Slide 1: Resource Scale, Strategic Scalability – Eagle Mountain Gold Project
Resource Scale Strategic Scalability Eagle Mountain Gold Project Guyana, South America January 2024 TSX.V: GXS | OTCQX: GXSFF
Slide 2: Cautionary Statements
Cautionary Statements Forward-Looking Statements Certain statements contained in this presentation constitute “forward-looking statements” and “forward-looking information” (collectively “forward-looking statements) within the meaning of Canadian and United States securities legislation, including t
Slide 3: Capital Structure
Capital Structure Twelve-Month Price Chart Deep Value for Executable Shallow Ounces 0.55 500,000 450,000 0.50 400,000 IN MILLIONS 0.45 350,000 Shares outstanding 59.8 Share Price (C$) Fully diluted (1) 69.4 300,000 0.40 Market capitalization (Jan 16, 2024) C$15.2 Volume 250,000 Cash position, no de
Slide 4: Management and Board
Goldsource Mines Inc. (GXS-TXS.V) Management and Board Steve Parsons, P.Eng., Chief Executive Officer (25+ yrs experience) Graham C. Thody, CPA, CA, Lead Director (40+ yrs experience) Capital markets professional, senior executive and operations engineer focused Member of British Columbia Institute
Slide 5: Resource Scale, Strategic Scalability
Resource Scale Strategic Scalability Formula for Project Execution Resource Scale • Eagle Mtn Prospecting License, Guyana • 2022 MRE1 – 1.2 mln oz in Indicated and 582,000 oz gold in Inferred Resources • Targeting shallow multi-mln oz potential Distinctly Shallow and Scalable • Shallow 75% of Indica
Slide 6: Eagle Mountain Project (100%)
Eagle Mountain Georgetown Project (100%) Eagle Mtn Stands Out in Under-Explored Guyana 230 km SW of Georgetown, Guyana 100% interest in the Eagle Mountain Prospecting License (PL) covers an Highway access from Georgetown area of 5,000 hectares(2) with commercial airport in Mahdia, 7 km from the Eagl
Slide 7: Government Infrastructure Build Out
Government Infrastructure Build Out Benefiting Eagle Mountain Project Road Upgrade Project (in progress) Upgrade 121 km of gravel road to asphaltic concrete (Linden to Mabura) To improve transport efficiency, climate resilience and road safety Grant from the UK Caribbean Paved Road (existing) Gravel
Slide 8: Widespread Gold Mineralization
Widespread Gold Mineralization Regionally and at Eagle Mountain Zion N Eagle Mountain TSX.V: GXS | OTCQX: GXSFF 8
Slide 9: Regional gold mining areas around Eagle Mountain
St Elizabeth Mahdia – St. Elizabeth Paleochannel (north of Eagle Mtn) Mahdia Valley Eagle Mtn Breakfast Creek and Konawaruk River Salbora Mahdia – Tiger Creek Eagle Mountain Paleochannel Deposit (northeast of Eagle Mtn) Minnehaha River Wineaperu Mowasi Minnehaha Creek Mahdia – Tiger Creek Mine (nort
Slide 10: Eagle Mtn Project Geology
Eagle Mtn Project Geology Prominent NE and NS Structural Trends Eagle Mountain Deposit • Series of tabular, shallow, dip-slope shear zones developed within a granodioritic host rock. Covers an area of ~ 2.5 km by 1.5 km • At least three discrete zones of alteration and mineralization. Zone 1 is shal
Slide 11: MRE April 2022 Sensitivity
Pit Constrained MRE - $1,600/oz Au Price MRE April 2022 Sensitivity Analysis (Gold Price) Eagle Mountain Looking North Salbora Toucan-Powis View Point Plunge: -6o Azimuth: 008o Pit Constrained MRE - $1,800/oz Au Price TSX.V: GXS | OTCQX: GXSFF 11
Slide 12: Apr 2022 MRE Update: Confirming Scale
Apr 2022 MRE Update Confirming Scale… …Indicated Resources up 40% to 1.2mln oz gold Drilling MRE defined by 772 core holes 75,430 m with avg depth of 98 m Eagle Mountain and Salbora Deposits Au Price Assumption at US$1,600/oz CATEGORY OXIDATION CUT-OFF TONNES GOLD GOLD OUNCES TYPE GRADE MT GRADE Sha
Slide 13: PEA Report Highlights
