Esgold — Investor Presentation (August 2024)
25 slides from Esgold's investor presentation, August 2024
Slide 1: ESGold Corp.
ESGold Corp. August 2024 CSE: ESAU | OTC: ESAUZF | FSE: N2W esgold.com
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking
Slide 3: ESGold Overview
ESGOLD OVERVIEW —_—_
Slide 4: 2024 Outlook
2024 OUTLOOK VALUE DRIVERS MONTAUBAN – ROAD TO PRODUCTION ▰ Projected is fully permitted to operate 1000m/t per day Merrill-Crowe closed circuit process system for processing tailings at Montauban ▰ Infrastructure in place includes steel structure building (16,000 ft 2), Quebec Hydro power line and
Slide 5: Business Overview
BUSINESS OVERVIEW ▰ Formed in 2004 and traded on the CSE (CSE:ESAU), ESGold is headquartered in Vancouver, BC ESGold is a Canadian gold exploration company based in ▰ The company is developing the Montauban Mine project to profitably extract Vancouver, BC, focused on significant residue minerals whi
Slide 6: Management Team
MANAGEMENT TEAM Paul Mastantuono Tony J. Giuliano Brad Kitchen CEO & Director CFO President & Director • Started a transportation company in early 2000 • Experienced financial executive having worked as • 35-year record consisting of investment banking and later focused on the transportation of bulk
Slide 7: Independent Directors / Advisors
INDEPENDANT DIRECTORS/ ADVISORS André Gauthier Kevin Arias Claude Duplessis Director Corporate Development Geology • Over 47 years of experience in the Mining Exploration • Kevin Arias has been active in the Capital Markets • Senior Engineer with over 26 years of experience in field and has worked i
Slide 8: Share Structure/Private Placement
SHARE STRUCTURE/PRIVATE PLACEMENT Private Placement Offering Up to 5,000,000 Common Share and Warrant Units Price: C$0.10 per Unit Gross Proceeds: Up to C$500,000 Unit Offering: C$0.10 per Unit. Each Unit being comprised of one common share ("Common Share") of the Company at a price of $0.10 and one
Slide 9: Montauban Project
MONTAUBAN PROJECT —_—_
Slide 10: The Montauban Project Site
THE MONTAUBAN PROJECT SITE The property is located approximately 80 km west of Quebec City and 60 km north of Trois-Rivières, in the Montauban Township in the Portneuf County, Quebec 10
Slide 11: Montauban Highlights
MONTAUBAN HIGHLIGHTS PROJECT HIGHLIGHTS Highlights based on Tailings and limited 4 year Near Surface Production ▰ Fully permitted processing operations for 1,000 t/d mill (all values in US$) Resource Prices Resource Prices Current Market used in 2023 for Break Even Resource Prices ▰ Mill building an
Slide 12: Drilling & Mineral Resources at Montauban
DRILLING & MINERAL RESOURCES AT MONTAUBAN ▰ The drill hole database contained 352 valid drill hole collars, with a total meterage of 1,654.04 m and 1,170 assay intervals totaling 1,498.05 m. For the Notre-Dame-de-Montauban tailing a total of 35 test pits and trenches totaling 77.44 m were excavated.
