Slide 1: Amulsar Gold Project Corporate Presentation
Amulsar Gold Project Mining Right Approved Engineering for Value Enhancements High Cash Flow, Sustainable Development Opportunity Corporate Presentation September 2015 Lydianinternational.co.uk | TSX:LYD
Slide 2: Cautionary Statements
Cautionary Statements Forward Looking Statements & Nature of Mineral Reserves/Resources Forward Looking Statements Certain information contained in this document, including any information relating to Amulsar's expected future performance is "forward looking". All statements, other than statements o
Slide 3: Lydian's Amulsar Gold Project
Lydian’s Amulsar Gold Project Project Overview Lydian International is an Technical Report - May 2015 Haul Road Gradient Improvement emerging gold developer. Its 100% owned Amulsar Scale Confirmed recoverable gold of 2.1 million ounces Gold Project will be Maintained 10 year mine life Armenia’s larg
Slide 4: Amulsar Gold Project
Amulsar Gold Project Large Scale Oxide Deposit Gold Silver Contained Contained Tonnes Grade Grade Gold Silver (Millions) (g/t) (g/t) (Millions) (Millions) Mineral Resources Measured + Indicated 122.4 0.77 3.5 3.0 13.9 Inferred 106.2 0.59 2.6 2.0 9.0 Mineral Reserves Proven + Probable 100.4 0.78 3.7
Slide 5: Republic of Armenia
Republic of Armenia Overview Borders: Azerbaijan, Turkey, Georgia, Iran Country Size: 30,000 sq km Capital: Yerevan, population of 1.2 million Government: President: Serj Sargsyan (elected in 2013, second term) Prime Minister: Hovik Abrahamyan Population: 3 million Languages: Armenian 97.7%, Yazidi
Slide 6: Amulsar's Path to Value
Amulsar’s Path to Value Position Amulsar for Construction or Strategic Alternatives Area Complete In Progress Value Optimization Mining: Haul Road Gradient Mine plan and haul routes Crushing plant re-design for 19 mm crush Conveying route HLF/Processing consolidation Site layout Land Acquisition Pha
Slide 7: Value Engineering
Value Engineering Improving Economics, Constructability, Operability and Sustainability Financial Implication Area 2015 Technical Report Assumptions Value Engineering Results Initial CapEx OpEx Mining 6.5% maximum road gradient 10% maximum road gradient, updated fuel price $3M ↓ $83M ↓ Shorter haul
Slide 8: Value Engineering
Value Engineering Improving Economics, Constructability, Operability and Sustainability Financial Implication Area 2015 Technical Report Assumptions Value Engineering Results Initial CapEx OpEx Conveying Elevated, two conveyors with transfer station Single conveyor on grade, up to 15% shorter ↓ ↓ HL
Slide 9: General Arrangement Changes
Amulsar Gold Project General Arrangement Changes 9
Slide 10: Land Acquisition
Land Acquisition Key De-Risking Activity • Required following relocation of HLF from Site 14 • Phases 1 & 2: HLF valley area • Phase 3: Conveyor corridor • Status – Phases 1 & 2: • Started February 2015 • 95% of titles transferred • Continuing negotiations and admin process on open cases; initiating
Slide 11: Environmental & Social Management
Environmental & Social Management Pre-Construction Requirements • ESIA Publication – Performance Standard Requirement • Publish before construction commences (May 2015) • Hold public consultations (Summer 2015) • Baseline Study – Brown Bear (Spring – Fall 2015) • Bear Survey – extensive regional pho
Slide 12: Project Financing
Project Financing Leverage Return, Manage Dilution • Key Considerations • Value engineering critical to reducing overall financing requirement • Maximizing early cash flows supports greater debt capacity • Minimize hedging and loss of upside potential • Challenges • Declining gold price diminishes d
