TransAtlantic Petroleum Ltd

TransAtlantic Petroleum — Shareholder Meeting (June 2015)

105 slides from TransAtlantic Petroleum's shareholder meeting presentation, Jun 10, 2015

  1. Slide 1: 2015 Annual Meeting

    2015 Annual Meeting June 10, 2015 Exhibit 99.1

  2. Slide 2: Forward-looking statements

    Outlooks, projections, estimates, targets and business plans in this presentation or any related subsequent discussions are forward-looking statements. Actual future results, including TransAtlantic Petroleum Ltd.’s own production growth and mix; financial results; the amount and mix of capital expe

  3. Slide 3: TransAtlantic Petroleum: Dallas, TX

    Good fiscal terms and respect for rule of law Deep inventory of low risk projects High quality 3D seismic, horizontal wells, multistage stimulations Experienced management team Transatlantic Petroleum: Dallas, TX Applying proven, North American technology to known international hydrocarbon basins No

  4. Slide 4: TransAtlantic Board of Directors

    TRANSATLANTIC BOARD OF DIRECTORS Name Select Experience Brian Bayley Former President & CEO of Sprott Resource Lending (formerly Quest Capital Corp.), President and Director of Ionic Management Corp. Mel Riggs Chief Operating Officer, President of Clayton Williams Energy, Inc. (22 years with the com

  5. Slide 5: Management team

    Name Position Select Experience N. Malone Mitchell 3rd Chairman & CEO Riata Energy (renamed SandRidge, NYSE: SD), Longfellow Energy; owns 36% of TransAtlantic Todd Dutton President Longfellow Energy; Texas Pacific Oil Company; Coquina Oil Corporation; BEREXCO Inc.; Riata Energy, Inc. James Huling CO

  6. Slide 6: A year in review

    A year in review September 2014 Announce Stream acquisition November 2014 Acquisition of Stream Waterflood response seen in Selmo Establish Dadaş production with Bahar 6 well, TAT’s best well yet October 2014 Serious oil price decline Public placement of $150 mm high yield notes pulled May 2014 Chan

  7. Slide 7: TransAtlantic relative share performance

    Transatlantic Relative Share performance Correlated to peers Source: Bloomberg; 1 year data as of June 3, 2014 -37% One Year +4% Year To Date

  8. Slide 8: Company Growth

    Company Growth Production is sales volumes, includes Albanian uplift Annual Net Reserves - Turkey 27% 28% 55% 32% Growth PD PUD P2 Quarterly Net Production(1)

  9. Slide 9: Reserve accuracy is improving (Downey curve)

    Reserve accuracy is improving (downey curve) Combination of management decisions and asset understanding * Internal estimates. Refer to Note on Internally Generated Reserve Estimates 2013 Pre and Post Drill Reserve Estimates* 2014 Pre and Post Drill Reserve Estimates* 50% 115%

  10. Slide 10: The Good News! Production Potential

    The Good News! Production Potential (Net) * Internal estimates. Refer to Note on Internally Generated Reserve Estimates Requires More CapEx

  11. Slide 11: The Bad News - Cumulative drilling investment

    The Bad news - Cumulative drilling investment What we have to spend

  12. Slide 12: Production vs. cash flow

    Production Vs. cash flow To achieve that growth

  13. Slide 13: With current cash flow and debt service

    With Current cash flow and debt service This is more like what we can do Assuming: No additional liquidity Pay debt to zero Drill only with incremental cash flow

  14. Slide 14: Projects across all stages of development

    projects across all stages of development Reserves Internal Unbooked Prospective Reserves Delvina Gas Pinar Bahar & Goksu Thrace (Basin Centered Model) Albanian Oil Fields Selmo (still 50+ locations) Thrace (Shallow) Cash Flow Stage Acquisition and Exploration Limited Drilling Drilling Outspend Rapi

  15. Slide 15: So here is our plan

    So here is our plan Sell This And Spend This

  16. Slide 16: Transactions – nearly every area

    6 Transactions – Nearly every area Sale- VPP: $40 - $80 million cash proceeds Estimated required loan paydown: $20 - $30 million Carry-Loan: $50 - $90 million September 2015 – July 2016 closings Sensitivity effects on Balance Sheet are at JV’s “expected” and “lowest proceeds” values Production riski

