Eldorado Gold Corporation · TSX:ELD

Eldorado Gold — Investor Presentation (March 2006)

41 slides from Eldorado Gold's investor presentation, March 2006

  1. Slide 1: Eldorado Gold - March 2006

    *@ eldoradogold ability March 2006

  2. Slide 2: Forward looking statement

    Forward looking statement Certain of the statements made herein may contain Company’s Prospectus dated January 31, 2006. Forward- forward-looking statements within the meaning of the looking statements herein include statements regarding United States Private Securities Reform Act of 1995 and the ex

  3. Slide 3: Corporate

    Corporate Shares Issued: 340,000,000 Year End Cash: US$33.8 M Net Financing Cash: US$155.0 M Net Debt: US$0.00 Shares Listed: TSX: ELD AMEX: EGO Indices : TSX Gold AMEX HUI 3

  4. Slide 4: Growth Profile

    Growth Profile Production ounces of Gold (thousands) 4

  5. Slide 5: Cash Flow and Earnings per share

    Cash Flow and Earnings per share US$ 5

  6. Slide 6: Proven and Probable Reserves

    Proven and Probable Reserves 6

  7. Slide 7: Operations. Projects. Exploration.

    Kisladag Efemçukuru Vancouver Head Office Tanjianshan Biga Peninsula Demir JV Tartarugalzinho The Pontide Volcanic Belt Vila Nova São Bento Mine Operations. Projects. Exploration. 7

  8. Slide 8: Turkey

    Turkey • Kisladag • Efemçukuru • AS Project • Pontides • Biga Peninsula Istanbul Biga Peninsula Ankara Pontides AS Project Izmir TURKEY Efemçukuru Kisladag 8

  9. Slide 9: Kisladag Mine

    Kisladag Mine • Grass roots exploration discovery by Company in 1997 • Received Environmental Positive Certificate June 2003 • Commissioning began in February 2006 • 14 year open pit mine with 5.1 million ounces of reserve • Year 1 production 144,000 ounces; Year 2 – 14 production 250,000 ounces • I

  10. Slide 10: Kisladag construction schedule 2006

    Kisladag construction schedule 2006 10

  11. Slide 11: Kisladag production and unit costs

    Kisladag production and unit costs 11

  12. Slide 12: Kisladag Mine

    Kisladag Mine 12

  13. Slide 13: Crushing, Screening Plant

    Crushing, Screening Plant 13

  14. Slide 14: Leach Pad

    Leach Pad 14

  15. Slide 15: ADR Plant

    ADR Plant 15

  16. Slide 16: Efemçukuru Project

    Efemçukuru Project • Grass roots exploration discovery by Company • High grade vein system with 1.1million ounces of resource with potential for expansion • Received Environmental Positive Certificate September 2005 • Advancing project through permitting, feasibility to construction in 2007 • Underg

  17. Slide 17: Efemçukuru development schedule

    Efemçukuru development schedule 17

  18. Slide 18: Efemçukuru production and unit costs

    Efemçukuru production and unit costs 18

  19. Slide 19: Efemçukuru cross section

    Efemçukuru cross section. 19

  20. Slide 20: AS Project

    AS Project • Part of Demir Joint Venture • Porphyry style gold and copper mineralization in altered porphyritic rocks • Coincident geochemical and geophysical anomalies spread over a large area • Currently drilling with reverse circulation (RC), and diamond drill rigs • 2006 work program will incorp

  21. Slide 21: Copper Soil Anomalies and Drill Locations

    Copper Soil Anomalies and ” Drill Locations (igure 2) eldoradogold Soil Geochemistry: Cu ppm > 500 ppm Cu > 250 ppm Cu > 100 ppmCu * “ > 50 ppm Cu % H

  22. Slide 22: AS Project Gold Soil Anomalies and Drill Locations

    AS PROJECT Gold Soil Anomalies and Drill Locations (figure 1) 2 eldoradogold Solak Anomaly [N/ pE——_— 22

