Paramount Gold Nevada Corp. · AMEX:PZG
Paramount Gold Nevada — Investor Presentation (November 2017)
25 slides from Paramount Gold Nevada's investor presentation, Nov 29, 2017
Slide 1: Paramount Gold Nevada - November 2017
NYSE American: PZG NOVEMBER 2017 Exhibit 99.1
Slide 2: Forward-looking statements and cautionary note
This Presentation contains “forward-looking statements” within the meaning of applicable securities laws relating to Paramount Gold Nevada Corp. (“Paramount”, “we”, “us”, “our”, or the “Company”) which represent our current expectations or beliefs including, but not limited to, statements concerning
Slide 3: Gold Price, Project, Geo/Political, Company
paramountnevada.com | @ParamountNV 1/1000 Gold Price Project Geo/Political Company
Slide 4: paramountnevada.com | NYSE American: PZG
paramountnevada.com | NYSE American: PZG
Slide 5: Project: Grassroots, Known Deposits
paramountnevada.com | NYSE American: PZG PROJECT Grassroots Known Deposits
Slide 6: Location
paramountnevada.com | NYSE American: PZG LOCATION
Slide 7: Grassy Mountain, Eastern Oregon
paramountnevada.com | NYSE American: PZG GRASSY MOUNTAIN EASTERN, OREGON
Slide 8: Permitting in Oregon
paramountnevada.com | @ParamountNV PERMITTING IN OREGON 1991 NEWMONT 1994 REFERENEDUM 2016 PARAMOUNT 1986 GRASSY MOUNTAIN
Slide 9: Robust PEA Economics
ROBUST PEA ECONOMICS paramountnevada.com | @ParamountNV *Source: July 2015 NI 43-101 Preliminary Economic Assessment completed by MMC Costs Post Tax Production/yr. $577/ oz (Cash Cost) 53K ozs Au 82K ozs Ag $880/ oz (AISC) NPV $72M IRR 27% Capital Underground Mine $120 M 1,000 tpd Mill 9yr. Mine lif
Slide 10: Grassy Deposit
GRASSY DEPOSIT ™ HIGER GRADE LOWER GRADE
Slide 11: Mineralized Material (M&I)
MINERALIZED MATERIAL (M&I) paramountnevada.com | @ParamountNV Tonnes (000’s) Au Grade (g/T) Au Ounces Ag Grade (g/T) Ag Ounces PEA UG Resource 3,245 5.32 504,000 8.92 843,200 PEA Open Pit Resource 65,447 0.62 1,149,000 2.16 4,133,300 Global Resource 68,693 0.82 1,653,000 2.25 4,976,500 5.32
Slide 12: Key Economic Drivers
paramountnevada.com | @ParamountNV KEY ECONOMIC DRIVERS 5.32g/T Au $200/T 95% Gold recovery
Slide 13: Pre Feasibility Study
paramountnevada.com | @ParamountNV PRE FEASIBILITY STUDY Reduce Capex by $20 to 30 million Production Rate Trade-off analysis maximizing rate of return Convert M&I resources to reserves Necessary input for State permit application
Slide 14: Filed Mine Plan of Operation
paramountnevada.com | @ParamountNV FILED MINE PLAN OF OPERATION Deposit
Slide 15: Exploration Upside Confirmed by Historical Drilling
EXPLORATION UPSIDE CONFIRMED BY HISTORICAL DRILLING Wally-Wood
Slide 16: Exploration Upside: Grassy, Wally, Wood
paramountnevada.com | @ParamountNV EXPLORATION UPSIDE Grassy Wally - Wood
Slide 17: Advancing Grassy
paramountnevada.com | NYSE American: PZG ADVANCING GRASSY BLM (EIS) State Permit Application Q3 2017 PFS Q1 2018 H12018 Exploration H1 2018
Slide 18: The Sleeper Gold - Nevada, Former High Grade Producer
paramountnevada.com | @ParamountNV THE SLEEPER GOLD - NEVADA FORMER HIGH GRADE PRODUCER 1.7 MILLION OUNCES AVERAGE HEAD GRADE of approx. 7 g/t GOLD
Slide 19: The Sleeper Gold Project
THE SLEEPER GOLD PROJECT paramountnevada.com | @ParamountNV Tonnes (000’s) Gold Grade (g/T) Gold (000’s of ounces) Measured 209,464 0.35 2,354 Indicated 87,662 0.28 789 M&I 297,126 0.33 3,143 Inferred 148,844 0.31 1,488 Additional silver M&I resource of 29 M Ounces
Slide 20: PEA Economics
PEA ECONOMICS paramountnevada.com | @ParamountNV Mining Costs NPV at 10% Production $529/ oz (Cash Cost) $869/ oz (AISC) IRR-20% Metal Prices $1,250 Au $16 Ag 83K ozs Ag 84K ozs Au $72 MILLION Capital Open Pit – HL Operation Au Recovery 73.6% $175 M 30,000 tpd 9yr. Mine life
Slide 21: Exploration Upside
paramountnevada.com | @ParamountNV EXPLORATION UPSIDE PZG now controls 2,500 unpatented lode mining claims 50,000 acres 20,000 hectares Newmont
Slide 22: Sleeper: New Targets
paramountnevada.com | @ParamountNV SLEEPER: NEW TARGETS GRAVITY TARGETS Five Priority Targets along 17 km (>10 mi)
Slide 23: Strong Shareholder Base
paramountnevada.com | NYSE American: PZG STRONG SHAREHOLDER BASE FCMI SEABRIDGE GOLD 30% MANAGEMENT
Slide 24: Summary
SUMMARY paramountnevada.com | @ParamountNV PROJECTS THAT WORK TODAY NEAR TERM PERMITTING CATALYST 5.1 MILLION OUNCES OF GOLD EQ. (M&I) EXCELLENT EXPLORATION POTENTIAL
Slide 25: paramountnevada.com | @ParamountNV NYSE American: PZG
paramountnevada.com | @ParamountNV NYSE American: PZG
Paramount Gold Nevada — Investor Presentation (November 2017) on 6ix