  1. Slide 1: Mitchell Plant Investor Field Trip

    Mitchell Plant Investor Field Trip Moundsville, West Virginia August 16, 2005

  2. Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements, which are subject to risks and uncertainties. These factors include electric load and customer growth; weather conditions, including storms; available sources and

  3. Slide 3: Bill Sigmon

    Bill Sigmon SVP – Fossil & Hydro Generation 3

  4. Slide 4: AEP East Fossil Generation Fleet

    AEP East Fossil Generation Fleet 4

  5. Slide 5: AEP East Coal Fleet Availability & Capacity Factor Statistics

    AEP East Coal Fleet Availability & Capacity Factor Statistics GENERATION PERFORMANCE 2005 YTD 2004 •CAPACITY FACTOR: 69.42% 66.76% •EQUIVALENT AVAILABILITY 81.86% 78.51% FACTOR: •EQUIVALENT FORCED OUTAGE RATE: 7.61% 9.70% 5

  6. Slide 6: Mitchell Plant Statistics

    Mitchell Plant Statistics • Twin 800 MW Units - generating energy capacity of 9,200 GWH annually • In service 1971 • 153 employees • Pulverized coal fired steam generators • Each unit to be equipped with Flue Gas Desulfurization Systems (FGD) & Selective Catalytic Reduction Systems (SCR) • Coal yard

  7. Slide 7: Kammer-Mitchell Plant Safety Recordable Incidents By Year

    Kammer-Mitchell Plant Safety Recordable Incidents By Year Year Recordable Rate Severity Rate 2003 6.41 0.00 2004 6.78 7.91 2005 2.06 17.19 Thru Thru 6/30 6/30 • Recordable Rate = Recordable cases x 200,000/hours worked • Severity Rate = Lost worked days + Restricted activity days x 200,000/hours wor

  8. Slide 8: Today's Tour – Plant Layout

    Today’s Tour – Plant Layout Station 1: Location – Training Center Mitchell Plant Statistics – Bill Sigmon, SVP-Fossil & Hydro Generation FGD/SCR Value Proposition & Project Overview – Mike Rencheck, SVP– Engineering, Technical & Environmental Services Fuel, Emissions & Logistics – Chuck Zebula, SVP-

  9. Slide 9: Mike Rencheck

    Mike Rencheck SVP – Engineering, Technical & Environmental Services 9

  10. Slide 10: AEP's Environmental Compliance Strategy

    AEP’s Environmental Compliance Strategy NOx and SO2 emission reductions are part of AEP’s on-going strategy to comply with the Clean Air Act, Title IV regulations, the Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR). • Much of this investment will be for: – Selective catalytic

  11. Slide 11: Environmental Investment

    Environmental Investment FGD SCR Plant Name MW Capacity Plant Name MW Capacity Gavin 1 & 2 2600 Gavin 1 & 2 2600 Amos 1-3 2900 Conesville 5 & 6 750 Mountaineer 1300 Pirkey 580 Completed Oklaunion 539 Big Sandy 2 800 Stuart 1-4 608 Zimmer 330 Cardinal 1 600 Dolet Hills 262 Muskingum 5 585 Total 5061

  12. Slide 12: Environmental Investment: $4.1 Billion Through 2010

    Environmental Investment: $4.1 Billion Through 2010 Environmental Capital Compliance Allocation Investment* 2010 $36 $124 MM 2009 $259 $581 MM 2008 $450 2007 $1,051 2006 $1,292 2005 $779 2004** $299 $3,462 MM 0 500 1000 1500 $ in Millions NOx Compliance SO2 Compliance Mercury *Environmental investme

  13. Slide 13: The Flue Gas Stream

    AEP The Flue Gas Stream Coal-Fired Steam Generator Pulverized Coal Selective Catalytic Reduction (SCR) System Ammonia Gas Injection Ammonia Production System Catalyst Layers Electrostatic Precipitator Flue Gas Desulfurization (FGD) Absorber Limestone Slurry Spray Stack 13