  17. Slide 17: Core corporate strategies

    Area Strategy SELMO Expedite Selmo development to maximize returns prior to 2025 MOLLA Grow Molla assets through drilling to validate 3D then expedite development blocks to establish primary revenue source ALBANIA Redevelop Albanian oil fields to access bypassed reserves, initiate gas sales GAS ASSE

  18. Slide 18: Lee Muncy: Geological discussion

    Lee Muncy Geological discussion VP GEOSCIENCES

  19. Slide 19: Geologists and geophysicists experience

    These geologists and geophysicists have a variety of experience working many diverse basins and plays throughout the world They are all seasoned veterans working in the oil and gas industry with a proven track record of finding hydrocarbons They also bring experience utilizing a lot of the modern im

  20. Slide 20: 82 exploratory prospects and 210 development locations

    This marks a significant increase in the number or exploratory prospects from a year ago and these numbers are expected to grow as the evaluation of SE Turkey and Albania continues Additionally, the number of development locations will increase dramatically if any success is encountered through the

  21. Slide 21: Exploration projects

    SE Turkey Molla 3D conventional prospects (200 MMBO*) Dadaş Sand Play (107 MMBO*) Dadaş Shale Play (Potential reserves undefined at this time) NW Turkey Various Danismen, Osmancik, Sogucak, and Hamitabat Prospects (70 BCFG*) Albania Delvina (200 to 900 BCFG) Cakran, Ballsh, & Gorisht (~150 MMBO*) Bu

  22. Slide 22: SE Turkey Molla 3D area

    SE Turkey Molla 3d area

  23. Slide 23: SE Turkey – Molla 3D area

    22 Bedinan, Hazro or Mardin structural prospects 49 Dadaş Sand stratigraphic prospects SE Turkey – Molla 3D area 71 conventional prospects have been identified in the Molla 3D area * The southern, western, and far eastern portions of the 3D seismic survey have not been evaluated for the Dadaş Sand a

  24. Slide 24: Bedinan, Hazro and Mardin prospects identified so far

    SE Turkey – Molla 3D area 22 bedinan, hazro and mardin prospects identified, so far * Internal estimate. Refer to Note on Internally Generated Reserve Estimates Bahar Field is the analog for many of the Bedinan prospects Cavasulu Prospect - Bedinan Structure Bahar Field - Bedinan Structure 18 MMBO*

  25. Slide 25: SE Turkey – Molla 3D area

    SE Turkey – Molla 3D area * Internal estimate. Refer to Note on Internally Generated Reserve Estimates 44 MMBO* Recoverable Reserve Potential Molla SE / Karagoz Prospect Area – Bedinan Structure

  26. Slide 26: SE Turkey – Molla 3D area

    SE Turkey – Molla 3D area Cavasulu Prospect Bahar Field Molla SE Prospect 1 3 6 Bedinan Karababa A Hazro F4

  27. Slide 27: SE Turkey – Dadaş sand and shale plays

    Dadaş Sand Play Conventional stratigraphic prospects Characterized as sand channels and fans encased within the Dadaş Shale Identified from 3D seismic as amplitude “bright spots” Can be exploited with vertical and/or horizontal wells Dadaş Shale Play Unconventional play targeting silica rich zones w

  28. Slide 28: Dadaş sand play: the concept

    SE turkey – Dadaş sand play: the concept Sandstone bodies encased within the shale source rock Top of Dadaş Shale Target package of sandstone reservoirs Base of Dadaş Shale

  29. Slide 29: Dadaş sand play

    SE turkey – Dadaş sand play Oil bearing zones Major source rock for Diyarbakir Basin Çatak #1 Petrophysical Evaluation Log of Dadaş Shale Section

  30. Slide 30: Dadaş sand play: seismic amplitude anomalies

    SE turkey – Dadaş sand play Identified from 3d seismic data as amplitude bright spots AVO analyses of these “bright spot” anomalies indicate they are associated with Type II and Type III AVO anomalies comparable to AVO anomalies found productive in other basins worldwide

  31. Slide 31: Dadaş sand play: Bahar field AVO gathers

    SE turkey – Dadaş sand play Bahar field area – example of seismic amplitude & location of gathers 1 2 4 5 3 Gather 1 Gather 3 Gather 2 Gather 4 Gather 5 Points 3 & 4 show good AVO response and should be productive while points 1, 2, and 5 fall outside the seismic anomaly.

