Havilah Resources Limited · ASX:HAV

Havilah Resources — South Australian Resources & Energy Investment Conference 2015

25 slides from Havilah Resources's conference presentation, Apr 14, 2015

  1. Slide 1: Portia: SA's Newest Gold Mine – SAREIC Presentation

    Slide 1: Portia: SA's Newest Gold Mine – SAREIC Presentation

    Havilah Resources Limited plans to sequentially develop its portfolio of gold, copper, iron, cobalt, tin and other mineral resources in South Australia. Our vision is to become a new mining force, delivering value to our shareholders, partners and the community. 156 million Ordinary Shares -- 36 mil

  2. Slide 2: A New Mining Force in South Australia

    Slide 2: A New Mining Force in South Australia

    A New Mining Force in South Australia Portia : SA’s Newest Gold Mine South Australian Resources & Energy Investment Conference 14 April 2015 Dr Chris Giles Managing Director Havilah Resources Limited

  3. Slide 3: Portia – Havilah's First Mine

    Slide 3: Portia – Havilah's First Mine

    Portia – Havilah’s First Mine  Simple gravity recovery of free gold.  Experienced Broken Hill contractor responsible for all mining  Innovative funding arrangement – profit sharing with contractor  Prospect of >$40 million gross cash flow generated in 2016.1 1 Refer to ASX release 18/02/15

  4. Slide 4: The First Bite

    Slide 4: The First Bite

    The First Bite Start of Portia open pit 30 March 2015

  5. Slide 5: The Golden Prize

    Slide 5: The Golden Prize

    The Golden Prize 5mm Portia Base of Tertiary Gold

  6. Slide 6: 1.5 Hours From Broken Hill

    Slide 6: 1.5 Hours From Broken Hill

    1.5 Hours From Broken Hill Havilah Resources 400000 E 500000 E + Havilah mineral tenement boundary Portia Pr evsinita 67 Koz Aw 4m @ 17.59 Au North Portia J &2im @ 0.48% Cu® 100 Kt Cu, 235 Koz Au Croziers 12.5m @ 0.46% Cu” Ape Pooerougn | 6500000 N Kalkaroo Central Processing Facility 2Moz Au, 622 K

  7. Slide 7: Mine financing

    Slide 7: Mine financing

    Mine financing Traded mining and financing risk for a revenue share  Innovative and simple mining deal with CMC of Broken Hill.  CMC are experienced and well respected operators at Snapper and Broken Hill.  Simple 50:50 revenue split, with CMC responsibility for mining and Havilah responsibility

  8. Slide 8: Current Status

    Slide 8: Current Status

    Current Status  Site preparation works are largely complete in record time of approximately 6 weeks from bringing first equipment on site.  Camp and workshop are on site and operational.  40 personnel on site, being bused in and out to Broken Hill on a 10 day on 5 day off roster.  250t excavator

  9. Slide 9: Portia Mine Site Layout

    Slide 9: Portia Mine Site Layout

    Portia Mine Site Layout Four years of dedicated effort to obtain mining approvals. Involved finding solutions for : • clay overburden & dewatering • excess water from open pit • exclusion zones

  10. Slide 10: Gold layer sitting on bedrock

    Slide 10: Gold layer sitting on bedrock

    Gold layer sitting on bedrock

  11. Slide 11: Portia Open Pit And Resource Model

    Slide 11: Portia Open Pit And Resource Model

    Portia Open Pit And Resource Model Open pit is optimised to capture the maximum ounces of gold (80%) in the base of Tertiary resource. Can access any additional gold below pit floor

  12. Slide 12: Portia Open Pit Mine Plan

    Slide 12: Portia Open Pit Mine Plan

    Portia Open Pit Mine Plan Patchy high grade gold Initial mining objective mineralisation in bedrock 67,000 oz JORC resource 26 metres of 15.4 g/t Au at base of Tertiary clay1 Weathered bedrock 13 metres of 33.5 g/t2 Bedrock Refer to ASX releases on 126/06/09 and 230/11/06

  13. Slide 13: Simple Gravity Recovery Plant

    Slide 13: Simple Gravity Recovery Plant

    Simple Gravity Recovery Plant Twin 50 tonne per hour In- line Pressure Jigs with Spinners for heavy mineral and gold separation. 120 tonne per hour Trommel for washing ore.