  14. Slide 14: SCR / FGD Installation Effect on Mitchell

    SCR / FGD Installation Effect on Mitchell • The Mitchell Plant has typically burned low sulfur bituminous coal including compliance coal. • In the past, higher sulfur coals have produced operational inefficiencies; therefore, the steam generator will undergo modifications to improve operations on hi

  15. Slide 15: Mitchell Plant Scope

    Mitchell Plant Scope Modifications Needed FGD Construction SCR Construction SO3 Stack Transmission Mitigation Tower Boiler Transformer Urea to Turbines Ammonia Generator ID SCR Precipitator Fan Air Heater Absorber Coal FD Fan Control System Cooling Silo Tower Fuel Blending Gypsum Slurry Storage Pulv

  16. Slide 16: Materials and Vendors

    Materials and Vendors Material Costs • The primary materials used during construction are steel and alloys, the cost of which is volatile. We closely monitor the cost of such materials and strive to proactively manage our cost exposure. Typical Vendors • FGD – B&W – Alstom – B & V Chyioda • SCR – Ba

  17. Slide 17: Typical FGD/SCR Project Milestone Schedule

    Typical FGD/SCR Project Milestone Schedule § Phased Execution – Lessons Learned: Focus on performance/risk management/cost – Phase 1 Feasibility Study, Phase 2a Conceptual design, Phase 2b Detailed design, bid Phase 3 Construction At 30 – 60 % design complete § Typical Plant and Landfill Schedule fo

  18. Slide 18: Impact of SCR and FGD on Net Generation

    Impact of SCR and FGD on Net Generation • Each 800 MW unit at Mitchell will consume additional MW capacity to operate the SCR and FGD. • The overall generation loss in capacity associated with SCR and FGD for the entire AEP fleet is roughly 600MW. • Typically, an SCR consumes approximately 1% wherea

  19. Slide 19: Chuck Zebula

    Chuck Zebula SVP - Fuel, Emissions & Logistics 19

  20. Slide 20: Low Cost Production Supports Investment

    Low Cost Production Supports Investment Ø Lowers exposure to high Typical Pulverized Coal Plant cost emission allowances Comparison of Variable Production Cost Ø Creates opportunity to burn Pre- and Post- FGD/SCR (future view)* wider variety of lower cost $30 fuels $25 Ø Improves baseload operation

  21. Slide 21: Mitchell Plant Fuel Statistics

    Mitchell Plant Fuel Statistics • Current Coal Deliveries • CAPP coal – about 12,200 Btu/lb and 1.5 lbs SO2/mmBtu • Consumes approximately 3.5 million tons annually • Coal is primarily delivered by CSX rail – in 10,000 ton unit trains – resulting in about 1 train per day • Some coal is delivered to M

  22. Slide 22: Coal Procurement

    Coal Procurement AEP SYSTEM EASTERN SYSTEM Northern Northern Central Appalachia PRB & Other Appalachia Appalachia 24% 18% 37% 32% 39% Central 50% Powder River Appalachia Basin & Other Coal Supply (on average) WESTERN SYSTEM Lignite Ø Purchase 75 MM tons per year 26% Ø Avg. delivered price ~ $28.50/t

  23. Slide 23: Coal Delivery Mix

    Coal Delivery Mix EASTERN SYSTEM Jan-May 2005 Actual AEP SYSTEM Belt (3%) DELIVERY MODE DIVERSITY Truck Jan-May 2005 Actual 12% 34% Barge Belt 18% Direct Rail/Barge* Truck 8% 33% 9% Rail Direct 13% 45% Rail/Barge* WESTERN SYSTEM Jan-May 2005 Actual 25% Rail Direct Belt Barge 20% Direct 80% Rail Dire

  24. Slide 24: AEP's Coal Transportation Assets

    AEP’s Coal Transportation Assets Coal Transportation to AEP Plants* AEP’s substantial coal Jan-May 2005 Actual transportation assets include: Ø 7,065 railcars Ø 2,230 barges 20% Ø 53 towboats Ø 1 active coal handling 80% terminal (20 million tons of annual capacity) AEP-Owned Assets External Carrier