  32. Slide 32: Dadaş sand play: potential 107 MMBO

    49 reflector packages, interpreted to be sand bodies within the Dadaş Shale, have been mapped from the Molla 3D seismic data………so far! Based on 160 acre spacing, there are approximately 175 drilling locations if all of the seismic anomalies are drilled Potential to recover 107 MMBO* from these sand

  33. Slide 33: NW Turkey Thrace Basin prospects

    Nw turkey Thrace basin prospects

  34. Slide 34: NW Turkey – Thrace Basin

    NW Turkey – thrace basin Not shown are leads & prospects in the Edirne Area and on recently nominated license blocks Structure map on top of Mezardere Formation showing license blocks and TransAtlantic’s prospect areas within the Thrace Basin .

  35. Slide 35: Exploratory prospects on TAT acreage in Thrace Basin

    8 exploratory prospects are currently identified on TAT acreage within the Thrace Basin The prospects target the Danismen, Osmancik, Sogucak, and Hamitibat formations An example of the Thrace Basin Prospects is illustrated on the following slides NW Turkey – thrace basin 70 BCF* recoverable reserves

  36. Slide 36: Guney Reisdere prospect

    2,900 meter drill depth with 38 BCF* of recoverable gas reserves Sogucak LS, Ceylan Tuff, and Hamitibat SS targets NW Turkey – thrace basin Guney Reisdere prospect * Internal estimate. Refer to Note on Internally Generated Reserve Estimates Structure Map – Sogucak Limestone

  37. Slide 37: NW Turkey – Thrace Basin target levels

    NW Turkey – thrace basin Target Level Osmancik Fm. M.Dere Fm. Teslimkoy Fm. Ceylan Fm. Sogucak Fm. Hamitabat Fm. The prospect is a down thrown 3-way structure trapped against a major fault. The reservoirs are adjacent to the kitchen area located in the center of the Thrace Basin.

  38. Slide 38: Delvina Prospect, Albania

    DELVINA PROSPECT ALBANIA _~w

  39. Slide 39: Albania – Delvina prospect

    Discovered in 1987 Four wells have been drilled on the structure with two of the four productive The Delvina 12 and Delvina 4 wells will require relatively simple workovers to restore production A fifth well, the Delvina 34, was spud in April 2014 and drilled to 2,346 feet before the previous operat

  40. Slide 40: Albania – Delvina prospect: current plans

    albania – delvina prospect There appear to be multiple structures present beneath the Delvina Block Current plans: Complete the drilling of the D-34 well Drill a new well on one of the adjoining structures Evaluate full field development, processing and gas marketing Line of sections shown on the fo

  41. Slide 41: Geological profile across Delvina field

    Geological Profile Across Delvina Field Showing Delvina 34 Location Illustrated on the previous map as the green cross-section albania – delvina prospect

  42. Slide 42: Albania Ballsh, Gorisht & Cakran

    albania Ballsh, gorisht & cakran

  43. Slide 43: Albania – Ballsh, Gorisht & Cakran

    These oil fields were discovered in the 1960-70’s Vast majority of wells only drilled into producing zone until first good flow of oil For example, only 4 wells drill the entire 750m column in the Gorisht Field So far only a small percentage of oil in place has been recovered from these fields Revit

  44. Slide 44: Albania – Ballsh, Gorisht & Cakran

    albania – Ballsh, Gorisht, & Cakran In the Gorisht Field, 269 wells penetrated the Eocene Limestone section, however, only 4 of those wells penetrated the entire thickness of prospective reservoir. It is anticipated that the Ballsh, Gorisht, and Cakran fields contain multiple reservoir zones vertica

  45. Slide 45: Albania – Ballsh, Gorisht & Cakran frac barriers

    albania – Ballsh, Gorisht, & Cakran Frac Barrier Frac Barrier Frac Barrier Frac Barrier Frac Barrier Kocul 44 Gorisht 240 Most of the wells only penetrated the top 50 M of limestone reservoir and were completed only in the shallowest portion of the reservoir Deeper wells show oil saturation througho

  46. Slide 46: Initial deepening candidates and new drill locations

    albania – Ballsh, Gorisht, & Cakran Gorisht Ballsh Cakran Initial deepening candidates New drill locations Structure maps on the top of the Eocene Limestone. Plan to deepen wells Ballsh and Gorisht are relatively shallow fields, drilling new wells may be a better option than deepening older and pote

  47. Slide 47: Bulgaria North Koynare Prospect

    bulgaria North Koynare Prospect

  48. Slide 48: Bulgaria – North Koynare prospect

    Bulgaria – north koynare prospect North Koynare Prospect North Koynare Prospect is seismically tied and analogous to the Dolni Dabnik and Gorni Dabnik fields located 23 KM to the northeast The potential exists for numerous prospects throughout the 163,000 acre (66,000 hectare) production concession.

