Karnalyte Resources Inc. · TSX:KRN

Karnalyte Resources — Investor Presentation (April 2013)

24 slides from Karnalyte Resources's investor presentation, Apr 11, 2013

  1. Slide 1: The leading developer of premium quality potash

    Thee leading ead g developer de e ope o of p premium e u quality potash

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Certain statements in this presentation may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation, or industry results, to be materia

  3. Slide 3: Investment Highlights

    Investment Highlights • Bankable feasibility study complete De-risked project • EIS approved profile • Strategic investor with off-take agreement (GSFC) Near-term plans to • Staged approach: 3 Phases: 625Ktpa, 1.375Mtpa and 2.125Mtpa initiate Phase I • Lower upfront CAPEX CAPEX, shorter time to prod

  4. Slide 4: Mineral Resource: Carnallite

    Mineral Resource: Carnallite What is Carnallite? (KCl + MgCl2 + 6H2O) • A potassium salt-bearing mineral • Dissolves faster than Sylvinite, making a solution mining process more efficient • The first mineral that was mined to produce potash (mid 1800’s in Germany) • Contains magnesium • Used as a tr

  5. Slide 5: The World's Largest Potash-Producing Region

    The World’s Largest Potash-Producing Region Property comprises a total of ~86,126 acres • Located 0.5 km south of Highway 16 near Wynyard, SK Existing infrastructure • Rail and roadways • Natural gas, power and water in close proximity SASKATCHEWAN Opportunity for resource expansion Canada Potash Co

  6. Slide 6: Karnalyte's Competitive Advantage

    Karnalyte’s Competitive Advantage Mineral Resource Characteristics Dissolves faster than other salts Lower solution mining OPEX than other potassium salts Amenable to solution mining g Lower CAPEX, shorter construction timeline than conventional mining Contains magnesium Opportunity for product expa

  7. Slide 7: High Quality Potash Product

    High Quality Potash Product Granular, uniformly sized-pellets are a significant competitive advantage Ideal for NPK bulk blending Better handling and storage characteristics Even distribution during application More uniform crop growth Superior flowability Reduced caking and segregation Product exce

  8. Slide 8: Strategic Investor with Off-Take Agreement

    Strategic Investor with Off-Take Agreement Gujarat State Fertilizers & Chemicals (GSFC) and Karnalyte entered into a strategic g p partnership p in Januaryy 2013* • $45MM investment for 19.98% ownership stake • Commitment for additional $15MM in future equity rounds • 20 year committed take-or-pay o

  9. Slide 9: Attractive Project Economics

    Attractive Project Economics* Bankable Feasibility Study (BFS) • Production targeted in early 2015 • Initial production of 625Ktpa with ramp-up to 2.125Mtpa in 5 to 6 years • Potash price of $480/tonne BFS Summary • Total Reserves and Resources (155Mt Proven and Probable reserves) support a 70 year

  10. Slide 10: Key Milestones and Near-Term Catalysts

    Key Milestones and Near-Term Catalysts Pursuing g debt and/or / equity q y financing g to obtain total Project j funding g Pursuing additional strategic partner for • Project financing; • Off-take arrangements; and/or • Marketing assistance W ki towards Working d obtaining b i i site i and d ffacili

  11. Slide 11: Timeline to Production

    Timeline to Production 2011 2012 2013 2014 2015 2016 2017 2018 2019  Bankable Study Feasibility  Magnesium Pre-Feasibility  Saskatoon Operations Office  Strategic Partner(s) (Q1, 2013)  EIS (Q1 2013) - Groundbreaking for Mine & Plant Construction (2013) - Phase I Construction Completion 625Ktpa

  12. Slide 12: Global Marketing Strategy

    Global Marketing Strategy Overseas North America • GSFC off-take agreement • Remaining production into N.A. market • Potential for another strategic partner • Central North American distribution location • Port locations • Among highest global pricing environments • Additional off-take • Premium pro

  13. Slide 13: Transportation & Distribution Strategy

    Transportation & Distribution Strategy Transload Rail Product will be transported by truck Canadian Pacific (CP) main rail line ~3 km ~3 km to CP rail line from plant site • Evaluating car supply, movement and rail options Port Other initiatives Significant progress made with various Evaluating Cana