  25. Slide 25: Mark Knoy

    Mark Knoy VP – Boat Operations 25

  26. Slide 26: AEP River Operations: What We Do

    AEP River Operations What We Do 26

  27. Slide 27: We Serve AEP Plants

    We Serve AEP Plants 2004 Coal Loadings and Deliveries (000 tons) Loadings: Cora Cook S. Ohio R. Mid-Ohio R. Upper Ohio R. 3,000 9,200 781 9,900 8,700 Deliveries: Rockport Clifty Tanners Kyger Gavin Kanawha Amos Mountaineer Sporn Kammer Mitchell Cardinal 8800 4,100 2,500 0 8,500 56 88 3,100 2,400 0 v

  28. Slide 28: Typical Coal Tow

    Typical Coal Tow 15 barges and 5,600 hp towboat Up to 31,500 ton coal capacity 28

  29. Slide 29: Average Coal Moves

    Average Coal Moves PRB Coal: 650 miles Eastern Coal: 225 miles 29

  30. Slide 30: Why Barge Coal?

    AEP Why Barge Coal? Ton Miles per Gallon by Mode BQ Cs |) | 4} ThA es ©2002 Truck 59 1 3.5 9 30

  31. Slide 31: Why Barge Coal?

    Why Barge Coal? Emissions per Gallon of Fuel Barge Train Truck 31

  32. Slide 32: Why Barge Coal?

    AEP Why Barge Coal? Equivalent Units 15 Rail Cars 58 Semi Trucks 32

  33. Slide 33: Coal Tops Commodity Mix

    Coal Tops Commodity Mix 2005 Budgeted Tonnage by Commodity Commodity Total Percent Coal 39,293 62% Ag 8,622 14% Steel 8,209 13% Construction 3,323 5% Other 3,579 6% (000) 63,026 100% 33

  34. Slide 34: Barge Types

    Barge Types Coal barge Capacity up to 2,100 tons, depending on river conditions Current cost: $410,000 Covers for weather- sensitive materials Grain, fertilizer, steel, cement Current cost: $450,000 34

  35. Slide 35: Approximate Asset Life

    Approximate Asset Life Coal Barge: 25 years Towboat: 30-40 years 35

  36. Slide 36: Traffic & Freight Patterns

    Traffic & Freight Patterns • Ohio River and tributaries, Mississippi and Illinois • Ohio pattern supports heavy coal traffic 36

  37. Slide 37: Your Towboat Tour

    Your Towboat Tour Two groups alternate between lunch & tour 37

  38. Slide 38: Plant Tour Route

    PLANT TOUR ROUTE Wayne Irons, Plant Manager 38

  39. Slide 39: Today's Tour – Plant Layout

    Today’s Tour – Plant Layout 3 2 1 4 5 6 39

  40. Slide 40: Tour Safety Instructions

    TOUR SAFETY INSTRUCTIONS 40

  41. Slide 41: Appendix

    Appendix 1

  42. Slide 42: Pulverized Coal Unit as Built in 1970s

    Pulverized Coal Unit as Built in 1970s ELECTROSTATIC PRECIPITATORS Coal & #2 Fuel Oil Coal Ash to Disposal 2

  43. Slide 43: Pulverized Coal Unit Today Showing Retrofits & New Feedstock(s)

    Pulverized Coal Unit Today Showing Retrofits & New Feedstock(s) SCR for NOx Additional Process Water Control Ammonia from Urea For NOx Control Magnesium Hydroxide or Other for SO3 Control Lime or Limestone Trona , Lime, Ammonia or Other for SO3 Control FGD for SO2 Control Gypsum/Sludge Disposal 3

  44. Slide 44: Environmental Rules and AEP Investment

    Environmental Rules and AEP Investment 4

  45. Slide 45: Clean Air Interstate Rule

    Clean Air Interstate Rule Ø Rule Finalized March 2005 Ø CAIR designed to address the contribution of regional emissions to downwind PM2.5 & 8-hour Ozone non-attainment Ø CAIR reductions from 2003 emissions: ~73% SO2; & ~61% NOx Ø Reductions occur in phases: Phase I (2009); Phase II (2015) Ø CAIR est

