  1. Slide 1: Building an Australian Base Metals Business

    ASX: VXR Building an Australian Highlights NPV8 AUD 472 MM Base Metals Business Free Cash Flow AUD 818 MM Ore Reserve 42% Increase in Cu Metal Reduced Infrastructure Capex 146 MM Increased production rate to 1.25MMtpa Life of Mine 12 Years AJ SAVERIMUTTO | Managing Director

  2. Slide 2: Important information & Disclaimer

    Important information & Disclaimer Cautionary Statement The information contained in this document (“Presentation”) has been prepared by Venturex Resources Limited (“Company”). This Presentation is being used as a presenter’s aid with summarised information. See Venturex’s other and periodic disclos

  3. Slide 3: We’re building an Australian base metals business

    Venturex Resources is a base metals developer based in the Pilbara, Western Australia. Venturex Resources has a large, quality asset base and is well positioned for production and growth in global copper and zinc markets. We’re building an Australian base metals business. 3

  4. Slide 4: Corporate Snapshot | Board & Management Team

    Corporate Snapshot | Board & Management Team Board Management Anthony (Tony) Kiernan Trevor Hart Non-Executive Chairman CFO & Company Secretary Former lawyer with 35 years listed company CPA with over 20 years senior experience in management experience listed companies Ajanth (AJ) Saverimutto Alex B

  5. Slide 5: Corporate Snapshot | Metrics & Shareholders

    Corporate Snapshot | Metrics & Shareholders Key Metrics Top 3 shareholders hold ~42% of shares on issue as of 1 Oct 2018 Share price ($AUD) 0.18 Shares on Issue (M) 240 Market capitalisation (M$AUD) 43 Top 5 Shareholders % Northern Star Resources Ltd 19.0 Regent Pacific Group Ltd 16.3 Precision Oppo

  6. Slide 6: Investment Highlights | Timing, Profitability, Growth

    Investment Highlights | Timing, Profitability, Growth Market Timing Project & Profitability Poised for Growth Copper and Zinc prices up over A robust and profitable project DFS Complete last 12 months High margin project with open pit Funding in Progress Low LME stockpiles and underground operations

  7. Slide 7: Market Timing

    Market Timing

  8. Slide 8: Diminishing Supply | Market Timing

    Diminishing Supply | Market Timing Supply shortfall expected by 2020 o Resource depletion on current projects o Grade decline o Lack of investment in new projects o Falling copper inventories o Chinas Belt and Road (~7% increase in Demand per year) 4Mt SOURCE: Wood Mackenzie SOURCE: Bloomberg, LME,

  9. Slide 9: Strong Demand from EVs | Market Timing

    Strong Demand from EVs | Market Timing Electric Vehicles (EVs) o Electric Vehicles (EVs) are a major growth market o An average EV needs 4 x the copper of a conventional medium sized car o The EV fleet will be 230 million in 2035 and 750 million Kg of Copper by 2050 equivalent to half the global fle

  10. Slide 10: Project & Profitability

    Project & Profitability

  11. Slide 11: Australian Mines & Metal Endowment

    Australian Mines & Metal Endowment | Project & Profitability CuEq. Grade (%) Resource (Mt) SOURCE : VXR, MMG, SLR, MLS, ERL, MRP, SYV, HRR, RVR, IGO, NQ (NEX), THX, SFR, HOR, G1A Copper equivalent calculated at metal price assumptions: Cu = USD6450/t, Zn = USD2,535/t, Pb = USD2,050/t, Au = USD1,200/

  12. Slide 12: DFS – Financial Results

    DFS – Financial Results | Project & Profitability o Excellent project financials o NPV8 = AUD 472 MM o IRR = 51% o Free Cash Flow = AUD 818 MM o Average cash flow of ~AUD 80 MM per year NPV8 o Infrastructure Capital cost reduction to AUD146MM (including contingency) o Increased plant capacity to 1.2

  13. Slide 13: Project Design

    Project Design | Project & Profitability Open Pit Design o Optimised open pit design o Strip ratio from 11:1 to 8:1 o Geotechnically optimised Underground Design o Bulk mining method (Modified – SLC) o Low capital development requirement o Low cost extraction methodology Metallurgy o 1.25Mtpa plant

  14. Slide 14: DFS vs VES

    DFS vs VES | Project & Profitability Definitive Feasibility Study (2018)1 Metric Value Engineering Study (2017)2 472 NPV8 (AUD M) 338 51 IRR (%) 52 2,625 Gross Revenue (AUD M) 2,400 818 Free Cash Flow (AUD M) 601 169 (15 months) Capex (AUD M) 167 (12 months) 12.6 Ore Inventory (Mt) 11.7 1.25 Product

  15. Slide 15: Operating Costs

    Operating Costs | Project & Profitability A Cornerstone Asset LOM Costs Output Unit Value NPV 8% AUD M 472 Free Cash Flow AUD M 818 Revenue AUD/t 209 Operating Cost Per Tonne AUD/t 122 Capital Cost per Tonne AUD/t 22 Total Cost per Tonne AUD/t 144 Margin AUD/t 65 Mining Area Tonnes (Mt) Cu (%) Cu Me

  16. Slide 16: Production Profile

    Production Profile | Project & Profitability Processing Schedule – Tonnes, Grades & Mining Location 16

  17. Slide 17: Cash Flow

    Cash Flow | Project & Profitability Project Undiscounted Cash Flow Waterfall 17

  18. Slide 18: Payback

    Cash Flow | Project & Profitability Project Cash Flow – Periodic & Cumulative Peak Cash Draw Payback 18

  19. Slide 19: Schedule to Production

    Schedule to Production | Project & Profitability 19

  20. Slide 20: Poised For Growth

    Poised For Growth

  21. Slide 21: Panorama Exploration | Poised for Growth

    Panorama Exploration | Poised for Growth o +27km VMS belt o Potential for further look alike deposits o Surface gossan identified at numerous prospects o Drill program to follow 21

  22. Slide 22: Panorama Trend | Poised for Growth

    Panorama Trend | Poised for Growth 22

  23. Slide 23: Value Proposition | Poised for Growth

    Value Proposition | Poised for Growth Value Markets Shareholders Exploration Strong Vision Cornerstone assets Strong projections Support of major 27 km of ground Robust strategy for Cu and Zn shareholders similar to Sulphur Excellent economics markets Northern Star Springs Strong vision Resources De

  24. Slide 24: Building an Australian base metals business

    Building an Australian base metals business

  25. Slide 25: Thank you

    Thank you AJ SAVERIMUTTO | Managing Director Building an Australian base metals business. Registered Office: Level 2, 91 Havelock Street, West Perth, WA 6005 T: + 61 8 6389 7400 F: + 61 8 9463 7836 admin@venturexresources.com Media: Nicholas Read / Read Corporate Ph: +61 8 9388 1474 Email: info@read