Slide 1: Exploration Update - GES AGM Nov 2025
For personal use only ASX: GES Exploration Update GES AGM Nov 24 2025 James Patterson Director, Exploration
Slide 2: Genesis Resources 2025 Exploration Highlights
Genesis Resources 2025 Exploration Highlights • Second Drilling Campaigns completed at both Arltunga and Alice Springs Tenements • Seven hole RC Program (556m) at Arltunga returned results including: • 3m @ 1.75 g/t Au from 22m in hole ARRC010 & • 1m @ 2.25 g/t Au & 0.12 % Cu from 12m in ARRC016 • S
Slide 3: Genesis Resources 2025 Project Locations
Genesis Resources 2025 Project Locations For personal use only
Slide 4: Arltunga Tenement RC Drilling Results Nov 2025
Arltunga Tenement 7 RC Holes for 766m drilled on 3 prospects: Wheal Fortune, Star Creek and Round Hill. Targets were mainly old workings and an IP Anomaly plus follow up holes at For personal use only Round Hill from the significant intercepts from 2023 (6m @ 3.03 g/t Au & 2m @ 7.42 g/t Au & 0.51 %
Slide 5: Arltunga Prospects and Hole Locations 2025
Arltunga. Prospects and Hole Locations 2025 Quartz- Feldspar Schist N For personal use only Quartz- Biotite Gneiss 3m @ 1.75 g/t Au fr 22m 1m @ 2.25 g/t Au, 0.12 % Cu fr 12m
Slide 6: Arltunga Wheal Fortune Section
Shaft ARRC010: 3m @ 1.75 g/t Au fr 22m For personal use only Quartz-Feldspar Schist Meta- ARRC010 ARRC011 Gabbro Arltunga Wheal Fortune Section Au in Drill Holes with Interpreted Geology. Looking NNE
Slide 7: Alice Springs Tenement
Alice Springs Tenement Seven Hole RC Program (766m) Four holes were drilled at Diana 8 Prospects following up on promising results from 2023. Three Holes were drilled into magnetic high targets. Results are pending. For personal use only
Slide 8: Genesis Resources 2025 Photos
Genesis Resources 2025 Photos RC Drilling on Alice Year-round noise monitoring near Plavica Springs Tenement For personal use only Traditional Owners and CLC Rig visit, Arltunga Year-round water sampling at Plavica
Slide 9: Genesis Resources. Conclusions and Further Work Required
Genesis Resources. Conclusions and Further Work Required. ❖ The completion and reporting of the ongoing environmental studies is the last required submission for the Application of Mining Approval at Plavica. The town where the local team is based, Probistip, has a new mayor who is pro-mining. For p
Slide 10: APPENDIX 1: JORC Table 1
APPENDIX 1: JORC TABLE 1. Section 1 Sampling Techniques and Data Part Criteria Comment 1-1 Sampling Techniques • RC Holes were generally drilled perpendicular to the targets. All holes were drilled at a dip of 60 or 65 degrees. • The drill hole locations were picked up by a hand-held GPS. • RC Sampl
Slide 11: JORC Table 1 (continued)
Part Criteria Comment 1-6 Verification of Sampling • No twinned holes. No core drilling undertaken due to lack of and Assaying water. • Data is imported into mining software. There is no adjustment of assay data. 1-7 Location of Data Points • Co-ordinates and RL’s taken with hand-held GPS • Grid sys
Slide 12: JORC Table 1 (continued)
Part Criteria Comment extension of the known mineralisation to the north and east of the historic workings. • Torcon Pty Ltd Carried out work on several tenements that covered a large portion of the existing GES tenement area. 118 stream sediment samples were collected with 91 soils samples taken to