Talamore Mining Corp. · TSX:TALA
Talamore Mining — Investor Presentation (September 2026)
32 slides from Talamore Mining's investor presentation, September 2026
Slide 1: Corporate Presentation
Corporate Click to edit Master title Presentation style September 2026 YUKON’S NEXT GOLD PRODUCER TSX: TALA OTCQB: TALMF talamoremining.com
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT • Certain of the statements made and information provided by Talamore Mining Corporation (“Talamore” or the “Company”) in this presentation are forward-looking statements or information within the meaning of applicable Canadian securities laws. Often, these forward-looking
Slide 3: Coffee Gold Project, Yukon, Canada
Coffee Gold Project Yukon, Canada Click to edit Master title style We respectfully acknowledge the First Nations on whose Traditional Territories the Coffee Project is situated.
Slide 4: Investment Thesis: Coffee Gold Project
INVESTMENT THESIS Coffee Gold Project A High-Grade Oxide Gold Project in Canada, Well Advanced In The Permitting Process SIGNIFICANT M+I RESOURCE BEST-IN-CLASS LEADERSHIP COMPELLING PEA ECONOMICS WITH EXTENSIVE 2026 EXPLORATION AND EXCELLENT UPSIDE POTENTIAL AND SHAREHOLDER BASE FEASIBILITY STUDY UN
Slide 5: A Clear Path To Production
COFFEE GOLD PROJECT A Clear Path To Production Advanced Stage Project • Time to production significantly reduced by over $300M of investment by previous owners • Feasibility level work completed for all areas; 616 km drilled, extensive infrastructure and equipment onsite • Environmental Assessment c
Slide 6: Strong First Nations Support & Advanced Permitting
COFFEE GOLD PROJECT Strong First Nations Support & Advanced Permitting First Nations • Collaboration Agreement in place with Tr’ondëk Hwëch’in (TH) First Nation since 2018 • Impact and Benefits Agreement signed with White River (WRFN) First Nation in 2021 • Established relationships with Selkirk Fir
Slide 7: Robust High Grade Oxide Resource With Significant Upside
COFFEE GOLD PROJECT Robust High Grade Oxide Resource 2025 MRE block model long section – Supremo With Significant Upside Looking northwest / Section thickness = 200m / Block filter: MI&I Mineral Resource Estimate (0.18 g/t cut-off grade) TONNAGE GOLD GRADE GOLD CONTAINED (kt) (g/t) (koz) Measured 1,
Slide 8: Best In Class Heap Leach Project
COFFEE GOLD PROJECT Best In Class Heap Leach Project 3.0 Moz M+I resource places Coffee in the top-10 largest heap-leach development projects • 1.15 g/t gold grade makes Coffee one of the highest-grade HL projects globally Robust deposit with high-grade sensitivity (0.4 g/t cut-off) • 2.8 Moz M+I at
Slide 9: Coffee Gold Project PEA Highlights
Coffee Gold Project PEA Highlights US$2.2B | US$3.7B 217 Koz 2.8 Moz 13 yr AFTER TAX NPV5% ANNUAL AVERAGE (LOM) RECOVERED GOLD (LOM) MINE LIFE Consensus | Spot $5,000/oz 43.5% | 62.1% $1,386/oz C$634M | C$998M AFTER TAX IRR AISC (US$/oz) CAPITAL COSTS Consensus | Spot $5,000/oz Direct Construction C
Slide 10: High Quality Open-Pit Heap Leach Project
COFFEE GOLD PEA High Quality Open-Pit Heap Leach Project Operationally Straightforward Benefits from High Grade & Excellent Heap Leach Recoveries • Straightforward open-pit, truck & shovel mine • Modest power requirements for 2-stage crushing & ADR plant • Maximum pit depth of ~250 m • No agglomerat
Slide 11: PEA Summary