Slide 13: Tailings Mineral Resources at Montauban 2023
TAILINGS MINERAL RESOURCES AT MONTAUBAN 2023 The mineral resources estimation for the Montauban and the Notre-Dame-de-Montauban tailings Montauban tailings Au (g/t) Ag (g/t) AuEq (g/t) Tonnes Au Oz Ag Oz AuOz eq Indicated 0.40 31 0.78 603 700 7 800 610 350 15 000 Inferred 0.34 28 0.67 292 000 3 150
Slide 14: The Montauban Site Opportunity
THE MONTAUBAN SITE OPPORTUNITY ▰ ESGold has the opportunity to create significant asset value for its shareholders by processing the existing gold, silver and mica found in the toxic mine tailings while satisfying the corporate ESG objectives of removing the toxins and restoring the sites back to a
Slide 15: Montauban Near Surface Potential Hard Rock Resources
MONTAUBAN NEAR SURFACE POTENTIAL HARD ROCK RESOURCES Near Surface Potential 1M+ tons Based on Historical independent reports NI 43-101 (J. Marchand) 2003 ) Gold Silver 3.6 g/t+ 29 g/t+ 125,000 oz Au 817,000 oz Ag ▰ Montauban deposit and area have not been explored with modern exploration technique ▰
Slide 16: Near Surface Historical Resources Potential
NEAR SURFACE HISTORICAL RESOURCES POTENTIAL Surface resources - section 1310 N Grab Samples 1 11.90 g/t Au 31.4 g/t Ag 2 33.20 g/t Au 74.00 g/t Ag 3 1.20 g/t Au 25.00 g/t Ag Based on Historical independent reports non NI 43-101 † Source : Jacques Marchand for Mirabel Resources ‡ Source : Izza Minera
Slide 17: Near Surface Potential Resources
NEAR SURFACE POTENTIAL RESOURCES Zone MT Au (g/t) Ag (g/t) Zone Nord 274,500 2.80 15.00 Zone Sud 123,533 3.50 56.00 3.02 27.72 Sub-total 398,033 (38,832 oz) (356,886 oz) Golden Goose 693,590 3.44 14.32 3.29 19.20 Total 1,091,623 (115,357 oz) (674,061 oz) *based on Historical independent reports NI 4
Slide 18: Montauban Mine Past Production
MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990† tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ 18
Slide 19: ESGold's Montauban Business Model
ESGOLD’S MONTAUBAN BUSINESS MODEL ESGold Corp. has a viable solution, which encompasses the restoration of contaminated tailings sites and the extraction of precious metals including gold and silver as well as industrial minerals such as mica. ACQUISITION MILL FACILITY OPERATION & REVENUE NEW PRODUC
Slide 20: ESGold Local Support
ESGOLD LOCAL SUPPORT STRONG SUPPORT FROM THE STRONG SUPPORT FROM THE HIGH INTEREST FOR NEW GOOD MUNICIPALITY, MAYOR, LOCAL POPULATION PERMANENT QUALITY JOB ADMINISTRATION CREATION 20
Slide 21: Work Completed to Date by ESGold
WORK COMPLETED TO DATE BY ESGOLD ▰ Over $11M has been invested in developing the Montauban Project ▰ ESGold has obtained all the required permits to restore this contaminated site and has signed the required protocols with the municipality of Notre-Dame-de-Montauban ▰ The company has completed all t
Slide 22: Montauban Plant Engineering Design
MONTAUBAN PLANT ENGINEERING DESIGN 22
Slide 23: Montauban Plant Site Plan
MONTAUBAN PLANT SITE PLAN DRAIN PIPE @ = 280mm Park boundary of existing tailings pond 7 i PROCESSING MILL FACILITY NEW ROUTE ON THE DAM \ EXISTING ACCESS ROAD ACCUMULATION BASIN \ PUMPING STATION ENT. TEL. 514.543.6580 itp wre GROUPE-ALPHARD com me ec Layout pian for the plant site {GENO
Slide 24: Project Investment Objectives
PROJECT INVESTMENT OBJECTIVES 1 Secure private and public sector financing to begin production within 12 to 18 months 2 Process mining residues, recover the precious metals (gold, silver and industrial metal muscovite (mica)) and restore the site (decontaminate) through treatment and neutralization
Slide 25: Corporate Directory
CORPORATE DIRECTORY ESGold Corp. Paul Mastantuono, CEO +1 514.712-1532 CSE: ESAU | OTC: ESAUZF | FSE: N2W pmastantuono@esgold.com 1500 – 1050 W Georgia St. Brad Kitchen, President Vancouver, BC, V6E 4N7 +1 604.506.7555 bkitchen@esgold.com Email: info@esgold.ca This presentation has been reviewed by