Hastings Technology Metals Limited · ASX:HAS

Hastings Technology Metals — Investor Presentation (June 2017)

41 slides from Hastings Technology Metals's investor presentation, June 2017

  1. Slide 1: Future Producer of Neodymium & Praseodymium to the Permanent Magnet Industry

    Future Producer of Neodymium & Praseodymium HASTINGS to the Permanent Magnet Industry Technology Metals Limited ASX Stock Code: HAS Investor Presentation June 2017 1

  2. Slide 2: Disclaimer

    HASTINGS Technology Metals Ltd All currency amounts are in A$ unless stated otherwise. Disclaimer This presentation has been prepared by Hastings Technology Metals Limited (“Company”). It does not purport to contain all the information that a prospective investor may require in connection with any p

  3. Slide 3: Key Facts

    Key Facts  Hastings’ Yangibana Project in Western Australia - to produce Mixed Rare Earth Carbonate (MREC) rich in Neodymium (Nd) and Praseodymium (Pr)  Nd and Pr are critical elements in manufacture or Permanent Magnets - used in advanced and green technologies such as wind turbines, electric veh

  4. Slide 4: Key Facts

    Key Facts • Lead Agency Project Status granted by W.A. state government to assist in permit process & final approvals  Experienced Management Team with rare earths mining and production experience and capability  Commercial off-take discussions underway with European and Chinese buyers  Mine Cons

  5. Slide 5: Rare Earths

    Rare Earths Key rare earths and applications Permanent Magnets, Wind Turbines, E-Vs, Robotics, Speakers, Hard-Disks, Lasers HE-Vs, Electron Microscopes, Batteries, IR-absorbing Optical Permanent Magnets, Aircraft Glasses, Lenses, Chemical Engines, Ceramic Dyes, Welder’s catalyst Goggles, Magnetoc

  6. Slide 6: Nd-Pr based Permanent Magnets

    Nd-Pr based Permanent Magnets Stronger, lighter & smaller NdFeB (Neodymium, Iron, Boron Magnet) - strongest permanent magnet commercially available: Nd-Pr approx. 1/3 by material weight ~10x more powerful, and 3x lighter than traditional ferrite magnet  Superior performance, compact, lightweight an

  7. Slide 7: Rare Earth Utilization Facts

    Rare Earth Utilization Facts Demand in consumption numbers • Each 2MW wind turbine contains 340- 420kg REE in NdFeB permanent magnet • GWEC* est. 330 GW to be installed from 2017 to 2021 ~ 66,000 tonnes** • Each HEV contains about 2.7kg REE • Global HEV and EVs have increased 13 Neodymium & fold fro

  8. Slide 8: New Advanced Technologies

    New Advanced Technologies Additional demand for rare earths from new innovations and technologies PVC stabilizers Magnetocaloric Refrigeration Industrial Robots Protect PVC from thermal 30% to 50% more energy efficient, Chinese robotic usage to degradation and exposure zero CFC usage. (Mostly Nd-Pr)

  9. Slide 9: Global Rare Earth Supply 2016

    % Total Global Rare Earth Supply Global Rare Earth Supply 2016 Supply diversification increasingly strategic 11% 3% 1% 3,000 MT 1% 1% 105,000 MT 1,700 MT 1,100 MT 14,000 MT 83% China Australia Russia India Brazil Thailand Vietnam Malaysia 2016 Global Supply 126,000 MT Excluding Illegal Supply HASTIN

  10. Slide 10: Growth in Demand for Nd-Pr

    Growth in Demand for Nd-Pr Providing critical elements for Permanent Magnets Expect Strong Growth in Nd-Pr Demand • 2017 Demand Nd-Pr ~ 39,000 tonnes – Argus Metals estimates 2010 – 2020 CAGR – 9% • Permanent Magnets - increased demand from wind turbines, electric vehicles (EVs), digital devices and

  11. Slide 11: View from Beijing

    View from Beijing China signs up to Paris Agreement Policy initiatives in support of Paris targets • Non-fossil energy sources to increase to 20 percent of total energy requirement by 2030 [3] • Requires deployment of 800 - 1,000 gigawatts in non- fossil capacity, close to current US total electrici

  12. Slide 12: View of Procurement Managers

    View of Procurement Managers 15 Apr 2017: Introduction of ISO 20400 New Sustainable Procurement Standard • New ISO 20400 compliance standard for procurement • Compliance necessary across three key areas: • Environmental Impact • Social Sustainability • Economic Sustainability • Pressure on manufactu

  13. Slide 13: Case for continuing Nd-Pr Price Increase

    Case for continuing Nd-Pr Price Increase Praseodymium Neodymium: Praseodymium neodymium market prices went up significantly as some domestic enterprises suspended production. Recently, Potentially supply Prices praseodymium Nd – Proxide of neodymium increase was offeredin at RMB shortage of Nd–Pr 20