COFFEE GOLD PEA PEA Summary Production Metrics Operating Costs Capital Costs LOM TOTAL C$/TONNE C$M Ore Mined Mt 90.5 Mining $30.30 Direct Construction Capital 563.0 Gold Grade g/t 1.25 Processing $6.94 Northern Access Route 71.3 Contained Gold kozs 3,644 G&A and Site Services $8.22 Total Direct Cap
Slide 12: Production Profile
COFFEE GOLD PEA Production Profile Production (Au koz) % Inferred FIRST 5 FULL YEARS LIFE-OF-MINE 350.0 100% AVERAGE AVERAGE Numerous exploration targets on property provide opportunity to backfill profile 90% Production Koz/year 249 217 300.0 80% 250.0 70% • PEA includes resources in the Inferred c
Slide 13: Competitive Cost Profile
COFFEE GOLD PEA Competitive Cost Profile 2024 Global All-in Sustaining Cost Curve (US$/oz) $3,500 $3,000 Timmins 1st Full 5 Yrs. LOM $2,500 Eleonore Young-Davidson Macassa $2,000 Island $1,500 Musselwhite Hemlo $1,000 Porcupine Lamaque Meliadine Brucejack $500 Goldex Meadowbank $0 0 25 50 75 100 Cof
Slide 14: Rapid Payback
COFFEE GOLD PEA Rapid Payback PAYBACK INITIAL CAPITAL AVERAGE ANNUAL CASH FLOW 1.97 Yrs at Cons. C$998M ~C$453M at Consensus Prices | ~C$706M at Spot 1.46 Yrs at Spot $1,500 $10,000 C$8.0B Cumulative Cash Flow After-Tax (C$M) $8,000 Annual Cash Flow After-Tax (C$M) $1,000 C$4.7B $6,000 $4,000 $500 $
Slide 15: Strong Economics
COFFEE GOLD PEA Strong Economics CONSENSUS PRICES SPOT US$5,000/OZ NPV(5%) & IRR After-tax NPV(5%) IRR NPV5% (pre-tax) US$B 3.5 6.0 $5,000 100% NPV5% (after-tax) US$B 2.2 3.7 $4,500 90% IRR (after-tax) % 43.5 62.1 $4,000 80% Payback Years 1.97 1.46 After-Tax NPV (5%) - $US millions $3,500 70% $3,000
Slide 16: Exploration Potential & Plans
COFFEE GOLD PROJECT Exploration Potential & Plans Regional Exploration Targets Near-Mine Targets Coffee Deposit % Cu in Soil ppb Au in Soil g/t Ag in Soil Supremo Extension >0.02 >180 >1.00 0.01-0.02 60-180 0.75-1.00 0.005 - 0.010 30-60 0.50-0.75 20 km Sugar Target 5 km Regional Potential – Long-Ter
Slide 17: Talamore Ranked Against Producing Assets in Canada
COFFEE GOLD PROJECT Talamore Ranked Against Producing CONSENSUS NAV Assets in Canada – 2026E Production (US$M) Eskay Creek (28E) 341 $4,277 Island Gold 319 $9,914 Cote 297 $5,836 Macassa 296 $3,111 LaRonde 291 $4,047 Greenstone 284 $5,004 Blackwater 282 $7,699 Brucejack 273 $2,789 Rainy River 264 $1
Slide 18: Attractive Valuation: P/NAV Benchmarking
P/NAV BENCHMARKING Attractive Valuation P/NAV Near-term valuation re- 1.60 1.40 1.20 rating potential as 1.00 company transitions 0.80 0.60 towards production 0.40 Talamore 0.20 0.00 Senior Producers Intermediate Junior Producers Large Cap Talamore Producers Development & Explorers 18 Notes: P/NAV m
Slide 19: Pathway To Production
COFFEE GOLD PROJECT Pathway To Production 2026 2027 2028 2029 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Exploration RC/diamond drilling RC/diamond drilling RC/diamond drilling RC/diamond drilling PEA Engineering Feasibility study Road permits Permitting Class WUL Quartz mining license Road con
Slide 20: Financing Package
Financing Package Financing Package Summary Early Warrant Exercise • Financing package comprised of a combination of debt and equity: • 34.8M existing warrants issued as part of acquisition financing • C$149.5M brokered offering of common shares • $2.50 exercise price & 5-year term to October 9, 203
Slide 21: Capital Structure
Capital Structure Capitalization Share price (September 18, 2026) C$ 9.70 Management & Basic Shares outstanding M 160.1 Board 7% Others Basic Market capitalization C$M 1,553 20% Trinity Capital Partners Options/RSUs M 10.7 8% Warrants outstanding (avg. C$2.53) M 35.2 Fully diluted shares outstanding
