Peninsula Energy Limited · ASX:PEN

Peninsula Energy — Mines and Money Hong Kong 2012

37 slides from Peninsula Energy's conference presentation, Mar 20, 2012

  1. Slide 1: Company Presentation - Mines and Money Hong Kong 2012

    For personal use only 20 March 2012 Companies Announcement Office Via Electronic Lodgement COMPANY PRESENTATION Please find attached a copy of the presentation scheduled to be made by Peninsula Energy Limited's Executive Chairman, Mr John (Gus) Simpson at Mines and Money Hong Kong 2012, at 12.30pm l

  2. Slide 2: For personal use only

    For personal use only 20-Mar-12 1

  3. Slide 3: Disclaimer

    Disclaimer For personal use only This presentation is provided on the basis that the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing contained in the Presentati

  4. Slide 4: Competent Person

    Competent Person For personal use only The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information p compiled byy Mr Alfred Gillman and Mr George g van der Walt. Mr Gillman is a Fellow of the Australian Institute of Mining g and Metal

  5. Slide 5: Company Overview

    Company Overview For personal use only • Emerging uranium producer listed on the (ASX:PEN) with established project pipeline and completed Feasibility Study • Targeting 2.2mlbs U3O8 pa from Wyoming 2012 /13 • US$207 million NPV • US$76 million free cash flow per annum (steady state production) • L L

  6. Slide 6: Existing Uranium Demand Drivers

    Existing U Uranium i D Demand dDDrivers i For personal use only • 434 operating nuclear power stations (Feb 2012) operated by 31 countries • 240 research and medical isotope reactors • 140 nuclear powered ships • C Consuming i 200 200mlbs lb uranium i p.a. • One ton of natural uranium produces more

  7. Slide 7: Future Uranium Demand

    Future Uranium Demand For personal use only Reactor Units and Market Demand Forecasts by Region 2010 U308 2015 U308 2020 U308 2025 U308 2030 U308 Reactor Demand Reactor Demand Reactor Demand Reactor Demand Reactor Demand Region Units mlbs/pa Units mlbs/pa Units mlbs/pa Units mlbs/pa Units mlbs/pa No

  8. Slide 8: China, India & Eastern Europe nuclear build out plan

    China, India & Eastern Europe nuclear build out plan For personal use only • Two billion people are pressing for a modern urban life style in China, India and Eastern Europep ((CIEE)) and this means Industrialisation • The industrialisation/urbanisation of CIEE requires low cost power generation • A

  9. Slide 9: Uranium Supply

    Uranium Supply For personal use only • Kazakhstan ISL U3O8 Production Growth: 2000 5mlbs 2000, 2008 18mlbs 2008, 2009 2009, 36mlbs 2011 44mlbs 2011, 2012 44mlbs est. 2012, est • Megatons to Megawatts program: Uranium recovery from nuclear weapons – US utilities - end of 2013 24mlbs • Fukushima more

  10. Slide 10: Long Term Uranium Price

    Long Term Uranium Price For personal use only $150 © UxC $135 Long-Term vs Spot Composite Scenario $120 Historical Spot Ux U3O8 Price $105 $90 Historical Ux Long-Term U3O8 Price $75 $60 $45 $ $30 $15 $0 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 21 23 25 Composite Uranium Price Projection, U

  11. Slide 11: Corporate

    Corporate For personal use only Share Price 5000 0.14 Shares on issue 2,150m 4800 0.12 Share price 5.5c Market capitalisation $118m 4600 0.1 Cash balance $16m 4400 0.08 Debt $0 Enterprise value $102m 4200 0.06 Equity Facility $100m 0.04 4200 Shareholding 0.02 PEN – Daily Line Chart (Close) Directors

  12. Slide 12: Directors and Management

    Directors and Management For personal use only Board of Directors • Executive Chairman Gus Simpson Strong leadership, corporate and project management skills • Executive Director - Operations Malcolm James Strong corporate project mgmt and financing experience • Technical Director Alf Gillman Highly

  13. Slide 13: Business Plan – 10mlbs per annum before 2025

    Business Plan – For personal use only 10mlbs per annum before 2025 • To commence ISR production at Lance Projects, Wyoming in 2012/13* building to 2 2.2mlbs 2mlbs U3O8 p.a. p a over 3 years (Plant capacity 3mlbs p p.a.) a) • Continue to develop the mineral potential at: – Wyoming y g 95-145mlbs U3O8