  14. Slide 14: Management Team Experienced in Building Potash Mines

    Management Team Experienced in Building Potash Mines Robin L. Phinney, P.Eng., President, CEO and Ronald Love, CA, Executive VP, CFO and Director Director • More than 16 years of experience in progressively senior • Held various engineering positions with Potash Corp of financial roles Saskatchewan

  15. Slide 15: Board of Directors

    Board of Directors Bruce Townsend, Director and Chairman of the Paul Sharpe, B. Sc., Chemistry Director Board* • Partner with the law firm Perley – Robertson, Hill & McDougall • Director, Financial Analysis Nitrogen Operations with PCS LLP and practices primarily in the chemical, and biochemical fro

  16. Slide 16: TSX:KRN Key Metrics

    TSX:KRN Key Metrics* Recent share p price (3/ (3/28/2013) / 3) $8.25 $ 5 Shares O/S 27.4MM Fully diluted shares O/S 28.7MM C h ((12/31/2012) Cash / / ) $ $25.1MM MM Ownership (% of basic shares O/S) Top Institutions 19.6 Management & Directors 16.4 Analyst Coverage BMO Capital Markets Canaccord Genu

  17. Slide 17: Near-Term, De-Risked Development of High Quality Potash

    Near-Term, De-Risked Development of High g Qualityy Potash • Highest grade agriculture product • Mi i l environmental Minimal i t l iimpactt • De-risked project • Experienced management team and board: industry-specific expertise • Production expected in 2 years • After-tax Net Present Value (NPV) o

  18. Slide 18: Appendix

    =Karnalyte RESOURCES \ (h ee mM. a ( i <rrn—A=E “4 ~via aa Keaumeser s = RRO NE el ~sneneee™ =N

  19. Slide 19: Solution Mining Overview

    Solution Mining Overview Surface Facility Brinefield Brine Processing Ground Surface Cavern Patience i Lake k Member b ( (Predominantly d i l Carnallitite) C lli i ) Cavern Belle Plaine Member (Predominantly Carnallitite) Esterhazy Member (Sylvinite) Cavern Source: Bankable Feasibility Study 18

  20. Slide 20: Brine Processing Overview

    Brine Processing Overview Brine Processing Overview Simplified Flow Diagram Brine processing removes impurities from Cooling Proces Heat Brinefield th extracted the t t d mineral i l iin order d tto obtain bt i Water s Water Source saleable potassium chloride (KCl) • Evaporators remove water from pr

  21. Slide 21: BFS Capital Cost Specifics

    BFS Capital Cost Specifics 625Ktpa Operation (Phase I) C$626mm (C$1,002/tonne) US$mm US$ per tonne % of Total 5% Process Equipment and Facility $234 $374 36% 9% Process Equipment and Facility Solution Mining Facilities $118 $189 18% Solution Mining Facilities Other Direct Costs $94 $150 14% 36% Indi

  22. Slide 22: BFS Operating Cost Specifics

    BFS Operating Cost Specifics 625Ktpa Operation (Phase I) C$81mm (C$129/tonne) C$mm C$ per tonne % of Total 6% 8% Personnel $7 $11 8% 5% Personnel Natural Gas $27 $43 34% 10% Natural Gas Electricity $10 $16 12% Electricity Brine Field Expansion $21 $33 26% Maintenance & Spare Parts $8 $13 10% 34% Bri

  23. Slide 23: Bankable Feasibility Study Economics

    Bankable Feasibility Study Economics Economic Model Assumptions BFS Reserves & Resources BFS Assumptions Mineralized Average KCl Net KCl Reserves & Resources 2.125Mtpa Operation Tonnage (Mt) Grade (%) Tonnage (Mt) Production Start Up (year) 2015 Total Average Carnallitite 677.6 18.6% 126.0 Mine Prod

  24. Slide 24: Magnesium Upside Potential

    Magnesium Upside Potential • Positive Pre-Feasibility Study completed for Magnesium Pre-Feasibility Study Assumptions Production Facility in 2012 Magnesium PFS 191Ktpa Operation • 147Mt of probable MgCl2 reserves with a mine life 70 years Production Start Up (year) na  Reserve can increase when add