Amplitude Energy Limited · ASX:AEL

Amplitude Energy — Cooper Energy NL — Shareholder Meeting (November 2003)

24 slides from Amplitude Energy's shareholder meeting presentation, Nov 28, 2003

  1. Slide 1: Tony Wright, Director of Operations

    Tony Wright DIRECTOR OF OPERATIONS \Coope:

  2. Slide 2: Selective acreage, existing infrastructure

    » Selective acreage » Existing infrastructure \Coope§r Energy NL

  3. Slide 3: Infrastructure: Oil & Gas hub

    Infrastructure: Oil & Gas hub NORTHER TERRITORY. 7 Established Cooper pipeline access to | ESTs | eastern and ee southern seaboard markets Infrastructure provides basis for early cash flow from discoveries Pipelines Processing -) a 0 Gas — 8

  4. Slide 4: Cooper Basin

    Cooper Basin Tenement interests and infrastructure

  5. Slide 5: This time last year

    This time last year > Partners Prospects Percentages Production

  6. Slide 6: PEL oil fairway

    PEL 92 oil fairway SELLICKS 1 3E Raven? vt rg

  7. Slide 7: Energy NL

    Energy NL

  8. Slide 8: Cooper Basin 2003 drilling program

    Cooper Basin 2003 drilling program Chylsies 4 Gi discovery |

  9. Slide 9: Development to raise production to over 1000 bopd

    >» Development to raise production to over 1000 bopd @coopei /Energy NL

  10. Slide 10: Christies completion — pre pump

    Christies completion — pre pump

  11. Slide 11: No bigger in Australia!

    No bigger in Australia!

  12. Slide 12: Cooper Basin Christies area

    Cooper Basin PEL 92 Christies area P5000 KILOMETRES ie act

  13. Slide 13: Vibroseis truck

    Vibroseis truck

  14. Slide 14: Slide 14

  15. Slide 15: Vibrator in action

    Vibrator in action OoOpeT nergy NL

  16. Slide 16: PEL 93: Karbine/Worrior — 30%

    PEL 93: Karbine/Worrior — 30% iw e ca | © Orywell Potential oil in place: > cistow wore Fault _ 7459 Two way time contours 1450 in milliseconds Karbine -5 million barrels Segmic nierpreted (Dry) Worrior - 3 million barrels (Namur, Birkhead, Hutton Oil) Pando 1 - drilled in 1966 — drilling practices

  17. Slide 17: Find the oil zones?

    Find the oil zones? Birkhead Fm Top Hutton Fm 2TQy NL

  18. Slide 18: DST #2

    DST #2 1552-69m 400 bid oil ___,

  19. Slide 19: Worrior — DST #3

    Worrior 1 — DST #3

  20. Slide 20: Worrior-1 - Completion

    WORRIOR-1 - COMPLETION Energy N NL

  21. Slide 21: Worrior (COE 30%)

    Worrior 1 (COE 30%) » Discovered oil in 3 zones and gas (and probable oil) in a 4 zone » Total of 35.5 metres of net pay » Production commenced 27 November 2003 > Net production, COE share, initially 360 BOPD > Pipeline planned for installation during 2004 Zooper Energy NL

  22. Slide 22: 2004 Drilling Program

    2004 Drilling Program POQOeT Energy NL ae (5%) ee —CENKiwi 2008 gan diceovery Production Licences ; - Gas pipeline Oil pipeline. PEL 92 (25%) ome Gees ah S59

  23. Slide 23: Summary

    SUMMARY Pure Cooper Basin focus, ‘Brownfields’ oil and gas explorer - established infrastructure and market access - 1 gas & 3 oil discoveries from 8 wells drilled Excellent spread of drilling and acreage - 6 blocks, net 1 million acres (participating in 3m acres) - 25% to 40% contingent interest Ag

  24. Slide 24: Reserves estimated 1.4 M barrels

    Reserves estimated 1.4 M barrels -OoOpeY: nergy NL

Cooper Energy NL — Shareholder Meeting (November 2003) on 6ix