  14. Slide 14: Market Valuation Analysis - Uranium Producers

    Market Valuation Analysis - Uranium Producers For personal use only Market Cap Per Pound of Production: Annuall A Jan 31, J 31 2012 Pre Fukushima P F k hi Production 2011 Market Cap Market Cap Company (approx. U3O8 lbs) (US$millions) (US$millions) Cameco 21 700 000 21,700,000 9 147 9,147 14 324 14,3

  15. Slide 15: Lance Projects - Location & Wyoming Uranium

    Lance Projects- Location & Wyoming Uranium For personal use only Currently y Licenced Christensen‐Irigaray Sweetwater Lance Project Smith Ranch Ranch‐Highland Highland Lost Creek In Permitting Ross Hank & Nichols Jab & Antelope Moore Ranch 14

  16. Slide 16: Lance Projects – Development Model

    Lance Projects – De elopment Model Development For personal use only • 41.4mlbs U3O8 JORC compliant resource Tonnes Ore U3O8 U3O8 Grade Resource Cl ifi ti Classification (M) kg (M) lbs (M) (ppm U3O8) Measured 3.6 1.7 3.7 479 Indicated 7.8 3.0 7.5 433 Total M+I 11.5 4.7 11.2 448 Inferred 33.1 13.7 30

  17. Slide 17: Lance Projects - DFS Expanded Economic Study

    Lance Projects- DFS Expanded Economic Study For personal use only US$ per lb US$ / Year Steady State Production Revenue (2011 base escalated at 2.6%) $62.58 $164 million Assumptions Operating cash cost (C1) $11.93 $26 million ISR mining with centralised plant Royalties y & Tax $10.80 $ $24 million $

  18. Slide 18: Lance Projects – Exploration Potential

    Lance Projects – Exploration Potential For personal use only

  19. Slide 19: Resource Growth Trend

    Resource Growth-Trend Growth Trend For personal use only 1,106 No. PEN holes 45000000 Inferred 4,738 No. NuBeth holes 40000000 Indicated Measured 805 4,738 35000000 30000000 600 4,738 30,178,789 25000000 lbs U3O8 281 22 454 321 22,454,321 20000000 4,738 15,955,169 15000000 10000000 11,130,000 6,681,

  20. Slide 20: Drilling Post June 2011 Resource Upgrade

    Drilling Post June 2011 Resource Upgrade For personal use only Hole ID Easting Northing Total Intercept ft over From (ft) GT Peak Depth (ft) PFN U3O8 grade Concentration ppm Grade RMR1730 501106 4934667 920 15.5'@1530ppm 830.75 2.37 4'@5160ppm RMR1531 500813 4935919 880 21'@830ppm 714.75 1.74 11.5'

  21. Slide 21: Lance Projects – Strategic Partner & Uranium Sales

    Lance Projects – Strategic Partner & Uranium Sales For personal use only • First sale contract USA utility: Feb 2011 WAP $75.60 per lb, 7 year contract – first delivery 2013 & 5.5% planned production • Boswell Capital: May 2011 Specialist uranium advisory group, group ongoing role evaluating juniors

  22. Slide 22: Lance Projects – Permitting

    Lance Projects – Permitting For personal use only Mine permitting on schedule D Deep Di Disposall Wells W ll • DDW feasibility study completed • Licence application lodged • Licence granted 30 March 2011 • Aquifer is deemed exempt NRC Source Material Licence • Technical reports completed • Environme

  23. Slide 23: Lance Projects – Proposed Development Schedule

    Lance Projects – Proposed Development Schedule For personal use only 2009 2010 2011 2012 2013 Permitting (subject to regulatory approval) Resource Definition Scoping Study/ PFS / DFS/EES Project Financing Construction Construction, Commissioning, Production Expanded Resource Drilling 22

  24. Slide 24: Business Plan – 10mlbs per annum before 2025

    Business Plan – For personal use only 10mlbs per annum before 2025 • To commence ISR production at Lance Projects, Wyoming in 2012/13* building to 2 2.2mlbs 2mlbs U3O8 p.a. p a over 3 years (Plant capacity 3mlbs p p.a.) a) • Continue to develop the mineral potential at: – Wyoming y g 95-145mlbs U3O8

