Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — South Australia Exploration and Mining Conference 2013

20 slides from Hillgrove Resources's conference presentation, Nov 28, 2013

  1. Slide 1: South Australia Exploration and Mining Conference

    SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013

  2. Slide 2: Assets, Board and Management Team

    ASSETS, BOARD AND MANAGEMENT TEAM Production and cash flow in Australia Bird’s Head project  Kanmantoo Copper Mine (100% owned), South Australia Sumba project Rim-of-Fire exploration in Indonesia  Sumba gold project (80% owned)  Bird’s Head copper/gold project (80% owned) Kanmantoo Hillgrove Boar

  3. Slide 3: Kanmantoo Copper Mine and Exploration Area

    KANMANTOO COPPER MINE AND EXPLORATION AREA  100%-owned  55km from Adelaide, South Australia Exploration  Mining Lease is within 500km2 Exploration Area EL4401 License  Exploration potential considered high Kanmantoo  The project enjoys commensurate capital Copper Mine cost advantages Wheal Elle

  4. Slide 4: The Mine as an Exploration Tool

    THE MINE AS AN EXPLORATION TOOL  Mine Construction and Operation are critical to exploration  Feasibility to operation  Safety & Community  Quality  Efficiency  Costs 4

  5. Slide 5: Feasibility to Operation

    FEASIBILITY TO OPERATION  ABARE stated that at the end of October 2011, 102 Projects underway with A$231 Billion of expenditure  Pressure on EPCMs and Owners  Significant scale  Unprecedented level of complexity  Blowouts and over runs aren’t new  Between 1965 and 1981 the average cost over ru

  6. Slide 6: Safety and Community

    SAFETY AND COMMUNITY SAFETY COMMUNITY  Operational commencement presents new challenges and expectation increase with time 6

  7. Slide 7: Quality

    QUALITY RESOURCE AND RESERVE  Important parameters are realistic and achievable GEOTECHNICAL  Blasting and vibration can have serious impacts on stability  Bench and ground support effectiveness GRADE CONTROL  Further refinement to Reserve EFFECTIVE EXTRACTION  Maximum recovery  Minimum diluti

  8. Slide 8: Efficiency

    EFFICIENCY BASIC BUT BULLETPROOF  Do the absolute minimum  Keep everything simple  Plan effectively  Maximise throughput  Minimise cost 8

  9. Slide 9: Costs

    COSTS On Time and Scope Project Low Cost Operation Longer life Increased Exploration Options 9

  10. Slide 10: 3Q and Company Highlights – Mining Services

    3Q AND COMPANY HIGHLIGHTS – MINING SERVICES  Complete change out of the mining services  Supply, Maintain and Repair Contract (SMARC)  Recruitment of Hillgrove employees and supervisors  Specialised Drillers  Explosives Supply  Focus on safety, quality, efficiency and costs 10

  11. Slide 11: Total Tonnes of Ore Mined

    TOTAL TONNES OF ORE MINED Monthly Mined Bank Cubic Metres (bcm) 700,000 600,000 500,000 400,000 300,000 200,000 100,000 Q1-13 (Feb-Apr) Q2-13 (May-Jul) Aug-13 Sep-13 Oct-13  Mining rate impacted by weather and changeover  New fleet operational by 7 August, ramping to nominal capacity by mid-Septem

  12. Slide 12: Ore Milled and Feed Grade

    ORE MILLED AND FEED GRADE 0.80 Milled Tonnes 756,129 800,000 Feed Grade 708,280 719,986 0.70 648,055 700,000 595,016 0.60 572,289 600,000 Tonnes Copper (Dry) 488,130 0.50 500,000 0.40 400,000 0.30 300,000 0.20 200,000 0.10 100,000 ‐ 0 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014  Mill co

  13. Slide 13: Contained Copper Rates Increased

    CONTAINED COPPER RATES INCREASED  Kanmantoo produced 4,306 tonnes of copper in concentrate  Guidance for FY14 on target for 16,500 to 18,000t Cu 13

  14. Slide 14: Processing Costs Reduced

    PROCESSING COSTS REDUCED Quarterly Processing Unit Costs Including Mobile Crushing ($/t Milled) 16.00 14.00 12.00 10.00 Costs ($/t) 8.00 6.00 4.00 2.00 ‐ Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 14

  15. Slide 15: Life of Mine and Reserve

    LIFE OF MINE AND RESERVE  LOM plan to encompass Note: Rodda will include Emily immediate resource areas – Star; and Giant will include Giles, Lean and Valentine targeting 10 year life of operations  Mining performance currently focussed on Kavanagh pit, with the pit now accessing the higher grade

  16. Slide 16: Mining Status – Kavanagh and Giant

    MINING STATUS – KAVANAGH AND GIANT Cross Section (6115000N Looking North) Reserve 2013 Model Blocks Shown > 0.2% Cu KAVANAGH GIANT EOM Survey July 2013 16

  17. Slide 17: Global Mineral Reserve Estimate at End February 2013

    GLOBAL MINERAL RESERVE ESTIMATE AT END FEBRUARY 2013 Kanmantoo Global Mineral Reserve Estimate at End February 2013 JORC 2012 Tonnage Cu Au Ag Classification (Mt) (%) (g/t) (g/t) Proven 2.5 0.77 0.08 1.7 In Situ Reserve Probable 18.2 0.72 0.20 2.0 20.7 0.73 0.18 1.9 Long Term Stockpiles Proven 1.4 0

  18. Slide 18: New 2012 JORC Mineral Reserve

    NEW 2012 JORC MINERAL RESERVE  New Ore Reserve shows an increase in both Reserve confidence and contained metal 18

  19. Slide 19: Disclaimer - Important Notice

    DISCLAIMER - IMPORTANT NOTICE No representation or warranty is or will be made by any person (including Hillgrove Resources Limited ACN 004 297 116 (“Hillgrove”, “HGO”, or the “Company”) and its officers, directors, employees, advisers and agents) in relation to the accuracy or completeness of all o

  20. Slide 20: Competent Person Statements

    COMPETENT PERSON STATEMENTS Kanmantoo Global Mineral Resource Estimate at End February 2013 ABOUT HILLGROVE JORC 2012 Tonnage Cu Au Ag Hillgrove Resources is an Australian mining Classification (Mt) (%) (g/t) (g/t) company listed on the Australian Securities Measured 2.63 0.88 0.10 1.95 In Situ Reso