Paramount Gold Nevada Corp. · AMEX:PZG

Paramount Gold Nevada — Investor Presentation (November 2017)

25 slides from Paramount Gold Nevada's investor presentation, Nov 29, 2017

  1. Slide 1: Paramount Gold Nevada - November 2017

    NYSE American: PZG NOVEMBER 2017 Exhibit 99.1

  2. Slide 2: Forward-looking statements and cautionary note

    This Presentation contains “forward-looking statements” within the meaning of applicable securities laws relating to Paramount Gold Nevada Corp. (“Paramount”, “we”, “us”, “our”, or the “Company”) which represent our current expectations or beliefs including, but not limited to, statements concerning

  3. Slide 3: Gold Price, Project, Geo/Political, Company

    paramountnevada.com | @ParamountNV 1/1000 Gold Price Project Geo/Political Company

  4. Slide 4: paramountnevada.com | NYSE American: PZG

    paramountnevada.com | NYSE American: PZG

  5. Slide 5: Project: Grassroots, Known Deposits

    paramountnevada.com | NYSE American: PZG PROJECT Grassroots Known Deposits

  6. Slide 6: Location

    paramountnevada.com | NYSE American: PZG LOCATION

  7. Slide 7: Grassy Mountain, Eastern Oregon

    paramountnevada.com | NYSE American: PZG GRASSY MOUNTAIN EASTERN, OREGON

  8. Slide 8: Permitting in Oregon

    paramountnevada.com | @ParamountNV PERMITTING IN OREGON 1991 NEWMONT 1994 REFERENEDUM 2016 PARAMOUNT 1986 GRASSY MOUNTAIN

  9. Slide 9: Robust PEA Economics

    ROBUST PEA ECONOMICS paramountnevada.com | @ParamountNV *Source: July 2015 NI 43-101 Preliminary Economic Assessment completed by MMC Costs Post Tax Production/yr. $577/ oz (Cash Cost) 53K ozs Au 82K ozs Ag $880/ oz (AISC) NPV $72M IRR 27% Capital Underground Mine $120 M 1,000 tpd Mill 9yr. Mine lif

  10. Slide 10: Grassy Deposit

    GRASSY DEPOSIT ™ HIGER GRADE LOWER GRADE

  11. Slide 11: Mineralized Material (M&I)

    MINERALIZED MATERIAL (M&I) paramountnevada.com | @ParamountNV Tonnes (000’s) Au Grade (g/T) Au Ounces Ag Grade (g/T) Ag Ounces PEA UG Resource 3,245 5.32 504,000 8.92 843,200 PEA Open Pit Resource 65,447 0.62 1,149,000 2.16 4,133,300 Global Resource 68,693 0.82 1,653,000 2.25 4,976,500 5.32

  12. Slide 12: Key Economic Drivers

    paramountnevada.com | @ParamountNV KEY ECONOMIC DRIVERS 5.32g/T Au $200/T 95% Gold recovery

  13. Slide 13: Pre Feasibility Study

    paramountnevada.com | @ParamountNV PRE FEASIBILITY STUDY Reduce Capex by $20 to 30 million Production Rate Trade-off analysis maximizing rate of return Convert M&I resources to reserves Necessary input for State permit application

  14. Slide 14: Filed Mine Plan of Operation

    paramountnevada.com | @ParamountNV FILED MINE PLAN OF OPERATION Deposit

  15. Slide 15: Exploration Upside Confirmed by Historical Drilling

    EXPLORATION UPSIDE CONFIRMED BY HISTORICAL DRILLING Wally-Wood

  16. Slide 16: Exploration Upside: Grassy, Wally, Wood

    paramountnevada.com | @ParamountNV EXPLORATION UPSIDE Grassy Wally - Wood

  17. Slide 17: Advancing Grassy

    paramountnevada.com | NYSE American: PZG ADVANCING GRASSY BLM (EIS) State Permit Application Q3 2017 PFS Q1 2018 H12018 Exploration H1 2018

  18. Slide 18: The Sleeper Gold - Nevada, Former High Grade Producer

    paramountnevada.com | @ParamountNV THE SLEEPER GOLD - NEVADA FORMER HIGH GRADE PRODUCER 1.7 MILLION OUNCES AVERAGE HEAD GRADE of approx. 7 g/t GOLD

  19. Slide 19: The Sleeper Gold Project

    THE SLEEPER GOLD PROJECT paramountnevada.com | @ParamountNV Tonnes (000’s) Gold Grade (g/T) Gold (000’s of ounces) Measured 209,464 0.35 2,354 Indicated 87,662 0.28 789 M&I 297,126 0.33 3,143 Inferred 148,844 0.31 1,488 Additional silver M&I resource of 29 M Ounces

  20. Slide 20: PEA Economics

    PEA ECONOMICS paramountnevada.com | @ParamountNV Mining Costs NPV at 10% Production $529/ oz (Cash Cost) $869/ oz (AISC) IRR-20% Metal Prices $1,250 Au $16 Ag 83K ozs Ag 84K ozs Au $72 MILLION Capital Open Pit – HL Operation Au Recovery 73.6% $175 M 30,000 tpd 9yr. Mine life

  21. Slide 21: Exploration Upside

    paramountnevada.com | @ParamountNV EXPLORATION UPSIDE PZG now controls 2,500 unpatented lode mining claims 50,000 acres 20,000 hectares Newmont

  22. Slide 22: Sleeper: New Targets

    paramountnevada.com | @ParamountNV SLEEPER: NEW TARGETS GRAVITY TARGETS Five Priority Targets along 17 km (>10 mi)

  23. Slide 23: Strong Shareholder Base

    paramountnevada.com | NYSE American: PZG STRONG SHAREHOLDER BASE FCMI SEABRIDGE GOLD 30% MANAGEMENT

  24. Slide 24: Summary

    SUMMARY paramountnevada.com | @ParamountNV PROJECTS THAT WORK TODAY NEAR TERM PERMITTING CATALYST 5.1 MILLION OUNCES OF GOLD EQ. (M&I) EXCELLENT EXPLORATION POTENTIAL

  25. Slide 25: paramountnevada.com | @ParamountNV NYSE American: PZG

    paramountnevada.com | @ParamountNV NYSE American: PZG

Paramount Gold Nevada — Investor Presentation (November 2017) on 6ix