  49. Slide 49: Bulgaria – North Koynare prospect structure map

    Bulgaria – north koynare prospect A A’ B B’ R1 R2 Proposed Location 1400 Acres (570 Hectares) Dolni Dabnik Structure Map 3D seismic defined structure (62 km2 3D seismic survey) Prospect is located on a different structure than what was targeted in the Deventci R1 and R2 wells

  50. Slide 50: Bulgaria – North Koynare prospect: Dolni Dabnik objective

    Bulgaria – north koynare prospect Dolni Dabnik is primary objective B B’ Dolni Dabnik Triassic Unconformity PROPOSED LOCATION A A’ R1 Dolni Dabnik PROPOSED LOCATION 200M CLOSURE HEIGHT Triassic Unconformity It is a Lower Triassic aged vuggy, fractured dolomite with possible hydrothermal dolomite pro

  51. Slide 51: Selmo field development projects

    Selmo field Development projects

  52. Slide 52: SE Turkey – Selmo Field: what has changed since last year

    Drilling locations have been “high-graded” using 3D seismic data Production performance has been tied to the seismic data for all of the wells in the field There is a correlation between high amplitude peak responses and better production. These high amplitude peak responses are indicating zones whe

  53. Slide 53: Selmo field development locations identified

    SE Turkey – Selmo Field 53 development locations have been identified in the selmo field MSD Horizontal (43) LSD Horizontal (2) MSD/LSD Vertical (8) MSD Top Depth Structure map (BSL-ft)

  54. Slide 54: SE Turkey – Selmo Field high amplitude peak responses

    SE Turkey – Selmo Field High amplitude peak responses shown here as continuous reflectors suggest porosity typically associated with dolomitic facies Model validated in the Selmo 35 H-2 well with EUR of 276 MBO (D&M) from MSD section S 35 H-2 MSD Reflector Proposed S 35 H-1 MSD Reflector

  55. Slide 55: Bahar field development projects

    bahar field Development Projects

  56. Slide 56: Bedinan development locations in Bahar field

    SE turkey – Bahar Field 11 bedinan development locations identified in bahar field Existing Well Proposed Well Bahar Field – Structure Map Top Bedinan

  57. Slide 57: Bahar Field: further potential in the Hazro

    Plan to drill a horizontal well in the Bahar Field to further test the Hazro F4 proven productive in the Bahar 1 and Bahar 2 ST wells SE turkey – Bahar Field Further potential in the hazro Bahar Field – Structure Map Top Hazro Bahar 3 Bahar 2 ST Bahar 6 Bahar 4 Bahar 1 ST Bahar 2

  58. Slide 58: James Huling: Engineering discussion

    James huling Engineering discussion CHIEF OPERATING OFFICER

  59. Slide 59: Selmo Field – Acquire and Exploit

    2009: Acquired mature legacy field with many infrastructure problems Upgraded facilities and infrastructure and doubled production with infill drilling and exploitation Started horizontal redevelopment in 2013 and realized 167% production growth from acquisition Over 50-proved locations remain Comme

  60. Slide 60: Proven reserves growth Selmo Field

    Proven Reserves Growth Selmo Field Case history: Acquire and Exploit BOPD Well Count MBOE Oil Well Count

  61. Slide 61: Selmo Waterflood: expansion in progress

    Selmo Waterflood: Expansion in progress Waterflood yielding ~105 bopd & incremental EUR of 400 MBO* Started Waterflood Pilot BPD Water Cut (%) * Internal estimate. Refer to Note on Internally Generated Reserve Estimates

  62. Slide 62: Selmo field as a case

    Using state of the art technology with proven exploitation techniques TransAtlantic continues to increase reserves from this fifty year old field Selmo field as a case Mature legacy fields provide years of project harvesting CUM Oil (Bbls) Since March of 2009 we have produced 5.4 MBO TAT Acquisition

  63. Slide 63: Bahar field case history: Explore & Develop

    Organic growth from proprietary 3D seismic inventory Commenced production in 2013 Proved reserve growth from inception to 3.2 MMBOE at YE2014 3P Reserves growth to 6.4 MMBOE at YE2014 Conventional production from the Hazro and Bedinan Resource and conventional potential in the Dadaş Significant conv

