  1. Slide 1: Is Waterberg the future of the South African Coal Mining Industry?

    Slide 1: Is Waterberg the future of the South African Coal Mining Industry?

    I n v e s t i n g i n A f r i c a n M i n i n g Co n f e r e n c e [Mining Indaba 2005] Wa t e r b e r g t h e f u t u r e o f t h e So u t h A f r i c a n Co a l M i n i n g Indust ry? Dr C J Fauconnier Chief Executive Kumba Resources Limited 8 February 2005 Cape Town, South Africa 1

  2. Slide 2: Waterberg Coalfield

    Slide 2: Waterberg Coalfield

    WATERBERG COALFIELD [Source: Map adapted from Coal Processing Society South Africa] 2

  3. Slide 3: Grootegeluk Mine

    Slide 3: Grootegeluk Mine

    Grootegeluk Mine

  4. Slide 4: Matimba Power Station

    Slide 4: Matimba Power Station

    Matimba Power Station e 4 @@@ KUMBA RESOURCES

  5. Slide 5: Job creation, training and capital investment

    Slide 5: Job creation, training and capital investment

    Job Creation Training and skills development Capital Investment in Mining, Power Generation, Infrastructure Enhance local economic growth Taxes, levies, royalties and other economic contributions Development of secondary industries and SMME opportunities Poverty alleviation 5

  6. Slide 6: Key Focus Areas

    Slide 6: Key Focus Areas

    Zero effluent operations Clean technologies for future power generation Key Focus Areas Rehabilitation Nature Nursery for rehabilitation Conservation Various dust Pollution Supplies water to suppression Prevention the mine, projects Matimba and Sustainable Lephalale Total dust risk < 1 land use GG o

  7. Slide 7: A Comparison of the Waterberg and the Witbank/Highveld Coalfields

    Slide 7: A Comparison of the Waterberg and the Witbank/Highveld Coalfields

    [A Comparison of the Waterberg and the Witbank/Highveld Coalfields] RESERVES ( % ) 35% 65% WITBANK/HIGHVELD COALFIELDS TONNAGE PRODUCED ( % ) 9% WATERBERG COALFIELD NUMBER OF MINES ( % ) 4.3% 91% 95.7% 7

  8. Slide 8: Expansion of electricity generation in the Highveld limited by pollution levels

    Slide 8: Expansion of electricity generation in the Highveld limited by pollution levels

    [Source: Beeld Newspaper (13/10/04)] The expansion of electricity generation in the Highveld will be limited by pollution levels 8

  9. Slide 9: Source: Eskom Interface, 2004

    Slide 9: Source: Eskom Interface, 2004

    [Source: Eskom Interface, Issue 2 of 2004] 9

  10. Slide 10: Massive potential for hydro electricity in the Congo River

    Slide 10: Massive potential for hydro electricity in the Congo River

    Massive potential for hydro electricity (40 000 MWe) in the Congo River INGA BUT Political instability Massive infrastructure needed for electricity generation and distribution High capex Long lead-time Transmission losses Will come to fruition only in 15-20 years from now [Source: Picture adapted f

  11. Slide 11: Expected Coal Production Capacity

    Slide 11: Expected Coal Production Capacity

    EXPECTED COAL PRODUCTION CAPACITY 50 45 40 35 30 Tons (Mtpa) 25 20 15 Coking 10 Steam Eskom 5 0 Current Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 11

  12. Slide 12: Grootegeluk Mine

    Slide 12: Grootegeluk Mine

    } Grootegeluk Mine

  13. Slide 13: This presentation can be downloaded from the Kumba Resources website

    Slide 13: This presentation can be downloaded from the Kumba Resources website

    This presentation can be downloaded from the Kumba Resources web- site: www.kumbaresources.com 13

Source: Internet Archive copy of exxaro.com