  14. Slide 14: Yangibana

    Yangibana Mining and Production of Neodymium & Praseodymium 14

  15. Slide 15: Western Australia Base

    Western Australia Base Advantages of geographic location • Australia Sovereign Risk Rating AAA/Aaa (S&P/Moody’s) – lower cost of capital ❏ Broome  Brockman • High rank for corporate governance and Rule of Law. (WJP Rule of Law Index 2016). ❏ Port Hedland • Western Australia - long history of succes

  16. Slide 16: Site Location

    Site Location Central Western Australia Yangibana is situated 280 km north-east from the port town of Edmund Carnarvon Airstrips available at: Mangaroon • Carnarvon • Gascoyne Junction • Gifford Creek Gifford Creek • Edmund Road from Carnarvon follows Gascoyne River to Gascoyne Junction, then along

  17. Slide 17: Favourable Terrain

    Favourable Terrain Above ground ore outcrops – level terrain, easy to mine Open Pit Mining on Flat Terrain Key Rare Earths: Neodymium (Nd) Praseodymium (Pr) Dysprosium (Dy) Terbium (Tb) Nd & Pr account for ~ 82% of in-ground economic value. HASTINGS 17 Technology Metals Limited

  18. Slide 18: Granted Leases

    Granted Leases Mining, General Purpose & Exploration Leases • Total Yangibana area ~ 650 km2 • 21 years Mining Leases Granted ~ 50 km2 • No Native Title Claims on mineralised ground • Contain ~ 90% of JORC Resource • Various Miscellaneous and General Purpose Leases granted • Supporting infrastructur

  19. Slide 19: Drill Programme 2017

    Drill Programme 2017 Increasing JORC Resources & Mine Life • Airborne survey in 2016 identified 22 priority mineralised targets for future exploration after 2017 (18 Oct 2016) • Fraser’s Southwest Deposit drill results – high grade to 2.00% TREO (25 Oct 2016) • Auer North Deposit – high grade of 2.0

  20. Slide 20: JORC Resource

    JORC Resource Rich in Neodymium and Praseodymium Total Yangibana JORC Resources • Jan 2017 updated JORC estimate sets out Tonnes Nd2O3+Pr2O3 TREO Nd2O3 Pr2O3 Category Measured Resource in 100% ground % % ppm Ppm Measured 2,155,000 0.42 1.01 3,410 770 Indicated 5,446,000 0.41 1.30 3,260 870 • In-grou

  21. Slide 21: Yangibana Advantage

    Yangibana Advantage Comparison of TREO in Beneficiated Concentrates High Nd & Pr content means high Neodymium Praseodymium Lanthanum Cerium Samarium Europium Gadolinium Terbium economic basket value 100% 90% • Pilot confirmed ore upgrade from ~ 1.2% in-ground to 23% TREO in Beneficiated 80% Concentr

  22. Slide 22: Economic Value from Nd - Pr

    Economic Value from Nd - Pr Permanent Magnets to drive Nd – Pr prices higher Rare Earth Elements In Yangibana Basket Value Price Escalation in Basket Price assumption 1.6 1.52 1.5 1.52 1.4 1.42 1.3 1.30 1.2 1.19 1.1 1.07 1.06 1 1.03 2017 2019 2020 2021 2022 2023 2024 2025 2026 Nd-Pr = 82% of In Grou

  23. Slide 23: The Yangibana Process and Product

    The Yangibana Process and Product The Steps from Ore to Mixed Rare Earth Carbonate (MREC) Successful Beneficiation and Hydrometallurgy pilot plant test-work proves simple and effective production process flow sheet 1m t.p.a. ore mined ~30-40k t.p.a. Beneficiated ~15,000 t.p.a. MREC ~8.500 t.p.a. Con

  24. Slide 24: Yangibana Beneficiation Flowsheet

    Yangibana Beneficiation Flowsheet Successful completion of pilot plant test work Continuous Pilot Plant Test - Successfully validated simple and effective flowsheet Confirmed 70% TREO recovery rates and a concentrate upgrade to 23% TREO ~ 18 times from ore.  Achieved lower consumption of reagents F

  25. Slide 25: Yangibana Hydrometallurgy Flowsheet

    Yangibana Hydrometallurgy Flowsheet Successful completion of pilot plant test work Final flotation concentrate from beneficiation pilot Hydrometallurgy Pilot plant undertaken for three phases: • Acid bake • Water leaching & impurity removal • Carbonate product precipitation All three phases exceeded