  25. Slide 25: Karoo Projects – Location

    Karoo Projects – Location For personal use only 20-Mar-12 24

  26. Slide 26: Karoo Projects – Regional Geology

    Karoo Projects – Regional Geology For personal use only 20-Mar-12 Poortjie Teekloof Member F Formation ti Moordenaars/ Loxton Members Abrahamskraal Davidskolk Formation Member Stratigraphic Column 25

  27. Slide 27: Karoo Projects – Mineral Potential

    Karoo Projects – Mineral Potential For personal use only Exploration Tonnes Grade U3O8 P t ti l Potential ( ) (m) ( (ppm U3O8) ( lb ) (mlbs) Range From To From To From To Total 36 60 1,200 1,400 90 150 Historic Tonnes Grade Total Mineralisation (ppm eU3O8 ) (eU3O8 mllbs) Site 22 860,000 1,480 2.8 Si

  28. Slide 28: Site Uranium Potential

    Site 29 Uranium Potential For personal use only • 108km2 of Prospective Poortjie Sandstone • 308 holes drilled by Union Carbide B • Drill-defined 600,000 lbs U3O8 at 1,107 ppm A A • 214 RC twin and exploration holes completed in 2011 • 167 historic holes drilled re-probed • Drilling confirmed high g

  29. Slide 29: Site Cross Section

    Site 29 Cross Section For personal use only A B Diagrammatic composite section 181 intercepts >200ppm, 70 >1,000ppm 28

  30. Slide 30: Site Uranium Potential

    Site 22 Uranium Potential For personal use only 2.8mlbs U3O8 at 1 480 1,480ppm • GT7 prospect 2.8mlbs 2 8mlbs drill-defined eU3O8 • 707 historic percussion holes drilled by JCI • 118 RC holes and 4 diamond holes in 2011 • 160 historic holes drilled re probed re-probed • Stacked uranium bearing chann

  31. Slide 31: Site Core Hole Cross Section

    Site 22 Core Hole Cross Section For personal use only 86 intercepts >1,000ppm, 272 intercepts >200ppm 30

  32. Slide 32: Site Uranium Potential

    Site 45 Uranium Potential For personal use only 25km • 4.3mlbs drill-defined eU3O8 • 400 historic hi t i drilled d ill d by b JCI • 340 km2 prospective Davidskolk formation • 16 historic holes p probed in 2011 • Stacked uranium bearing channels • Potential 15mlbs U3O8 • Numerous un-tested U3O8 occur

  33. Slide 33: Karoo Projects – Project Schedule

    Karoo Projects – Project Schedule For personal use only 2010 2011 2012 2013 2014 2015 2016 2017 Resource Definition (JORC conversion) Internal Conceptual C S Study Ext. Scoping Study PFS/BFS Construction Commissioning Production Expanded Resource Drilling 32

  34. Slide 34: Karoo Projects – Development Model

    Karoo Projects – Development Model For personal use only • Multiple open-pits; with central processing facility at Site 29 • All sites it within ithi road-hauling d h li di distance t • Planning production in 2016/2017 • Continue to delineate > 120mlbs of uranium mineralisation Process flow sheet 33

  35. Slide 35: Karoo Projects – Conceptual Study

    Karoo Projects – Conceptual Study For personal use only US$ per lb US$ / Year Assumptions Revenue $65-75 $191 million Capex Amortisation $3.4 $11.6 million • Open-pit mining with Financing cost $1.0 $3.3 million conventional milling Operating Costs $28.5 $76.1 million • Central Ce a processing p oce

  36. Slide 36: Investment Highlights

    Investment Highlights For personal use only • Emerging uranium producer listed on the (ASX:PEN) with established project pipeline and completed Feasibility Study • Targeting 2.2mlbs U3O8 p.a. from Wyoming 2012 /13 • US$207 million NPV • US$76 million free cash flow per annum (steady state production

  37. Slide 37: Targeted Milestones

    Targeted Milestones For personal use only • April 2010: Initial JORC Resource at Lance Mar 2012: 4th revised JORC resource • May 2010: Pre-feasibility study completed Mar 2012: Optimised FS completed • July 2010: Revised JORC compliant resource Mar 2012: Decision to Mine • Dec 2010: Submit final

Peninsula Energy — Mines and Money Hong Kong 2012 on 6ix