Slide 22: Solid leadership backed by an experienced board
PROVEN LEADERSHIP Solid leadership backed by an experienced board. Tim Warman Charlie Ronkos Jason O'Connell Denis Flood CEO and Director EVP Exploration Chief Financial Officer Chief Operating Officer • Highly successful Mine Operations and • Track record of Exploration Success, involved • Track re
Slide 23: Yukon's next gold producer
Yukon’s next gold 3200 - 733 Seymour Street Vancouver, BC V6B 0S6 Canada Click to edit Master title producer. www.talamoremining.com info@talamoremining.com style 1 (604) 646 1890 Toll Free 1 (844) 896 8192
Slide 24: Appendix
Click to edit Master title Appendix style
Slide 25: Forward Looking Statement: Qualified Persons and Non-GAAP Measures
FORWARD LOOKING STATEMENT Qualified Persons and Technical Disclosure • The scientific and technical information contained in this presentation was reviewed by Denis Flood , Talamore’s COO and a “Qualified Person” under National Instrument 43-101. Scientific and technical information herein has been
Slide 26: A Transformative Acquisition
COFFEE GOLD PROJECT A Transformative Acquisition Attractive acquisition metrics – Cost of US$50/oz • US$150 million total – US$10M cash, US$40M equity, and 3% NSR, re- purchasable for US$100M until 1-year after commercial production • Newmont became ~30% shareholder (now 19.9%) and can appoint one b
Slide 27: History
COFFEE GOLD PROJECT History Kaminak (2011 – 2016) Goldcorp (2016 – 2019) Newmont (2019 – 2025) • 2009-2015, Kaminak drilled 1,684 holes for a total of • Goldcorp acquired Kaminak in 2016 for total consideration • Positive Yukon Environmental Socioeconomic Assessment 279,826m of C$520M Board decision
Slide 28: Yukon Mining Infrastructure
COFFEE GOLD PROJECT Yukon Mining Infrastructure Yukon Resource Gateway Project • $468-million of infrastructure upgrades for up to 650 kilometres of existing roads in areas with high mineral potential and active mining in the Yukon • Initial proposed project overlaps with Northern Access Route to ac
Slide 29: Significant Value Creation From FS to Production
COFFEE GOLD PROJECT Significant Value Creation From FS to Production FEASIBILITY STUDY ANNOUNCED CONSTRUCTION DECISION COMMERCIAL PRODUCTION US$1,440M US$1,752M +22% US$4,446M +154% Blackwater (September 2021) (March 2023) (May 2025) US$361M US$339M -6% US$2,633M +677% Côté (November 2018) (July 202
Slide 30: Lassonde Curve
COFFEE GOLD PROJECT Lassonde Curve High Value EXPLORATION MINING RISKS Commodity prices Speculators Leave Funding Institutional Investment Technical Speculative Investing Exploration Orphan Period Low Value CONCEPT DISCOVERY FEASIBILITY DEVELOPMENT START UP OPERATIONS FACTORS 4-5 years 1-2 years 2-3
Slide 31: Exploration Project Portfolio
Exploration Project Portfolio Click to edit Master title Christina Project — Chihuahua State, Mexico style Placeton / Caballo Muerto — Chile
Slide 32: Chihuahua Vein District & Chilean Copper Porphyry Country
OVERVIEW OF CRISTINA & PLACETON / CABALLO MUERTO Chihuahua Vein District & Chilean Copper Porphyry Country CRISTINA — CHIHUAHUA, MEXICO PLACETON / CABALLO MUERTO — CHILE • Multiple outcropping quartz veins consistently over 10 m in width • Placeton and Caballo Muerto Cu-Au porphyry targets adjacent
Talamore Mining — Investor Presentation (September 2026) on 6ix