the development of the nearby AT-12 Eagle's Nest Blackbird Chromite deposit Black Thor Big
Slide 8: Regional Infrastructure
REGIONAL INFRASTRUCTURE Key to Development of the Ring of Fire • 2014: The Province of Ontario committed $1 billion for Ring of Fire infrastructure development • 2015-16: The province, communities and industry collaborate on various studies and analysis • 2017: Announcement by Ontario of funding for
Slide 9: Ring of Fire's First Development
RING OF FIRE’S FIRST DEVELOPMENT Eagle’s Nest Nickel-Copper-PGE Deposit EAGLE’S NEST MINE COMMENTARY N Esker Camp Portal Area S • 2012 Positive Feasibility Study on Eagle’s Nest 2.5km to Airstrip Surface − After tax NPV (8%) of $C543mm with 28% IRR1 − Resource development has potential to extend min
Slide 10: Eagle's Nest Reserves & Resources
EAGLE’S NEST RESERVES & RESOURCES High Grade Nickel-Copper-PGM Mineral Reserve & Resource 1 Eagle’s Nest Metal in Concentrate Category T (000) Ni (%) Cu (%) Pt (gpt) Pd (gpt) 34.2M lbs of Ni per annum 19.2M lbs of Cu per annum Proven & Probable 11,131 1.68 0.87 0.89 3.09 23,470 oz of Pt per annum In
Slide 11: Attractive Cost Profile
ATTRACTIVE COST PROFILE Potential to be a First Quartile Nickel Producer 2017 Global Nickel Industry C1 cash cost, USD per pound of nickel Eagle’s Nest (projected C1: US$1.54/lb) Positioned to be one of the lowest operating cost nickel mines in the world at US$1.54/lb net of byproduct credits assumi
Slide 12: Nickel Outlook
NICKEL OUTLOOK Nickel in Electric Vehicle (EV) Batteries Changes the Market Place • Nickel demand to increase hugely from Electric Vehicle batteries • Ni-Mn-Co (NMC) cathodes are emerging as the dominant choice due to high energy density requirements • Ni accounts for as much as 55 – 70% of metallic
Slide 13: Nickel Outlook
NICKEL OUTLOOK There is a Declining Sulphide Nickel Supply • Strong demand for sulphide nickel in non-stainless steel applications • Growing demand is driven by aerospace and battery sectors • Very limited new supply coming on line with a shortfall of new mining projects in the pipeline and smelter
Slide 14: Nickel Outlook
NICKEL OUTLOOK Price Recovery – More Positive Fundamentals • Nickel supply deficit will continue; stocks returning to a level which will support higher prices • Growing overall demand driven by Chinese stainless and electric vehicles/batteries • Limited new supply with dearth of major capital projec
Slide 15: Eagle's Nest Project Timeline
EAGLE’S NEST PROJECT Project Timeline 2017 2018 2019 2020 2021 2022 Community Dialogue PDA and IBA Negotiations Update Eagle’s Nest Feas. Detailed Engineering Mine Site EA Permitting Finance (3 Phases) Construction Commissioning Production 15
Slide 16: Ring of Fire Chromite Deposits
RING OF FIRE CHROMITE DEPOSITS A World-Class Chrome Resource Tonnes Tonnes Blackbird1 Cr2O3 (%) Black Thor2 Cr2O3 (%) (millions) (millions) Measured 9.3 37.44 Measured 107.6 32.2 Indicated 11.2 34.36 Indicated 30.2 28.9 Measured and Indicated 20.5 35.76 Measured and Indicated 137.7 31.5 Inferred 23.