  46. Slide 46: CAIR Applicability to AEP

    CAIR Applicability to AEP ØAEP-East States & Louisiana subject to all three trading programs ØArkansas subject only to the Ozone-Season trading program ØTexas subject to only the Annual NOx & SO2 trading programs ØCAIR does not apply to Oklahoma AEP WILL HAVE TO INSTALL ADDITIONAL SCR AND FGD SYSTEM

  47. Slide 47: Mercury Rule

    Mercury Rule Ø Rule Finalized March 2005 Ø Designed to reduce mercury emissions by ~70% nationwide from electric utilities Ø Reductions occur in phases: Phase I (2010); Phase II (2018) Ø Establishes a Cap & Trade structure to achieve mercury reductions AEP WILL ACHIEVE SOME MERCURY REDUCTIONS AS A C

  48. Slide 48: Environmental Spending by Company

    Environmental Spending by Company Projected Environmental Funding the Environmental Investment Allocation Investments 3% 8% Ø Ohio: 54% ($2.2 billion) Ø Rate stabilization plan annual increases at CSP – 3% and OP – 7% 54% beginning in 2006 through 2008 35% Ø Virginia/West Virginia: 35% ($1.4 billion

  49. Slide 49: Flue Gas Desulfurization (FGD)

    Flue Gas Desulfurization (FGD) 9

  50. Slide 50: Sulfur Dioxide

    Sulfur Dioxide The Clean Air Act Amendments of 1990 and more recently the Clean Air Interstate Rule provide flexibility for cost–effective compliance in reducing sulfur dioxide (SO2) emission. AEP continuously evaluates the alternatives for meeting those requirements, including fuel switching at som

  51. Slide 51: What is SO2?

    What is SO2? Sulfur dioxide • Is a gas that forms when the sulfur in coal is burned or oxidized, • dissolves easily in water and water vapor in the air to form sulfates, and • with nitrogen oxides, is a major precursor of acidic deposition (acid rain). 11

  52. Slide 52: The SO2 Solution

    The SO2 Solution • AEP has initiated a program of flue gas desulfurization system installations to help it meet current and anticipated SO2 emission standards from coal-fired power plants. • AEP believes that installing FGD (scrubber) systems at carefully selected power plants is the best, most cost

  53. Slide 53: Reducing Agent Preparation

    Reducing Agent Preparation Graphic: Alstom Power, Inc. • Limestone, a plentiful supply, low cost raw material is crushed in ball mill pulverizers. • The crushed limestone and water mix to form a slurry. 13

  54. Slide 54: Sulfur Removal (Spray Tower)

    Sulfur Removal (Spray Tower) • Exhaust gas is routed through absorber vessels where it is sprayed with the slurry. • SO2 reacts with the slurry and forms calcium sulfate or gypsum. • The calcium sulfate falls to a tank in the lower part of the vessel. • Blowers inject air to force oxidation of the p

  55. Slide 55: Dewatering

    Dewatering Hydrocyclones wring out much of the water to produce gypsum: the water is re-circulated. 15

  56. Slide 56: FGD Material

    FGD Material • Specific characteristics of FGD material vary from one installation to another. • The FGD material from a wet scrubber system is gypsum that can be made for sale and used in drywall. • AEP has made arrangements with a wallboard manufacturer to accept the gypsum produced at Mitchell as

  57. Slide 57: The Plume

    The Plume • Scrubbers increase the amount of water vapor emitted through the stack. • As a result, the physical characteristics of the plume change so that it is – more visible, – more saturated and – less buoyant. 17

  58. Slide 58: Selective Catalytic Reduction (SCR)

    Selective Catalytic Reduction (SCR) 18

  59. Slide 59: How an SCR works

    How an SCR works An SCR uses ammonia gasto create a chemical reaction that converts nitrogen oxide into nitrogen and water. Here’s how: AEP uses urea, a harmless compound often used as fertilizer, delivered to the plant site where itis mixed with water. The urea mixture is then cracked by the use of

