Orsted · OMXCOP:ORSTED

Orsted — DONG Energy — Q1 2012 Earnings Presentation

30 slides from Orsted's earnings presentation, May 11, 2012

  1. Slide 1: Financials 2012 First Quarter Results

    FINANCIALS 2012 FIRST QUARTER RESULTS 11 May 2012

  2. Slide 2: Disclaimer

    Disclaimer Certain statements in this presentation are based on the We urge you to read our annual report available on our website beliefs of our management as well as assumptions made by at www.dongenergy.com for a discussion of some of the and information currently available to the management. fac

  3. Slide 3: Agenda

    Agenda  DONG Energy highlights  Financials  Outlook  Appendix 3

  4. Slide 4: Highlights first quarter 2012

    Highlights first quarter 2012 Highlights 1 Key figures DKKbn  EBITDA of DKK 3.6bn (down 25% y/y) 16 14.1  Net debt of DKK 25.1bn (up 6% vs. Q4 11) 14 13.4 13.8  Adjusted net debt/EBITDA at 2.2x (1.9x at Q4 11) 12 9.3 10  Net result at DKK 2.3bn (up 56% y/y) 8 6 4.7 4.5 4.8 Outlook: 4 3.6 2.9 2.3

  5. Slide 5: Recent events: New CEO – no change in strategic direction

    Recent events: New CEO – no change in strategic direction  In April 2012, Henrik Poulsen was appointed new CEO of CV Henrik Poulsen DONG Energy  Born: 1967  2008-: CEO TDC  Henrik Poulsen joins from TDC, where he is currently CEO  2006-2008: Operating partner at private equity firm KKR  Carste

  6. Slide 6: Recent events: Investment in specialised installation vessel

    Recent events: Investment in specialised installation vessel  The new vessel forms part of DONG Energy's industrialisation concept for offshore wind to:  Reduce installation time  Reduce construction costs  Enhance robustness in the installation phase  Enhance flexibility in planning  The new

  7. Slide 7: Recent events: Long-term pipeline – Round 3 Irish Sea

    Recent events: Long-term pipeline – Round 3 Irish Sea  Joint venture 50/50 together with Centrica to co-develop Round 3 projects in Irish Sea Zone  Potential first construction of DONG Energy operated projects at the end of this decade  The entire zone has a potential capacity of 4.2GW likely to

  8. Slide 8: Recent events: Increased costs to repair Siri platform

    Recent events: Increased costs to repair Siri platform  Raised repair cost estimate for the Siri platform from DKK 2bn Background to DKK 3.5bn (of which DKK 0.6bn was incurred in 2011) Aug. 2009 Production stopped after a routine inspection revealed  Of the remaining costs (DKK 2.9bn), the expecta

  9. Slide 9: New assets on stream in 2012

    New assets on stream in 2012 Walney 2 London Array • 184MW UK offshore wind farm • 630 MW UK offshore wind farm • DONG Energy's share: 50.1% • DONG Energy's share: 50% • Full operation since Apr. 2012 • First power expected in Q3 12 Lincs Anholt • 270MW UK offshore wind farm • 400 MW DK offshore win

  10. Slide 10: Focus on divestments and partnerships continue

    Focus on divestments and partnerships continue  Divestments & strategic partnerships have continued in 2012 in order to: ‒ Focus on core activities ‒ Balance investment in new assets ‒ Diversify risks Concluded or agreed divestments (DKKbn) 2012 ytd: DKK 7.6bn 0.3 23.0 4.7 9.5 2.6 5.9 2010 2011 Oil

  11. Slide 11: Agenda

    Agenda  DONG Energy highlights  Financials  Outlook  Appendix 11

  12. Slide 12: Market prices

    Market prices Hydro balance Green Dark Spread (monthly average) TWh EUR/MWh 20 50 2012 40 10 Forward prices 30 0 20 -10 10 -20 0 -30 -10 2011 -20 -40 -30 -50 -40 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2010 2011 2012 2013 Range 2004-2011 Median 2004-2011 DK avg. Nord Pool (system) EEX Source

  13. Slide 13: Selected Financial Figures

    Selected Financial Figures Business Performance DKK million Q1 12 Q1 11 2011  EBITDA decreased to DKK 3.6bn (down 25% y/y) Revenue 19,927 15,957 56,842  Higher oil & gas prices and higher gas production EBITDA 3,583 4,760 13,770  Increased production from new wind farms Financial items, net -429

  14. Slide 14: Exploration & Production

    Share of group EBITDA Exploration & Production Higher oil and gas prices 46% Operational figures Operational highlights mboe  Marulk started production in April 2012 30 25  Oselvar started production in April 2012 20 65% 63% 35%  Decision to develop the Danish Oil & Gas field Hejre 15 46% 10  In

  15. Slide 15: Wind Power

    Share of group EBITDA Wind Power Contribution from new assets 17% Operational figures Operational highlights TWh  Walney 2 went into full operation in April 2012 5 30% 4 25%  First power from London Array expected in Q3 12 20% 3  JV with Centrica to co-develop Round 3 licenses in Irish Sea 15% 2