Eagle Mountain Project (100%) PEA Report Highlights(1,2,3) Conceptual open pit with phased development Life of Mine (LOM) Phase 1 “free dig” saprolite 4.5 yrs 15 yrs Phase 2 saprolite/fresh 10.5 yrs Low capex intensity, shallow mineralization and IRR 57% phased development drive robust after-tax IRR
Slide 14: PEA Economics
Eagle Mountain Units US$1,850/oz (Base Case) US$2,055/oz (spot)(1) Project (100%) Pre-Tax After-Tax Pre-Tax After-Tax IRR (3) % 75% 57% 91% 69% PEA Economics1,2 Payback Period(2) Months 16 18 14 16 NPV0% (3) US$ M 605 443 793 585 NPV5% (3) US$ M 406 292 532 388 Fit For Purpose NPV8% (3) US$ M 326 23
Slide 15: PEA - Phased Development Plan
PEA - Phased Development Plan Shallow Open Pits & Conventional Processing Plant Phase 1 – Saprolite-Only Mineralization (4.5 yrs) • 5,000 tpd of saprolite at cut-off grade of 0.3 g/t • Avg annual gold production of ~68 oz/year for 4.5 yrs • Development capex of US$95.6M with short payback of 18 mont
Slide 16: PEA – Life-of-Mine Profile
PEA – Life-of-Mine Profile Projected Annual Cash Flow and Production Profiles 250 Phase 1 - Saprolite Phase 2 - Fresh Rock/Trans + Saprolite Blend 600 Phase 1 - Saprolite Phase 2 - Fresh Rock/Trans + Saprolite Blend 120,000 2,000 Cumulative After-Tax Free Cash Flow (US$ M) 200 Annual Revenue (Opex &
Slide 17: 2023/24 Plan For Unlocking Value at Eagle Mountain
2023/24 Plan For Unlocking Value at Eagle Mountain Phased Development Plan and Deposit Style Key for Project Delivery Scalable and Executable Development Resource Scale – Multi-Million Ounce Potential With low capex and opex potential At Eagle Mountain and regionally Scalability - Horizontal tabular
Slide 18: Projected Timeline for Eagle Mountain Gold Project
Projected Timeline for Eagle Mountain Gold Project Phased development plan to drive staged permitting and engineering activities * Current project position 2011 - 2022 2023 2024 ~2025-2027 Discovery Hole to Exploration Engineering Permitting Development Exploration Resource Outline Studies Project F
Slide 19: Scale and Scalability
Scale and Scalability Formula for Project Execution E info@goldsourcemines.com T 1-866-691-1760 D 604-694-1760 TSX-V: GXS | OTCQX: GXSFF GOLDSOURCEMINES.COM
Slide 20: Eagle Mountain Deposit - April 2022 MRE
Eagle Mountain Deposit - April 2022 MRE Eagle Mountain Deposit Sub-Horizontal Zones Starting at Surface Oxidation Domains (looking South-East) Eagle Mountain Deposit Resource Category (looking South-East) April 2022 MRE Update Indicated Res. Extends from surface to max depth of 150 m Average depth o
Slide 21: Eagle Mountain Deposit (MRE Area) Intrusion Related
Eagle Mountain Deposit (MRE Area).... Intrusion Related Sub-Horizontal Zones in Granodiorite Schematic of Mineralized Zones at Eagle Mountain Deposit • Sub-horizontal mineralized zones starting at surface • Shallow, west-dipping thrust faults in granodiorite range from narrow mylonite zones to broad
Slide 22: Appendix: PEA Mine Plan
Appendix PEA Mine Plan (Higher-Grade Subset of the 2022 MRE) Net Conversion of April 2022 MRE 2024 PEA Conceptual LOM Plan Tonnes CLASSIFICATION In-situ grade Mill head grades Mt Mt % (gpt Au) (gpt Au) INDICATED SAPROLITE AND 12.5 1.04 11.3 1.08 90% TRANS FRESH ROCK 18.7 1.28 8.7 1.58 47% ALL INDICA
Slide 23: Appendix: April 2022 MRE Sensitivity to Gold Price
Appendix April 2022 MRE Update - Sensitivity to Gold Price GOLD PRICE TONNES GOLD OUNCES AU CLASSIFICATION (US$/OZ) (000 T) (GPT) (000 OZ) 1,500 12,400 1.05 416 1,600 12,500 1.04 417 INDICATED 1,700 12,500 1.04 418 SAPROLITE & 1,800 12,500 1.04 418 TRANSITION 1,500 6,000 0.72 138 1,600 6,100 0.71 13
Slide 24: Appendix: Non-IFRS Financial Measures
Appendix Non-IFRS Financial Measures Goldsource has included certain non-IFRS financial measures in this presentation, such as development capital expenditures, sustaining capital expenditures, free cash flow, total cash costs, and all-in sustaining costs, which are not measures recognized under IFR