Slide 1: Corporate Presentation
CORPORATE PRESENTATION PASE BLOCK, ACEH PROVINCE, INDONESIA EXTENSION PHASE 2012 - 2032 FEBRUARY 2015

Slide 2: Important Notice
Important No+ce The informa-on in this presenta-on is in summary form and should not be relied upon as a complete and accurate representa-on of any ma7ers that a poten-al investor should consider in evalua-ng Triangle Energy (Global) Ltd. While management has taken every effort to ensure the accuracy

Slide 3: The New Indonesian Energy Sector
The New Indonesian DRAFT Energy Sector Recently elected Indonesian President Joko Widodo’s is a strong political leader focused on accelerating the country’s energy sector to satisfy growing consumption. Government Initiates: Open the Indonesian economy; investment & Encouraging Improve underdevelop

Slide 4: The New Indonesian Energy Sector
The New Indonesian DRAFT Energy Sector 4

Slide 5: The New Indonesian Energy Sector
The New Indonesian DRAFT Energy Sector 5

Slide 6: The Company
The Company Triangle has been awarded a 20 year extension to the Pase Production Sharing Contract (PSC) with effect from February 2012. Triangle has been the successful operator of the PSC from August 2009 to current. The Pase PSC is located in Aceh Province, North Sumatra, Indonesia and covers a bl

Slide 7: Pase PSC Operational Background
Pase PSC Opera+onal Background Triangle purchased the PSC from Exxon-Mobil in Feb 2009 and has since achieved operational excellence • Developed the project from shut-in / brownfield stage to production within 6 months • Generated over $65mm in revenue from a project depleated in by a multi national

Slide 8: Aceh & Sumatra Region Energy Infrastructure
Aceh & Sumatra Region Energy Infrastructure DRAFT Pase is located in the Aceh region in North Sumatra which has an established gas infrastructure and supply facilities to cater to the growing Asian energy markets as well as local gas markets. The Aceh region is now linked to the central Sumatra Corr

Slide 9: Pase Contract Terms
Pase Contract Terms DRAFT • Contract Type: Production Sharing Contract • Period: 20 Years (2012 -2032) • Acreage: 922km2 • After Tax Revenue Split: Government APGE Gas 70% 30% Oil 85% 15% • Working Interest: Aceh Pase Global Energy Pte Ltd (APGE), Operator, 100% • APGE was incorporated in Singapore

Slide 10: Pase Multiple Opportunities
Pase Mul+ple Opportuni+es Pase I Arun Pase II (Triangle) (ExxonMobil) (Triangle) Pase I & II working area is 922km² located adjacent to Block B which is operated by ExxonMobil & contains the Arun mega gas field (approx. 20Tcf) 10

Slide 11: Pase Inventory of Prospects & Leads
Pase Inventory of Prospects & LDRAFT eads RECOVERABLE LEAD / PLAY RESOURCES PROSPECT (P50) XE Julurayeu-‐Ketapang Clas-c 60 MMBO Priority #1 XF Julurayeu-‐Ketapang Clas-c 3 MMBO XH Peutu Fracture Carbonate 30 BCF Priority #2 XK Peutu Reef 540 BCF XL Peutu Reef 128 BCF XC Peutu Fracture Carbonate 1

Slide 12: Pase Priority of Projects
Pase Priority of Projects DRAFT RANKING PROJECT XF Lead (Pase old oil field extension ) -‐ Shallow Oil Opportuni-es 1 2 XK Prospects -‐ Carbonate Reef Gas Prospects Re-‐development of Pase A & B Produc-on Field -‐ Fractured Carbonate proven reserve 3 4 XC Prospect (C1 Gas discovery re-‐drill) -

Slide 13: Pase Economic Valuations
Pase Economic Valua+ons DRAFT Prospect IRR % NPV 10% Govt Triangle Pay-‐out ($MM) Net Cash Net Cash Time Flow Flow (Years) ($MM) ($MM) XF (Shallow Oil) 35 6.6 81 13 2.83 XK (Reef Play) 37 201 1,226 525 3.98 Pase A&B Infill 23 23 155 66 3.81 Assumptions: Oil price: $60/barrel Gas price: $7/MMBTU 13

Slide 14: Pase 5 Year Work & Seismic Program
Pase DRAFT 5 Year Work & Seismic Program Pase I Arun Pase II (Triangle) (ExxonMobil) (Triangle) Arun XE XF XL XC XK SLS A&D Exploration Well 2D Seismic Survey Pase A A-10 3D Seismic Survey 14

Slide 15: XF Lead Proven Oil Discovery
XF Lead Proven Oil Discovery • The play was proven by Pase Old Oil Field in B Block, discovered in 1935. • Produc-on commenced in 1937 with a peak produc-on reaching 3,000 BOPD. • Pase old oil field was abandoned in 1943 due to WWII with cumula-ve produc-on of 600,000 bbls. Es-mate remaining recovera

