Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (March 2016)

23 slides from Pure Gold Mining's investor presentation, March 2016

  1. Slide 1: March 2016

    March 2016 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information & statements which may not be based on historical fact, including without limitation, statements regarding the Company’s expectations in respect o

  3. Slide 3: Pure Opportunity: A Fresh Look at a Past Producer

    Pure Opportunity A FRESH LOOK AT A PAST PRODUCER We are operating in one of the most prolific gold districts in North America: Red Lake, Ontario. Our Madsen Project is a past producer with permitted mine infrastructure & host to one of the highest grade undeveloped gold resources globally. Infrastru

  4. Slide 4: Pure Talent

    Pure Talent DIRECT RED LAKE EXPERIENCE SENIOR LEADERSHIP RED LAKE & TECHNICAL EXPERTISE Graeme Currie, Chairman Mark O’Dea, Director Former Director, Investment Banking, of CanaccordGenuity Executive Chairman of True Gold Mining & Chairman of Pilot Gold; Former President & CEO of Fronteer Gold; Plac

  5. Slide 5: Red Lake: Highest Grade Gold Belt in Canada

    Red Lake HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date • Established, mining-friendly jurisdiction with 85 year history • District continues to deliver new discoveries through new geologic understanding:  HGZ: Red Lake Mine (Goldcorp)  Bruce Channel: Co

  6. Slide 6: Project Overview

    Madsen Project Overview FOCUSED ON POTENTIAL FOR NEW GOLD DISCOVERIES 3rd largest 2.5 million oz HISTORIC PRODUCTION 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE* • 45 km2 contiguous, patented ground • Second largest historic producer in Red Lake • 36 years of continuous historical produc

  7. Slide 7: Project Overview: Preliminary Economic Study Underway

    Madsen Project Overview PRELIMINARY ECONOMIC STUDY UNDERWAY • Existing mill & mine infrastructure in place  Permitted 500 tonne per day mill  Permitted tailings facility PEA STUDY  1,275 metre deep shaft  27 levels of workings UNDERWAY 6

  8. Slide 8: District Geology

    Madsen District DISTRICT GEOLOGY • Similar to other major deposits in the district  A new interpretation of the role of folded ultramafic contacts & structural controls have resulted in multiple recent discoveries in the district 7

  9. Slide 9: Exploration: Multiple Highly Prospective Targets

    Madsen Exploration MULTIPLE HIGHLY PROSPECTIVE TARGETS • Ultramafic contact over 10 km distance with potential for high-grade targets • 10 kms of unconformity with +2.5mozs of historic production 8

  10. Slide 10: Target Setting

    Madsen Target Setting PRIORITIZING & ADVANCING NUMEROUS GOLD ZONES • High-grade gold in multiple target settings 9 * The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report for the Madsen Gold Project Red Lake, Ontario,

  11. Slide 11: Mine Geology: New Structural Interpretation

    Madsen Mine Geology NEW STRUCTURAL INTERPRETATION • New drilling confirms mine geology is folded • Repetition of key stratigraphic market units confirms Austin & McVeigh altered horizons are the same zone (A-B-C-D-C-B-A pattern) • Orientation & continuity of McVeigh Tuff not previously recognized &

  12. Slide 12: Phase I – 16,000 Metre Drill Program

    Madsen Drill Program PHASE I – 16,000 METRE DRILL PROGRAM McVeigh • 16.0 g/t Au over 7.0 m in PG16-058(1) Drill Program Focused on McVeigh Horizon • Limited near-surface production with a maximum mining depth of 230 m • Open to depth – focus of expanded 2016 drill program Austin • 11.5 g/t Au over 1

  13. Slide 13: Targeting High-Grade Gold Shoots

    Madsen Drill Program TARGETING HIGH-GRADE GOLD SHOOTS 12

  14. Slide 14: New Near Surface Gold Mineralization

    Madsen Discoveries NEW NEAR SURFACE GOLD MINERALIZATION Developing high-grade targets close to existing mine infrastructure Russet South • 39.1 g/t Au over 2.9 m in PG15-031(1) • 1,500 m west of headframe, up-dip from 8 zone • 600 x 350 m target, open for expansion • 2,500 m drilling ongoing H1 2016

  15. Slide 15: Madsen Mineral Resource

    MADSEN MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Host Type Tonnes g/t Au oz/t oz Au Indicated Austin UC 1,677,000 7.92 0.23 427,000 South Austin UC 850,000 9.32 0.27 254,000 McVeigh UC 374,000 9.59 0.28 115,000 8 Zone UM 335,000 12.21 0.36 132,000 Total Indicated 3,236,000 8.93

  16. Slide 16: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Development scenario based on existing resource & infrastructure to provide foundation for targeted growth through an accelerated exploration program  Estimate mineable tonnes & grade based on ramp-accessible portion of the resource;  Mine desi

  17. Slide 17: Pure Opportunity

    PURE OPPORTUNITY Focused on a prolific jurisdiction with an existing high grade resource & permitted mine infrastructure Team with intimate knowledge of Red Lake geology, district & operations Preliminary Economic Assessment initiated with completion anticipated in Q2 2016 Expanded 16,000 metre dril

  18. Slide 18: Capital Structure

    CAPITAL STRUCTURE Capital Structure Shareholder Base (As at December 31, 2015) Common Shares 125.7 million Major Shareholders Directors, Officers & Associates: ~6% Stock Options 5.7 million Total Strategic: ~27% Warrants 38.2 million AngloGold Ashanti: ~12% Evanachan (McEwen): ~10% Sabina Gold & Sil

  19. Slide 19: Appendix

    APPENDIX pureggld , 18

  20. Slide 20: Russet South: Red Lake High Grade Analogue

    Russet South RED LAKE HIGH GRADE ANALOGUE • Re-folded ultramafics • Mineralized shearing through fold hinges • Quartz carbonate biotite Alpha alteration Target • Mineralized quartz veining • High-grade surface samples & drill intercepts Beta Target • As-Sb-Ag association 8 Zone at • Folded repeat of

  21. Slide 21: Russet South: Red Lake High Grade Analogue

    Russet South RED LAKE HIGH GRADE ANALOGUE Hole ID From (m) To (m) Length (m) Au (g/t) Target PG15-027 96.0 99.5 3.5 9.5 Alpha Including: 98.0 99.5 1.5 18.8 Alpha PG15-028 75.0 86.0 11.0 8.2 Alpha Including: 77.0 82.0 5.0 15.0 Alpha PG15-031 13.2 16.1 2.9 39.1 Beta PG15-032 47.3 49.0 1.7 37.5 Beta PG

  22. Slide 22: Fork Zone: South Plunging & Open

    Fork Zone SOUTH PLUNGING & OPEN • Pure Gold’s near-surface high-grade intercepts include:  PG14-011: 17.2 g/t Au over 3.5 m, starting at 152 metres(1)  PG14-006: 14.6 g/t Au over 1.8 m, starting at 8.5 metres(1)  PG15-037: 3.9 g/t Au over 12.1 m, starting at 134 metres(1) • Fork Zone remains open

  23. Slide 23: Corporate Inquiries

    Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca

Pure Gold Mining — Investor Presentation (March 2016) on 6ix