  60. Slide 60: Nitrogen Oxide

    Nitrogen Oxide U.S. EPA regulations have required many electric utilities in the United States, including AEP, to reduce nitrogen oxide (NOx) emissions. AEP installed reduction systems prior to its compliance date and thus earned early reduction credits. 20

  61. Slide 61: What is NOx?

    What is NOx? • During combustion, nitrogen in coal combines at high temperatures with the nitrogen and oxygen that comprise air to form nitrogen oxides. • When NOx combines with Volatile Organic Compounds in the presence of summer temperatures and sunlight, ozone is produced. • Ground level ozone at

  62. Slide 62: The NOx Solution

    The NOx Solution • In the 1990s, AEP invested more than $160 million to install low-NOx burners on some units. • Low-NOx burners control the way coal is burned to reduce formation of NOx. • Low-NOx burners on the AEP system reduced NOx emissions by approximately 30% per year below uncontrolled level

  63. Slide 63: What an SCR Does

    What an SCR Does A selective catalytic reduction system (SCR) • Reduces nitrogen oxide emissions by up to 90% • Uses ammonia as the reducing agent (re-agent) to assist the changing of chemical compounds. • Employs a catalyst to convert NOx to nitrogen and water that are released to the atmosphere. •

  64. Slide 64: How an SCR Works

    How an SCR Works SCR System Flue Gas Ammonia Gas from Boiler Injection Flue Gee minus NOx 24

  65. Slide 65: On Site Ammonia Production

    On Site Ammonia Production • AEP helped develop the process for converting urea to ammonia. • Anhydrous ammonia is neither transported nor stored. • Uses urea, a stable, white granular powder under atmospheric conditions, typically used as fertilizer and not classified as toxic. 25

  66. Slide 66: How an SCR Works

    How an SCR Works • Steam is used to drive the ammonia gas from the urea mixture. • The ammonia gas is piped into the flue gas ahead of the SCR. 26

  67. Slide 67: In the Reactor Vessel

    In the Reactor Vessel • The ammonia reacts with the flue gas as it passes over the catalyst, forming nitrogen gas and water vapor. • The harmless nitrogen and water vapor are released into the atmosphere. 27

  68. Slide 68: Mercury

    Mercury In March 2004, the U.S. EPA issued rules requiring coal- fired power plants to reduce mercury emissions. EPA’s rule caps emissions at 38 tons in 2010 and 15 tons in 2018 for overall reduction of 70%. EPA also established an emission-trading program similar to that used for SO2. The U.S. is t

  69. Slide 69: What is Mercury?

    What is Mercury? • Mercury emissions originate 1999 Global Mercury Emissions from numerous natural and man-made sources. • Emissions generally remain U.S. Power Plant in the atmosphere for a Emissions - 1% substantial period of time. U.S. All Other Sources - 2% • More than 60% of mercury Emissions F

  70. Slide 70: The Mercury Solution

    The Mercury Solution There are three forms of mercury – elemental, oxidized and particulate mercury. • FGD systems take advantage of the high solubility of the oxidized portion of mercury and readily capture oxidized mercury. • Elemental mercury passes through an FGD system uncaptured. • The SCR cat

  71. Slide 71: AEP's Experience with Mercury Reduction

    AEP’s Experience with Mercury Reduction AEP anticipates achieving most of its required phase-one mercury reductions through the co-benefits of installing FGD and SCR systems for SO2 and NOx control. Extensive tests of the effectiveness of these combined technologies at Gavin Plant found mercury emis

  72. Slide 72: Plant Tour Graphics

    Plant Tour Graphics 32

  73. Slide 73: Mitchell Plant Scope

    Mitchell Plant Scope Station 1 Modifications Needed FGD Construction SCR Construction SO3 Stack Transmission Mitigation Tower Boiler Transformer Urea to Turbines Ammonia Generator ID SCR Precipitator Fan Air Heater Absorber Coal FD Fan Control System Cooling Silo Tower Fuel Blending Gypsum Slurry St

