Venus Metals Corporation Limited · ASX:VMC

Venus Metals — Investor Presentation (September 2007)

14 slides from Venus Metals's investor presentation, September 2007

  1. Slide 1: Venus Resources (ABN 99 123 250 582)

    ABN 99 123 250582

  2. Slide 2: Disclaimer

    Disclaimer • This presentation has been prepared by Venus Resources Limited (ABN 99 123 250 582) (“Venus”) based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and concl

  3. Slide 3: Exploring for Proterozoic Aged Diamond Bearing Lamproite Pipes under Devonian Cover

    Exploring for Proterozoic Aged Diamond Bearing Lamproite Pipes under younger Devonian Cover Rocks north of the Argyle Diamond Mine

  4. Slide 4: Venus Resources Location Plan

    Venus Resources Location Plan “Nearology” Factor…..Tenements adjacent to Argyle Mining Lease

  5. Slide 5: Venus Resources Tenement Location Plan

    Venus Resources Tenement Location Plan The Argyle North tenement area is secured by EL80/3253, a 224 km2 area located 20 km north of the Argyle Diamond Mine and covering 31 km of Nth-Sth strike. Argyle Mining Lease

  6. Slide 6: Company Details Directors and Management

    Company Details Directors and Management • Shares on Issue : 25,237,501 • Terry Hogan (Chairman) • Options (ex 20/25c) : 7,100,000 • Simon Coxhell (Exec Director) • Top 20 hold : 17,793,858 (70.50%) • Matthew Hogan (Director) • Current Share Price : 70 cents • Craig Rosendorff (Director) • Year Low

  7. Slide 7: Achievements to Date

    Achievements to Date • Native Title Negotiations to commence exploration successfully completed • On Ground Heritage Survey completed (no sites of significance) • Programme of Work lodged with DOIR. Approved • DIA Negotiations concluded. Approved • 30 kilometres of Access Tracks Completed • Drill Ri

  8. Slide 8: Devonian Cover Rocks: Venus Tenement E80/3253

    Devonian Cover Rocks: Venus Tenement E80/3253 Younger rocks cover approximately 80% of the Venus tenement and cover the northerly extension of the Glenhill Fault system

  9. Slide 9: Drill Targets on Aerial Photo

    Drill Targets on Aerial Photo 2 km

  10. Slide 10: Target 1 and Geological Model

    Target 1 and Geological Model

  11. Slide 11: Spine of Quartz Breccia adjacent to Target 1

    1430 ppm Barium Spine of Quartz Breccia adjacent to Target 1 and location of anomalous geochemistry result

  12. Slide 12: Traditional Owners of E80/3253 during Heritage Clearance Survey

    Traditional Owners of E80/3253 with Matthew Hogan during Heritage Clearance Survey

  13. Slide 13: Drill Access tracks over Target 1: Drill Ready

    Drill Access tracks over Target 1: “Drill Ready”

  14. Slide 14: Game Plan Second Quarter 2007

    Game Plan Second Quarter 2007 • Commence Drilling Mid September • 6 Targets • Approximately 4000 metres of RC Drilling • Drill Through Devonian Cover (50-100m?) • Testing Underlying Proterozoic Rocks • Geochemistry and Petrology • Other elements: Uranium ? • Results due: Late November/Early December

Venus Metals — Investor Presentation (September 2007) on 6ix