  26. Slide 26: Lead Agency Project Status

    Lead Agency Project Status Granted by Department of Mines and Petroleum (DMP) Benefits Outcomes • Coordination of the approvals • Government support for the Project process across multiple prior to receipt of Approvals government departments = • Approvals received within assigned timelines: • Hastin

  27. Slide 27: Milestones to Achieve Production

    Milestones to Achieve Production • DFS Completion • EPC Management • Financing 27

  28. Slide 28: Preparatory work prior to Plant Construction

    Preparatory work prior to Plant Construction Pre-project implementation work 1. Project Implementation Schedule and Strategy • How and When – cost effectiveness • Contracting strategy (parcelling) 2. Forming the Project Management Team (PMT) • Skilled and experienced personnel 3. Secondary Works App

  29. Slide 29: Timetable to Production

    Timetable to Production Getting from Definitive Feasibility to production by 2H 2019 • Project Director (Mr KH Leong) – responsible for engineering design and equipment specification work. • Leong has extensive experience in engineering design, construction and project management. Formerly with Lyna

  30. Slide 30: Capital Expense

    Capital Expense Ensuring an efficient and effective utilisation of capital and reducing project risk CAPEX targets • Substantial progress in reducing CAPEX since PFS AUD m (from $420m down to $300m) Engineering 38.4 • Optimised and re-engineered process plant Procurement – Process & Mining 62.8 util

  31. Slide 31: Annual Operating Expense

    Annual Operating Expense Estimated Annual Operational Costs Assumes 2020 production year and 8,500 tonnes TREO in MREC • Substantial OPEX cost savings due to: • Optimised consumption of reagents AUD m identified in pilot plant test-work Mining Costs – based on 1 m t.p.a. mined 38.8 • Recycling and r

  32. Slide 32: Profitability Forecasts

    Profitability Forecasts + AUD100m NPV for every +10% Nd & Pr price increase 2019 2020 2021 2022 2023 2024 Mining Rate tonnes 375,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 TREO tonnes 4,268 12,951 13,601 8,610 7,720 8,329 Revenue A$ m 128.8 364.0 301.0 339.9 357.6 377.5 Operating Costs A$

  33. Slide 33: The Hastings Team

    The Hastings Team Directors, Management & Technical Team A diverse group of experienced professionals have been brought together to achieve the goal of production at Yangibana in 2019. The multi-disciplinary team includes highly specialised experts in rare earth minerals processing and metallurgy, p

  34. Slide 34: Board of Directors

    Board of Directors Experienced Directors and Management Team Charles Lew Tony Ho Jean Claude Steinmetz Executive Chairman Non Executive Director & Non Executive Director Private investor and entrepreneur Chair of Audit Committee Previously Chief Operating Officer Corporate Finance Director – HG Dire

  35. Slide 35: Management Team

    Management Team Experienced Directors and Management Team Charles Tan Andy Border Guy Robertson Kok Hoong Leong Aris Stamoulis Chief Operating Officer General Manager Chief Financial Officer & Project Director Director • 20+ years in Commercial, Exploration Company Secretary • 38 years’ engineering

  36. Slide 36: Specialised Technical Team

    Specialised Technical Team Dr Kwan Wong Narelle Marriott KYSPYmet Mineral Processing Consultants Principal Engineer – Beneficiation Flotation Specialist • 14+ years experience in the minerals • 50+ years practicing metallurgist processing and mining industry • Possesses extensive flotation treatment

  37. Slide 37: Current Company Status

    Current Company Status To-date capital raises and shareholder statistics 37

  38. Slide 38: Hastings Equity Statistics

    Hastings Equity Statistics Steady growth in market cap since Jan 2014 HAS:ASX Price/Volume Chart • YTD Performance +22%; Market Cap ~ AUD50m Price Volume 0.11 10,000,000 • 2017 increase in Total Shareholders by 29% 9,000,000 0.1 8,000,000 • Top 100 shareholders control 94%; top 10 0.09 7,000,000 con

  39. Slide 39: Summary – De-risking Production Process

    Summary – De-risking Production Process Contributing to lower operational risk Yangibana Ore Body – Exceptionally High Nd – Pr content • JORC resource currently at 13.4m tonnes; ongoing drilling in 2017 extends Mine life to +10 years • High % in-ground Nd – Pr ; average of 33% weighted across JORC r

  40. Slide 40: Thank you. Q & A

    Thank you. Q&A 40

  41. Slide 41: Additional Sources

    Additional Sources [1] International Energy Agency: Electric vehicles have another record year, reaching 2 million cars in 2016 – 7 Jun 2017. [2] Australian Financial Review: China charging ahead in electric car battery market. – 8 Mar 2017. [3] The Road from Paris: China’s progress toward its clima

Hastings Technology Metals — Investor Presentation (June 2017) on 6ix