  74. Slide 74: Station 1 plant view

    UNIT 2 PRECIPITATOR UNIT 1 PRECIPITATOR 138 kV LINES, SUBSTATION FGD TURBINE BUILDING COOLING TOWERS Station 1 34

  75. Slide 75: New stack, SCR, FGD absorber

    NEW STACK SCR UNIT 2 ESP FGD ABSORBER ID FANS Station 1 CONSTRUCTION OFFICE 35

  76. Slide 76: Plant Tour Graphics Station 2: The SCR

    Plant Tour Graphics Station 2: The SCR 36

  77. Slide 77: Mitchell Plant Scope

    Mitchell Plant Scope Station 2 Modifications Needed FGD Construction SCR Construction Stack Transmission SO3 Tower Boiler Mitigation Transformer Urea to Turbines Ammonia Generator ID SCR Precipitator Fan Air Heater Absorber Coal FD Fan Control System Cooling Silo Tower Fuel Blending Gypsum Slurry St

  78. Slide 78: Station 2 plant view

    NEW STACK EXISTING STACK COOLING TOWERS SCR UNIT 2 ESP UNIT 1 ESP Station 2 38

  79. Slide 79: Station 2

    Station 2 39

  80. Slide 80: Plant Tour Graphics Station 3: Precipitator ID Fan/Stack

    Plant Tour Graphics Station 3: Precipitator ID Fan/Stack 40

  81. Slide 81: Mitchell Plant Scope

    Mitchell Plant Scope Station 3 Modifications Needed FGD Construction SCR Construction SO3 Mitigation Stack Transmission Tower Boiler Transformer Urea to Turbines Ammonia Generator ID SCR Precipitator Fan Air Heater Absorber Coal FD Fan Control System Cooling Silo Tower Fuel Blending Gypsum Slurry St

  82. Slide 82: Station 3 new stack and precipitator

    NEW STACK UNIT 2 PRECIPITATOR ABSORBER INLET DUCT UNIT 2 INLET DUCT UNIT 1 INLET DUCT ID FANS Station 3 42

  83. Slide 83: Station 3 urea hydrolyzers and absorber building

    UREA HYDROLYZERS ABSORBER BUILDING UNIT 2 UREA BOILER STORAGE BUILDING TANK UREA TRUCK UNLOADING BUILDING Station 3 43

  84. Slide 84: Plant Tour Graphics Station 4: FGD

    Plant Tour Graphics Station 4: FGD 44

  85. Slide 85: Mitchell Plant Scope

    Mitchell Plant Scope Station 4 Modifications Needed FGD Construction SCR Construction SO3 Stack Transmission Mitigation Tower Boiler Transformer Urea to Turbines Ammonia Generator ID SCR Precipitator Fan Air Heater Absorber Coal FD Fan Control System Cooling Silo Tower Fuel Blending Gypsum Slurry St

  86. Slide 86: Station 4 absorbers and coal conveyor

    ABSORBERS EXISTING COAL CONVEYOR NEW 138 kV EXISTING FUEL SUBSTATION OIL TANKS Station 4 46

  87. Slide 87: Station 4 FGD building and slurry tanks

    NEW STACK UNIT 2 BOILER BUILDING FGD BUILDING UNIT 2 SLURRY TANKS COOLING TOWER LIMESTONE SLURRY TANKS Station 4 47

  88. Slide 88: Station 4 FGD and gypsum buildings

    FGD BUILDING GYPSUM BUILDING SLURRY TANKS LIMESTONE SLURRY PREP BUILDING Station 4 48

  89. Slide 89: Station 4 limestone silos and gypsum dewatering

    LIMESTONE SILOS GYPSUM DEWATERING LIMESTONE BALL MILLS SLURRY TANK Station 4 49

  90. Slide 90: Plant Tour Graphics: Station 5

    Plant Tour Graphics: E Crane 50

  91. Slide 91: Station 5

    Aci ot Aner rie Per lal 51

American Electric Power Company — Corporate Update (August 2005) on 6ix