Slide 16: XF Lead Proven Oil Discovery
XF Lead Proven Oil Discovery • Explora+on Plan Ø 25 sq.km Shallow 3D Seismic survey. Ø 1 Explora-on Well + 1 Appraisal Well • Development Plan Ø 6 Development Well Ø Produc-on Facili-es • Economic: Ø Assuming oil price $60/barrel 16

Slide 17: XK, XL & SLSD Extension Carbonate Reef Gas Prospects
XK, XL & SLSD Extension Carbonate Reef Gas Prospects Substan-al reef plays proven by surrounding gas fields discovery: Ø Arun gas field 20 TCF (3,500 mmscfd*) Ø SLSD (250 mmscfd*) Ø SLSA (200 mmscfd*) Ø SLSB (250 mmscfd*) *Note: Peak producEon rates The prospects are all located close in close pro

Slide 18: XK Prospect
XK Prospect XK XK Prospect Line 69-4 18

Slide 19: XK Prospect line 69-4
oil gas energy le energy iang — _— % s Se z q t co composite ine 18 TGURIGeS RR DCES, T 1 Ampiteses Resize? Reakzed) 1 Ampbtudes N ji \) ee : NON ys SJ 19

Slide 20: XK Prospect Exploration Plan
XK Prospect Explora+on Plan Exploration Plan Economic Indicator • Drill 1 Exploration Well, 1 Appraisal Well IRR 47% • Acquire 150 sq.km 3D Seismic Development Plan NPV (10%) $294 MM • Drill 6 Development Wells, 1 Injector Well • Production Facilities, Pipeline tie into Exxon Mobil’s NCF $752 MM SLS

Slide 21: Re-development of Pase A & B Field Three Infill Opportunities
Re-‐development of Pase A & B Field Three Infill Opportuni+es DRAFT Opportunity 1: BP-‐2 Sidetrack-‐1 BP-‐2 3 a^c gas opportuniEes A-‐8 ST3 already idenEfied by A-‐9 preliminary technical studies Opportunity 2: and further 3D seismic studies A-‐10 planned. A-‐6 Opportunity 3: A-‐1 Sidetrack-

Slide 22: Re-development of Pase A & B Field Opportunity 1
Re-‐development of Pase A & B Field Opportunity 1 DRAFT • Arc gas accumula-on immediately adjacent and up dip from exis-ng well A1 which ini-ally produced 100mmscfd • 8” flow line and produc-on facili-es connected to adjacent well A1 Reserves (in BCF) GIIP GIIP TOTAL PORE FRACTURE PASE A&B 265 325 5

Slide 23: Pase 3 Year Exploration Work Plan
Pase DRAFT 3 Year Explora+on Work Plan Years Ac+vi+es Descrip+on Budget ($MM) Remarks 2015 G&G Studies Seismic Repro, Passive 0.50 Seismic 3D Seismic Survey & 235.0 km² 8.50 To cover all prospect and Processing leads in Pase Block 1 2016 G&G Studies Seismic Interpreta-on, 0.25 Reprocessing Explora-o

Slide 24: Pase 1st Oil and Gas Test Work Schedule
Pase 1st Oil and Gas Test Work Schedule DRAFT 24

Slide 25: Aceh Corporate & Social Responsibility
Aceh DRAFT Corporate & Social Responsibility DRAFT(CSR) Triangle’s Acehnese Community Development Program focuses on local health, education and economic development. Triangle continues to carry out regular CSR support: • Maintenance on roads, bridges and local infrastructure • Provide medical suppl

Slide 26: Goshawk Energy - ATP1186
Goshawk Energy -‐ ATP1186 Triangle farms into ATP1186 in the Surat Basin, Queensland DRIVERS Proven oil producing area Large license area (936km2) located in proven oil system in the Surat Basin in which over 100 hydrocarbon accumula-ons have been discovered High working interest in highly prospec-

Slide 27: Goshawk Energy - ATP1186
Goshawk Energy -‐ ATP1186 27

Slide 28: Corporate Structure
Triangle Energy (Global) Limited Corporate Structure Issued Capital Market Capitalisa+on Ordinary Shares 2,704M $0.002 per share $5.410M Unlisted rights 59.55M (Closing price 18 January 2015) ASX Code: TEG 28

Slide 29: Board of Directors
Board of Directors Board of Directors Edward Farrell (Non-Executive Chairman) Robert Towner (Managing Director & CEO) Darren Bromley (Executive Director, Company Secretary & CFO) Contact Details: Tele. +61 8 9286 8300 robtowner@triangleenergy.com.au www.triangleenergy.com.au PO Box 377, Co7esloe, We
Source: Internet Archive copy of triangleenergy.com.au
More decks from Triangle Energy (Global) Limited
Investor Presentation (April 2025)13 slides · Apr 7, 2025
Shareholder Meeting (November 2024)14 slides · Nov 14, 2024
Corporate Update (August 2024)14 slides · Aug 9, 2024
Investor Presentation (March 2024)18 slides · Mar 6, 2024
Investor Presentation (February 2024)17 slides · Feb 13, 2024
Good Oil Conference 202316 slides · Sep 6, 2023