  23. Slide 23: China

    China Beijing Tanjianshan 23

  24. Slide 24: What is Eldorado's Strategy in China?

    What is Eldorado’s Strategy in China? • Build a substantive business in China producing annually 250,000 to 300,000 ounces of gold • Build by exploration and acquisition • Develop our business by utilizing skills and expertise of Chinese Mining industry • Open to joint ventures • Apply our companies

  25. Slide 25: Tanjianshan Mine

    Tanjianshan Mine Gansu Province To Dunhuang Tanjianshan Dachaidan Gangcha Au Deposits Xining Road Dulan Gonghe Railway Qinghai Province Magin 25

  26. Slide 26: Tanjianshan Mine

    Tanjianshan Mine • Acquired Tanjianshan (“TJS”) with the acquisition of Afcan Mining Corporation September 13, 2005 • Company currently has 85%. Partners; Qinghai First Brigade and Daichaidan Gold Mine 15%. With capital expenditures of US$ 50 million can earn up to 90%. Current cost estimate for com

  27. Slide 27: Tanjianshan construction schedule

    Tanjianshan construction schedule 27

  28. Slide 28: Tanjianshan production and unit costs

    Tanjianshan production and unit costs 28

  29. Slide 29: Plant Construction

    Plant Construction 29

  30. Slide 30: Employee's Camp

    Employee’s Camp 30

  31. Slide 31: SAG Mill on Foundation

    31 SAG Mill on Foundation ad

  32. Slide 32: Tailings Dam Impoundment

    Tailings Dam Impoundment 32

  33. Slide 33: Brazil

    Brazil Operations • Sao Bento Mine Exploration • Vila Nova, AP State • Tartarugalzinho, AP State Tartarugalzinho Vila Nova BRAZIL Brasilia Belo Horizonte São Bento Mine Rio de Janeiro 33

  34. Slide 34: São Bento Mine

    São Bento Mine • Underground mine in operation since 1986. Mine has produced 1.5 million ounces of gold • Gold is recovered using conventional milling, flotation and a combination of bioxidation and pressure oxidation • All Brazilian management and staff • Good health and safety record • Mine receiv

  35. Slide 35: São Bento Mine

    São Bento Mine 35

  36. Slide 36: Venezuela

    Venezuela Suriname Roraima State Gold Mines Advanced Projects Eldorado Gold Projects Lower Proterozoic Terrain Gold Trends French Guyana Vi ] Amapari @ Sierra Leone Liberia kilometers eldoradogold Cote D'Ivoire West African Shield Bogoso/Préstea

  37. Slide 37: Vila Nova Gold and Iron Projects

    VILA NOVA | Gold and Iron Projects eldoradogold (figure 1) ==== Pit Boundary Road G Gold Mineralized Zone (lron Formation Units) ® Hematite-rich Iron Formation 418500 mE © Completed Drill Holes 0.25 { es kilometers CS x Iron Ore Project Area Gold Project Area | 417000 mE 418500 mE

  38. Slide 38: Vila Nova Gold

    Vila Nova Gold • Land Position: 4,254 hectares • Geologic Environment: Lower Proterozoic terrain. Gold mineralization is associated within carbonate altered, sheared and folded banded iron formation with a sequence of clastic sediments, mafic volcanic and ultramafic rock. Garimpero workings extend f

  39. Slide 39: Vila Nova Iron Ore

    Vila Nova Iron Ore • 2005 Drill Program produced an Inferred Resource of 8.7 million tonnes estimated with an iron content of 65% • 2006 Program: mapping extensions of the main structure, followed by additional drilling and metallurgical test work. Scoping study will be completed in 2006 • Budget: $

  40. Slide 40: Summary

    Summary • Regionally focused • Superior growth profile • Long living low cost assets • Strong balance sheet • Proven ability to explore, develop and operate 40

  41. Slide 41: Thank you

    *@ eldoradogold ability Thank you

Eldorado Gold — Investor Presentation (March 2006) on 6ix