  64. Slide 64: Bahar field case study: demonstrated production growth

    Organic Reserves Growth Bahar field case study: Explore & Develop Demonstrated Production Growth BOPD MBOE

  65. Slide 65: Bahar Field well results

    Bahar 6 was completed in both the Dadaş and Bedinan formations Production is outperforming the average curve of Bedinan only production All wells are vertical Bahar Field Bahar 1: Gas Lift; Bahar 3, 4 & 6: Artesian flowing wells Bahar 6: Comingled Dadaş and Bedinan production: 113 MBbl in 200 days B

  66. Slide 66: Bahar field case study: Explore & Develop

    Organic Growth from 3-D Seismic using modern completion techniques. Currently realizing growth through development. Future horizontal development, secondary potential, Dadaş resource potential. Organic Reserves Growth Bahar field case study: Explore & Develop Demonstrated Production Growth Oil (Bbls

  67. Slide 67: Proven efficient operator

    Proven EFFICIENT OPERATOR improving efficiencies and lowering operating costs (USD/BOE) Thousand USD/Month -48%

  68. Slide 68: Albania growth potential

    ALBANIA Growth POTENTIAL Albanian production excludes gas LEGACY FIELDS – Exploitation Opportunity EXHIBIT A: “SELMO FIELD”

  69. Slide 69: Albania transition

    ALBANIA Transition Roll-out New Organization Remove Prior Management Strike Starts Power Turned Off Transformer Failure Transformer Repair Transformer Failure Replace Gorisht Field Manager Stabilized Production Final discussions regarding Albania Amending Agreements BOPD

  70. Slide 70: Albania oil fields plan

    Albania Oil fields Plan Gorisht & Ballsh then Cakran Existing Wells Field Development Strategy (1) Lower high capacity pumps to formation level (3) Drill horizontally into data-rich upper oil zones (4) Drill horizontally into lower oil saturated zone (2) Drill deep, vertical, multi-stage test wells

  71. Slide 71: Albania transition: flow meters

    Installed flow meters for custody transfer of oil sales which provides check on volume & weight measurements ALBANIA transition Flow meters Inlet Flowmeter Outlet Flowmeter

  72. Slide 72: Albania transition: 14-well PCP installation campaign

    ALBANIA Transition Started 14-well PCP Installation Campaign Replacing dilapidated artificial lift Utilizing existing PCP inventory with replacement tubing and rods “Working” with existing infrastructure Source: Kudu

  73. Slide 73: Albania finalizing work program

    ALBANIA Finalizing work program 2015 Focus: Finalize Albania Amending Agreements Take over remaining Ballsh wells Return wells to production Upgrade production facilities Upgrade power infrastructure Upgrade SWD infrastructure Improve artificial lift Focus reinjection of water Replace testing facili

  74. Slide 74: Todd Dutton: Current activity

    Todd dutton Current activity PRESIDENT

  75. Slide 75: Current activity

    Albania Oil Fields – Switching out and lowering pumps on 14 wells Delvina 34 Gas Well – Drilling ahead at 6,117 Ft Pinar 1 Completion (Molla) – Slim Hole Tools - in progress South Gosku Completion – TD above pay zone with rig. Drill pay with pulling unit. Spud Bahar 9 – Currently running surface cas

  76. Slide 76: Bahar Field map

    Bahar Field map Well Locations (Current Drilling Order: 9, 7, 5, 2H-1) Bahar 2ST Bahar 2 Bahar 3 Bahar 4 Bahar 6 Bahar 1ST Bahar 2H Bahar 9 Bahar 5 Bahar 11 Bahar 8 Bahar 10 Bahar 12 Bahar 7

  77. Slide 77: Molla project lifecycle

    Molla project lifecycle Vertical Horizontal Lease Acquisition Basin Position Regional Geology (Gravity) Initial 2D Seismic Reentry & Discovery 3D Seismic & Analysis Completion Evolution Development drilling from 3D (100%) Prospect Drilling Using 3D Active Development Drilling Additional 2D and new w