  16. Slide 16: Thermal Power

    Share of group EBITDA Thermal Power Lower production and lower GDS 19% Operational figures Operational highlights TWh TJ  Divestment process of 8 decentral power stations 20 60 completed – total sales sum of DKK 0.3bn 50 15 40  Refurbishment of Studstrup coal-fired power station – increases lifeti

  17. Slide 17: Energy Markets

    Share of group EBITDA Energy Markets Lower earnings from gas sales -4% Operational figures Status on gas business TWh TWh  Large oil/gas spread impacting earnings negatively 140 14 120 12  Renegotiations ongoing with gas suppliers – DONG 100 10 Energy expects to obtain similar terms as other large

  18. Slide 18: Sales & Distribution

    Share of group EBITDA Sales & Distribution Stable earnings 22% Operational figures Operational highlights Q1 12 Q1 11  Acquisition of Shell Gas Direct completed in May 2012 Gas sales TWh 7.7 8.2 Distribution of gas TWh 3.6 4.2 Power sales TWh 2.1 2.1 Distribution of power TWh 2.4 2.5 Transport of o

  19. Slide 19: Debt overview

    Debt overview Gross interest-bearing debt and hybrid capital Key ratios loan portfolio (incl. hybrid capital) DKKbn Q1 12 Q4 11 70 Share of fixed rate1 95% 92% 60 Duration (years) 2 10.0 7.7 9.5 Average time to maturity (years) 3 10.6 9.4 50 Hybrid 2.9 1.3 9.5 Repo Average interest rate3 4.1% 4.1% 4

  20. Slide 20: Hedging – Limited energy price exposure

    Hedging – Limited energy price exposure Exposure Power 2012-2013 (DKKbn) DKKbn 3.0 2.5 2.5 2.0 1.5 1.2 1.0 0.8 0.5 Financial impact in 2012-2013 from 0.1 0.0 10% change Renewable power Thermal power production Market price Impact (DKKm) production (outright) (GDS/GSS) Oil & gas DKK 22m* Before hedgi

  21. Slide 21: Agenda

    Agenda  DONG Energy highlights  Financials  Outlook  Appendix 21

  22. Slide 22: Outlook

    Outlook EBITDA outlook EBITDA 2012 expected to be in line with 2011  New oil & gas fields Oselvar and Marulk  Full ownership of the Siri field  First power from wind farms London Array, Lincs and Anholt  Full year contribution from Walney wind farm  Negative impact from Siri platform repair  R

  23. Slide 23: Targets

    Targets EBITDA target DKKbn Target to: 20 Double EBITDA from 2009 to 2015 (double to DKK 17.6bn) 15  EBITDA in 2013 expected to be significantly above 2012 10  Full year effect from Anholt, London Array and Lincs 5  Full year effect from Oselvar and Marulk  Positive impact from start up of the o

  24. Slide 24: Q&A

    Q&A For further information please visit our website dongenergy.com/EN/Investor/ 24

  25. Slide 25: Outlook Market Prices

    Outlook Market Prices a nnua l re port 20 11, Curre nt as s ump- (re s t o f ye ar) 9 Ma rch 20 12 Assumption, tio n, 2 0 12 Q1 20 12 Actua l, (ave rage ) Oil, Bre nt USD/bbl 109 105 118 Ga s, TTF EUR/MWh 24 23 24 Ga s, NBP EUR/MWh 24 23 24 Ele ctricity, Nord Pool syste m EUR/MWh 41 37 38 1 Ele ctri

  26. Slide 26: Business Performance – Q1 12

    Business Performance – Q1 12  In Q1 12, the difference between Business Performance and IFRS amounted to DKK 2.3bn Business Performance EBITDA DKK 3.6bn Adjustments DKK 2.3bn MtM of financial and physical hedging contracts relating to other periods DKK -1.6bn Deferred losses/gains relating to finan

  27. Slide 27: Dividend, Funding and Rating

    Dividend, Funding and Rating Long term capital structure target Funding strategy and Debt Programmes  Maintain a minimum rating of BBB+ / Baa1  External funding primarily to be carried out  Adjusted net interest-bearing debt (1) up to 2.5 through parent company – to avoid structural times EBITDA

  28. Slide 28: Net debt calculation Q1 12

    Net debt calculation Q1 12 49.4 2.9 14.7 1.9 2.2 27.3 1.5 25.1 3.3 Gross debt Repo Marketable Cash & cash Receivables Receivables Net debt 50% Adjusted Securities equivalents from associates from minority outstanding net debt shareholders hybrid due 3005 28

  29. Slide 29: Investments

    Investments Investments in Q1 12 Main gross investments in Q1 12 Cash flow from investing activities -10.0bn Wind activities: DKK 3.7bn Purchase of securities (add back) 7.7bn  Walney DKK 1.5bn Transactions with non-controlling interest -0.0bn  London Array: DKK 0.9bn Loans to jointly controlled e

  30. Slide 30: Larger decided construction projects

    Larger decided construction projects Larger projects with production start in 2012-2015 Country MW (1) Commercial Own share Announced Spent Project Type of project operation date (2) of project capex (3) capex (4) Sea Installer 1 Installation vessel n.a. n.a. 2012 51% USD 70m USD 51m London Array(5)

DONG Energy — Q1 2012 Earnings Presentation on 6ix