  14. Slide 14: Portia Key Economic Metrics

    Slide 14: Portia Key Economic Metrics

    Portia Key Economic Metrics 1 Cash Flow Analysis Millions Total gross cash flow generated $80.5 Royalties payable $(2.4) Cash flow generated after royalty expenses $78.1 Havilah 50% share of cash flow generated $39.1 Based on: JORC resource of 720,000 tonnes @ 2.9g/t of gravity recoverable gold. Wit

  15. Slide 15: Clues to formation

    Slide 15: Clues to formation

    Clues to formation Crystalline gold – has not been transported

  16. Slide 16: Gold has grown in-situ

    Slide 16: Gold has grown in-situ

    Gold has grown in-situ Gold has grown around and encloses ironstone fragments

  17. Slide 17: Gold source – North Portia ?

    Slide 17: Gold source – North Portia ?

    Gold source – North Portia ? Gold in solution has migrated downslope from N Portia and been chemically trapped in highly graphitic shales at Portia

  18. Slide 18: Kalkaroo – Havilah's Second Planned Mine

    Slide 18: Kalkaroo – Havilah's Second Planned Mine

    Kalkaroo – Havilah’s Second Planned Mine Large long life resource of 622K tonne copper and 2M oz gold 1 Gold cap 18.7Mt @ 0.74g/t Au Native copper Chalcopyrite sulphides Cu-Au Deposit 124.5Mt @ 0.50%Cu 0.39g/t Au 1Refer to ASX release 2/03/15 and resource table at end of presentation

  19. Slide 19: Kalkaroo Processing Facility will Unlock Value

    Slide 19: Kalkaroo Processing Facility will Unlock Value

    Kalkaroo Processing Facility will Unlock Value  Multi-purpose processing plant able to process ore from multiple projects. Portia + North Portia  Improves development prospects and 101,000 t Cu unlocks value in several nearby Cu-Au 235,000 oz Au Kalkaroo projects. 622,000 t Cu 2m ounces Au Kalkaro

  20. Slide 20: In Summary

    Slide 20: In Summary

    In Summary  Prospect of >$40 million gross cash flow generated in 2016 1 …… Portia gold mine funded and underway  Cash flow growth from new mines in the pipeline …… Kalkaroo copper-gold project with > 14 year mine life is next 2  Exposure to exploration success and new discoveries …… Proven track

  21. Slide 21: Ushering in a new dawning

    Slide 21: Ushering in a new dawning

    Ushering in a new dawning THANKYOU

  22. Slide 22: Cautionary Statement

    Slide 22: Cautionary Statement

    Cautionary Statement The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general and summary nature only. Neither Havilah Resources Limited (Havilah) nor any member of the Havilah Group of companies, gives no warran

  23. Slide 23: Additional Supporting Slides

    Slide 23: Additional Supporting Slides

    Additional Supporting Slides

  24. Slide 24: Copper-Gold Resource Metal Inventory

    Slide 24: Copper-Gold Resource Metal Inventory

    Copper-Gold Resource Metal Inventory Copper: 915,500 tonnes (Kalkaroo + Mutooroo + North Portia) Gold: 2,400,000 ozs (Kalkaroo + Mutooroo + Portia + North Portia) Cobalt: 17.5 M Kg (Mutooroo) Molybdenum : 8.45 M Kg (Kalkaroo + North Portia) Copper Gold Molyb- Cobalt Contained Contained Contained Con

  25. Slide 25: Iron Ore Resource Inventory

    Slide 25: Iron Ore Resource Inventory

    Iron Ore Resource Inventory Maldorky : 147,000,000 tonnes of 30.1% Fe Grants : 304,000,000 tonnes of 24% Fe Total : 159,000,000 tonnes of premium grade iron ore product Project* Resource Category Tonnes (Mt) Iron Iron Est Yield (%) tonnes Maldorky1 Indicated 147,000,000 30.1% 40% 59,000,000 Grants2

Source: Internet Archive copy of havilah-resources.com.au

More decks from Havilah Resources Limited

All 77 Havilah Resources decks