Slide 17: Noront Chromite Strategy
NORONT CHROMITE STRATEGY • Use the development of Eagle’s Nest infrastructure (camp, mine, airstrip and road construction) to support initial chromite mine • Produce a Ferrochrome product for sale into the US market • Stage 1: Moderate-sized Mine/Smelter development concurrent with Eagle’s Nest (200
Slide 18: Stage 1 Chromite Development
STAGE 1 CHROMITE DEVELOPMENT Blackbird Mine COMMENTARY • Blackbird contains 18 million tonnes of measured and indicated resource • Close proximity to Eagle’s Nest (less than 1km) • 15-year mine life at 500,000 tonnes per annum of 38-40% Cr2O3 ore • Capital costs estimated at $200 million • 70% Recov
Slide 19: Stage 1 Chromite Development: Ferrochrome Smelter
STAGE 1 CHROMITE DEVELOPMENT Ferrochrome Smelter • Initial capital development of $1,200 million – $200 million mine – $1,000 million Ferrochrome smelter • Locate Ferrochrome smelter on Ontario Brownfield site − Potential sites in Sault Ste. Marie, Thunder Bay, Timmins and Sudbury − Key factors incl
Slide 20: Ferrochrome Processing Plant
FERROCHROME PROCESSING PLANT Proposed Plant Lay-out 20
Slide 21: Noront FeCr Cost Competitiveness
NORONT FeCr COST COMPETIVENESS Base case scenario cost curve 2017 USDc/lb Cr contained, CIF US (Alabama) 12.3 Mt Demand 200 China Turkey 150 Zimbabwe Noront India Russia 100 Kazakhstan Canada 50 South Africa Other 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Operating capacity Million tonnes 1. Based on a
Slide 22: Ferrochrome & Stainless Steel Growth
FERROCHROME & STAINLESS STEEL GROWTH CHROMITE CONCEPT ANNUAL GROWTH OF SS • Chromite ore (FeCr2O4) is mined and concentrated then smelted into Compound Annual Growth: 5.80% Ferrochrome (FeCr) • Ferrochrome is used in the manufacture of Stainless Steel (SS) • All Stainless Steel requires 12-18% Chrom
Slide 23: North American Stainless Steel Production
NORTH AMERICAN STAINLESS STEEL (SS) PRODUCTION NA SS Market & Production SS Production by Region • NA SS market is small, 2005 Rest of World 3% 2015 Rest of World 1% representing roughly 7% of China 13% EU-27 17% world production EU-27 34% China Americas 52% 7% • There is no Ferrochrome production i
Slide 24: Ring of Fire Exploration Upside
RING OF FIRE EXPLORATION UPSIDE: Significant potential for additional discoveries • Ring of Fire geology is poorly exposed (no outcrop) with challenging access, so additional discoveries are likely with further exploration • Traditional Archean greenstone volcanic belt terrain with multiple commodit
Slide 25: Ring of Fire VMS Potential
RING OF FIRE VMS POTENTIAL McFaulds and Butler Cu-Zn Trend • McFaulds #1 and #3 VMS (Volcanogenic Massive Sulphide) deposits are the centerpiece of an 80 claim property held 85% by Noront and 15% by KWG Resources • The Butler claim block consists of 77 claims covering a well-defined VMS trend (75% N
Slide 26: Ring of Fire Social License
RING OF FIRE SOCIAL LICENSE Enhanced Community Engagement • Noront has spent the past 5 years engaging, learning and listening to communities • Regularly meet with Chiefs and Councils • Held numerous town hall meetings and formal open houses with local communities • Meetings held in both English and
Slide 27: Why Noront?
WHY NORONT? • Exceptional land package and project pipeline in Ontario • Multiple commodities in an emerging metals camp • Controlling interest in all major Ring of Fire discoveries to date. • First class management team and Board of Directors with proven success in discovery, finance, construction
Slide 28: Corporate Presentation Q2 2017
CORPORATE PRESENTATION Q2 2017 NORONT RESOURCES 28
Slide 29: Appendix
APPENDIX 29
Slide 30: Ring of Fire Consolidation
RING OF FIRE CONSOLIDATION Acquisition of Cliffs Chromite & MacDonald Mines Properties • In March 2015, Noront acquired the Ring of Fire assets held by Cliffs Natural Resources Inc. (NYSE: CLF) for USD$27.5 M, funded by Franco-Nevada Corp. (NYSE/TSX: FNV) • Cliffs originally purchased these assets f
Slide 31: Eagle's Nest Deposit
EAGLE’S NEST DEPOSIT Feasibility Study – September 2012 Production • Mining Life – 11 years (Potential for 9 additional years) • Mining Rate – 1,095,000 t/a; 3,000 t/d • Average Production – 150,000 dry t/a of concentrating containing: – 15,500 t of nickel – 8,700 t of copper – 23,400 oz of platinum
Slide 32: Eagle's Nest 2012 Feasibility Study
EAGLE’S NEST 2012 FEASIBILITY STUDY Capital and Operating Cost Estimates Pre-Production Capital: LOM Average Operating Costs: • $609 M, comprising • $97/t Ore milled, comprising. − $195 M Mining − $34/t Mining − $113 M Processing − $33/t Processing − $100 M Infrastructure − $21/t General & Administr