Slide 13: Upside Potential
Upside Potential Sizable Upside Within & Near Reserves Pits Tonnes (Millions) Grade (g/t) Contained Ounces Resource Conversion Strong conversion history In pits - Inferred 30.1 0.57 555,000 Known model limiters Below pits - All categories 58.7 0.69 1,302,000 13
Slide 14: Thank you Q&A
Thank you Q&A Lydianinternational.co.uk | TSX:LYD
Slide 15: Appendix
Appendix Lydianinternational.co.uk | TSX:LYD
Slide 16: Corporate Summary
Corporate Summary Strong Positioning Symbol TSX:LYD Share Capital Shares Outstanding 184.6 million At 30-Jun-15 Stock Options 7.2 million Fully Diluted Shares 191.8 million Market Cap At C$0.30 C$55.4 million Cash At 30-Jun-15 $13.4 million Financing Debt: 30-Jun-15 Nil Off Balance Sheet 3% Royalty
Slide 17: Corporate Summary
Corporate Summary Research Coverage & Top Shareholders Research Coverage Bank of Montreal, Andrew Breichmanas GMP Securities, Oliver Turner Haywood Securities, Tara Hassan National Bank, Shane Nagle RBC Capital Markets, Jonathan Guy Scotiabank, Trevor Turnbull Top Shareholders International Finance
Slide 18: Board of Directors – Realigned in 2014
Board of Directors – Realigned in 2014 Development-Oriented; Independent, Diverse Experience Gordon Wylie (Chair) Non-Executive Director Howard Stevenson President, CEO & Director Member since 2009 32 yrs mining experience Member since 2014 25 yrs global mining experience AngloGold-Ashanti Global Al
Slide 19: Management Team
Management Team Leadership Experience for Development Doug Tobler Chief Financial Officer Didier Fohlen Executive Vice President Since 2014 33 yrs finance, accounting and Since 2012 31 yrs mining & minerals mining experience experience Alacer Gold CFO 15 yrs World Bank Group PwC,Equity & debt market
Slide 20: Armenia and Mining
Armenia and Mining Priority for Foreign Direct Investment • Amulsar will be the largest gold mine in Armenia, up to 1,200 jobs during construction and 650 during operations • Mining in Armenia: • US$320 million invested in exploration and development of the Teghout copper and molybdenum deposit by V
Slide 21: Amulsar Gold Project
Amulsar Gold Project Key Infrastructure Local Communities Resources for supplies, housing, other Dedicated local workforce Transportation Adjacent to existing road & rail routes Sealed highway from Yerevan to site Utilities High tension power lines, substations, fiber optics, gas line & water at sit
Slide 22: Amulsar Gold Project
Amulsar Gold Project Snapshot – May 2015 NI 43-101 Total Gold Production Ozs 2,130,000 Total Silver Production Ozs 3,195,000 Mine Life Years 10 Mining Strip Ratio 2.6 Conventional Open-Pit Processing Nominal Rate Tpa 10,000,000 Gold Grade Gpt 0.78 Gold Recovery % 84.2% Silver Grade Gpt 3.65 Silver R
Slide 23: Amulsar Gold Project
Amulsar Gold Project Snapshot – May 2015 NI 43-101 Economics (Unleveraged at $1,250 gold) Initial Capex In millions $ 420 Sustaining Capex In millions $ 78 All-in Sustaining Cash Costs $ / Oz $ 664 NPV5% In millions $ 347 IRR % 21.7% Royalties & Taxes Structure Newmont Royalty (3% NSR, capped at $20
Slide 24: Capital & Operating Costs
Capital & Operating Costs Feasibility Study: Key Components Capital Costs Operating Costs $/ Ore $ Millions Tonne $/Oz Gold Mining equipment $ 95 Mining $ 6.93 Processing facilities $ 178 Processing $ 3.72 Other $ 40 General & Admin $ 1.38 Total Direct Costs $ 313 Other $ 0.76 Total Cash Costs $ 12.