Amplitude Energy Limited · ASX:AEL
Amplitude Energy — Cooper Energy NL — Shareholder Meeting (November 2003)
24 slides from Amplitude Energy's shareholder meeting presentation, Nov 28, 2003
Slide 1: Tony Wright, Director of Operations
Tony Wright DIRECTOR OF OPERATIONS \Coope:
Slide 2: Selective acreage, existing infrastructure
» Selective acreage » Existing infrastructure \Coope§r Energy NL
Slide 3: Infrastructure: Oil & Gas hub
Infrastructure: Oil & Gas hub NORTHER TERRITORY. 7 Established Cooper pipeline access to | ESTs | eastern and ee southern seaboard markets Infrastructure provides basis for early cash flow from discoveries Pipelines Processing -) a 0 Gas — 8
Slide 4: Cooper Basin
Cooper Basin Tenement interests and infrastructure
Slide 5: This time last year
This time last year > Partners Prospects Percentages Production
Slide 6: PEL oil fairway
PEL 92 oil fairway SELLICKS 1 3E Raven? vt rg
Slide 7: Energy NL
Energy NL
Slide 8: Cooper Basin 2003 drilling program
Cooper Basin 2003 drilling program Chylsies 4 Gi discovery |
Slide 9: Development to raise production to over 1000 bopd
>» Development to raise production to over 1000 bopd @coopei /Energy NL
Slide 10: Christies completion — pre pump
Christies completion — pre pump
Slide 11: No bigger in Australia!
No bigger in Australia!
Slide 12: Cooper Basin Christies area
Cooper Basin PEL 92 Christies area P5000 KILOMETRES ie act
Slide 13: Vibroseis truck
Vibroseis truck
Slide 14: Slide 14
Slide 15: Vibrator in action
Vibrator in action OoOpeT nergy NL
Slide 16: PEL 93: Karbine/Worrior — 30%
PEL 93: Karbine/Worrior — 30% iw e ca | © Orywell Potential oil in place: > cistow wore Fault _ 7459 Two way time contours 1450 in milliseconds Karbine -5 million barrels Segmic nierpreted (Dry) Worrior - 3 million barrels (Namur, Birkhead, Hutton Oil) Pando 1 - drilled in 1966 — drilling practices
Slide 17: Find the oil zones?
Find the oil zones? Birkhead Fm Top Hutton Fm 2TQy NL
Slide 18: DST #2
DST #2 1552-69m 400 bid oil ___,
Slide 19: Worrior — DST #3
Worrior 1 — DST #3
Slide 20: Worrior-1 - Completion
WORRIOR-1 - COMPLETION Energy N NL
Slide 21: Worrior (COE 30%)
Worrior 1 (COE 30%) » Discovered oil in 3 zones and gas (and probable oil) in a 4 zone » Total of 35.5 metres of net pay » Production commenced 27 November 2003 > Net production, COE share, initially 360 BOPD > Pipeline planned for installation during 2004 Zooper Energy NL
Slide 22: 2004 Drilling Program
2004 Drilling Program POQOeT Energy NL ae (5%) ee —CENKiwi 2008 gan diceovery Production Licences ; - Gas pipeline Oil pipeline. PEL 92 (25%) ome Gees ah S59
Slide 23: Summary
SUMMARY Pure Cooper Basin focus, ‘Brownfields’ oil and gas explorer - established infrastructure and market access - 1 gas & 3 oil discoveries from 8 wells drilled Excellent spread of drilling and acreage - 6 blocks, net 1 million acres (participating in 3m acres) - 25% to 40% contingent interest Ag
Slide 24: Reserves estimated 1.4 M barrels
Reserves estimated 1.4 M barrels -OoOpeY: nergy NL
Cooper Energy NL — Shareholder Meeting (November 2003) on 6ix