  78. Slide 78: Bahar Field – string casing design

    Bahar Field – 3 String Casing Design MARDIN HAZRO DADAS BEDINAN 100’ MD/TVD 2,640’ MD/TVD TOC @ 7,700’ Setting Depth TVD/MD (rkb) RKB Elev. 2276’ Hole Size Casing 20” 13 3/8” 5 ½” @ 10,550’ TD 8 ½” Hole 12 ¼” Hole 9 5/8” 17 ½” Hole 8,200’ MD/TVD TOC @ 7,100’ TOC @ 1,800’ 2013 & Prior 4 to 5 string c

  79. Slide 79: Bahar Field – 2 string casing design

    2015 Plan to attempt this casing design on the #9 and #7 wells Why this design? Less expensive Less pipe Smaller pipe One logging run Faster well time – twice as many wells for same cost over an extended period More wells, more production Plan for horizontal wells 5 ½” is optimal size pipe for reser

  80. Slide 80: What is microseismic?

    What is Microseismic? Utilizes 3D seismic technology Indicates where frac starts and where it goes (logs say NNE-SSW, but we really don’t know) Allows measurement of stimulated and “propped” reservoir rock Why is it important to run on Bahar wells? More precise estimate of drainage with current frac

  81. Slide 81: Microseismic survey

    Microseismic Survey Image Source: MicroSeismic Surface Arrays

  82. Slide 82: Microseismic survey

    Microseismic Survey Image Source: MicroSeismic Fracture Orientation - Horizontal Wellbore Direction

  83. Slide 83: Microseismic survey

    Microseismic Survey Image Source: MicroSeismic Frac Width Frac Height Stage Coloring Legend UP DOWN N E S W

  84. Slide 84: Microseismic survey stimulated rock volume results

    Microseismic Survey Stimulated Rock Volume Results Image Source: MicroSeismic Stimulated Reservoir 14 Stages 102,000#/Stage 11 Stages 31,000#/Stage IP 1884 BOEPD IP 978 BOEPD Propped Reservoir

  85. Slide 85: Microseismic survey

    Microseismic Survey Image Source: MicroSeismic Frac Height Frac Width Distance from Stage Center X (feet) Distance from Stage Center Z (feet) Propped Fracture Volume (ft3) UP DOWN Distance from Stage Center X (feet) Distance from Stage Center Y (feet) Propped Fracture Volume (ft3) N E S W

  86. Slide 86: What will horizontal wells do for us in Bahar?

    Microseismic Surveys What will Horizontal wells do for us in Bahar? Horizontal Play Average Stage Count Average # Prop/Stage Average 12 mo Prod MBOE Average Prod/Stage MBOE Average Prod/# Prop BOE Eagle Ford 25 224,400 558 22.3 0.099 Bone Springs 15 280,000 176 11.7 0.042 Wolfcamp 35 161,714 135 3.9

  87. Slide 87: Drilling investment (gross)

    Year Wells Gross CapEx BOE/D Gross TAT CapEx BOE/D Net Partner CapEx(2) Partner BOE/D 2015E(1) 7 $28.4 7,520 $25.6 5,430 $2.8 1,144 2016E 44 $135.4 9,440 $74.7 5,570 $60.7 2,687 2017E 57 $203.5 17,630 $94.6 10,430 $108.9 4,999 2018E 44 $205.1 23,320 $124.3 15,320 $80.8 5,078 2019E 42 $204.3 23,910 $

  88. Slide 88: Drilling investment (net)

    Year Wells Gross CapEx Net of Sales BOE/D Gross TAT CapEx Net of Sales BOE/D Net Partner CapEx Net of Sales(2) Partner BOE/D 2015E(1) 7 $0.3 7,520 - 5,430 $0.3 1,144 2016E 44 $44.6 9,440 $21.4 5,570 $23.2 2,687 2017E 57 $30.2 17,630 - 10,430 $30.2 4,999 2018E 44 $6.7 23,320 - 15,320 $6.7 5,078 2019E

  89. Slide 89: Production wedge

    Production wedge * Internal estimate. Refer to Note on Internally Generated Reserve Estimates Selmo Albania Gas Albania Oil Molla Exploration Molla Development Current Wells

  90. Slide 90: Wil Saqueton: Financial

    Financial Wil Saqueton CHIEF FINANCIAL OFFICER

  91. Slide 91: Cost savings and financing actions

    Have implemented actions that will generate ~$9mm annualized cash cost savings across G&A and LOE Turkey at ~$10mm annualized cash savings Dallas costs up slightly due to investment of G&G staff build up Albania cost reduction opportunities still to be implemented Completed semi-annual redeterminati

  92. Slide 92: Financial model overview

    The following slides portray a simplified Balance Sheet (Cash, Debt) under several scenarios Key assumptions modeled Brent at $65 through 2016 and at $75 from 2017 through 2020 2014 actual realized discounts to Brent Production risking held constant Joint ventures (JVs) realized at “Expected” pricin

  93. Slide 93: Balance sheet – current cash flow and debt

    PUD drilling, no exploration Production remains relatively flat at ~6,000 BOE/D All Free Cash Flow allocated to debt pay down Cash balance hovers near nil $55mm Convertible Debt bullet maturity in June 2017 would require refinancing Conversion to equity would require significant increase in Brent pr

  94. Slide 94: Balance sheet – joint ventures

    JV proceeds and FCF allocated to asset development and debt pay down Cash balance significantly improved JVs provide more options to address Convertible Debt bullet maturity Expect to improve debt capacity by 2017 through production growth and balance sheet improvement Balance sheet (simplified) – J

  95. Slide 95: EBITDAX with joint ventures (expected case)

    EBITDAX projected at ~$2.00/share when convertible notes mature In this scenario, we believe conversion of convertible notes to equity would be likely Ebitdax with joint ventures (expected case) EBITDAX/Sh ~$5.50 $55mm Convertible Notes bullet maturity EBITDAX Per Share

  96. Slide 96: Balance sheet – convert to equity

    Convertible debt converting to equity results in Same debt balance curve but Significantly more cash Even JV LP case provides ~sufficient funding However, this is not our primary plan Balance sheet (simplified) – convert to equity $55mm Convertible Notes convert to Equity Cash/Debt (USD)

  97. Slide 97: Balance sheet – joint ventures and bond issue

    Closing two significant JVs provides catalyst to enable 5-7 yr $150mm bond issuance We believe we can accomplish this by end of 2015 to 1H’16 at which time leverage ratio projected at ~1.0X Provides sufficient cash for JV LP case to comfortably refinance Convertible Notes Excess cash generated to be

  98. Slide 98: So what's different now?

    So what’s different now? Much more “Proof” than 2 years ago More reasonable terms for partner “Buyer’s market” issues Some accept terms but desire operations Some don’t want operations but less technical What can go better? Execute JV’s sooner Prices rise Well costs and/or operating expenses lower t

  99. Slide 99: Turkey elections

    AKP (Erdogan) highest vote but not absolute control Kurds win parliament representation – likely greater peace in SE Turkey 4 parties over 10% Waiting on coalition or minority agreement No forecast change in Oil & Gas industry Turkey elections Democracy working, No Contested results

  100. Slide 100: Q&A

    N. Malone Mitchell 3rd Chairman & CEO Todd Dutton President James Huling COO Wil Saqueton VP & CFO Lee Muncy VP Geosciences Q&A

  101. Slide 101: Contact

    Lizzy Chesnut Investor Relations (214) 265-4716 lizzy.chesnut@tapcor.com Contact www.TransAtlanticPetroleum.com

  102. Slide 102: Core corporate strategies

    Area Strategy SELMO Expedite Selmo development to maximize returns prior to 2025 MOLLA Grow Molla assets through drilling to validate 3D then expedite development blocks to establish primary revenue source ALBANIA Redevelop Albanian oil fields to access bypassed reserves, initiate gas sales GAS ASSE

  103. Slide 103: Near term execution strategies

    Area Strategy Timing SELMO Monetize via sale, VPP, JV 20% - 30% 3-6 months Follow through with Phase II of waterflood 3-6 months Use proceeds / carry from transaction to expedite drilling with 2 rigs 6-9 months MOLLA Continue internal Bahar-Goksu development 3-6 months Execute a JV for Molla explora

  104. Slide 104: Mid term execution strategies

    Area Strategy Timing SELMO Aggressively drill up PUD locations with 2 rigs (40-50 wells) 9-18 months Complete Phase III & IV waterflood projects 9-18 months MOLLA Complete Bahar development (10-15 wells) 6-12 months Initial Molla exploration to de-risk identified structures (7 wells) 9-18 months ALB

  105. Slide 105: Long term execution strategies

    Area Strategy Timing SELMO Complete development drilling and WF projects 2-3 years Produce field with minimal investment until 2025 3-5+ years MOLLA High Grade and begin multi-field development based on exploration success 2-3 years Full scale, multi-rig development of conventional and unconventiona