Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (July 2024)

29 slides from Purepoint Uranium's investor presentation, July 2024

  1. Slide 1: Investing in Canada's Uranium Exploration

    INVESTING IN CANADA’S URANIUM EXPLORATION TSXV: PTU | OTCQB: PTUUF Q3 - 2024

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Disclaimer The general information set out in this presentation regarding the uranium market, including but not limited to, the demand and supply of uranium, historical events that affected uranium pricing, the global state of the uranium market and other related informati

  3. Slide 3: Deep Portfolio of Advanced Drill Ready Projects

    DEEP PORTFOLIO OF ADVANCED DRILL READY PROJECTS Nine highly prospective projects US$50MM spent in the development and refinement of this portfolio, including very substantial geophysics, interpretation and first pass drilling The most speculative stage of investment has now been successfully complet

  4. Slide 4: Components of a Uranium Discovery: The Endowment of Saskatchewan

    Components of a Uranium Discovery The Endowment of Saskatchewan Since 1968: • Over 2 billion lbs. of U3O8 have been discovered in the Athabasca Basin across 38 separate deposits • Averaging more than 50 million lbs. each • Weighted average ore grade of 9.98% • Current insitu value of over US$4Billio

  5. Slide 5: Components of a Uranium Discovery: The Essential Ingredients

    Components of a Uranium Discovery The Essential Ingredients • Over the past 20 years there has been approximately Cdn$3 billion spent on Extensive and Strategic Land Package uranium exploration in Saskatchewan Substantial Financial Commitment • Over the same period, 700,000,000 lbs. U3O8 have been d

  6. Slide 6: Extensive and Strategic Land Package

    Components of a Uranium Discovery The Essential Ingredients Extensive and Strategic Land Package Total Portfolio size Operating Explorer Deposit Grade (hectares) UEX Corp Kianna (2005) 234,000 1.47% 52,000,000 Denison Mines Phoenix (2008) 208,000 18.48% 138,000,000 Hathor Exploration Roughrider (200

  7. Slide 7: Substantial Financial Commitment

    Components of a Uranium Discovery The Essential Ingredients Substantial Financial Commitment Investment Operating Explorer Deposit Leading up to Grade Discovery UEX Corp Kianna (2005) n/a 1.47% 52,000,000 Denison Mines Phoenix (2008) n/a 18.48% 138,000,000 Hathor Exploration Roughrider (2008) US$27,

  8. Slide 8: Respect for Capital

    Components of a Uranium Discovery The Essential Ingredients Respect for Capital Cost • First Pass Investors focus on drilling; however Drilling • Follow Up When a single drill hole can cost more Ground Geophysics • Magnetics, electromagnetics • Gravity, resistivity - more than an entire geophysical

  9. Slide 9: Persistence

    Components of a Uranium Discovery The Essential Ingredients Persistence Holes Drilled Market Value Operating Explorer Deposit Prior to Prior to Current Value Discovery Discovery UEX Corp Kianna (2005) n/a $80,000,000 Sold 2021 $270,000,000 52,000,000 Denison Mines Phoenix (2008) 249 $1,200,000,000 $

  10. Slide 10: Components of a Uranium Discovery: The Essential Ingredients

    Components of a Uranium Discovery The Essential Ingredients Large portfolio size and multiple projects within the Basin, indicating Extensive and Strategic Land Package extensive exploration potential. Substantial investment in exploration, both in terms of stages completed Substantial Financial Com

  11. Slide 11: Hook Lake JV

    HOOK LAKE JV Cameco | Orano | Purepoint Joint Venture Breakdown Next Steps • Cameco: 39.5% • Orano: 39.5% • Follow-up drill program at Carter Corridor for • Purepoint: 21.0% 2024 winter program • As the operator, Purepoint earns a 10% • The 25-kilometre strike length of the Carter management fee str

  12. Slide 12: Hook Lake JV: Spitfire Discovery and Comparables

    HOOK LAKE JV Cameco | Orano | Purepoint Purepoint’s Spitfire Discovery . • Resource not defined • Results include 10.3% U3O8 . over 10.0 metres . NexGen’s Arrow Deposit • 2018 PFS . • Indicated Resource • 256,600,000 lbs U3O8 • Avg Grade 4.03% U3O8 Fission’s Triple R Deposit • 2022 Resource Est. • I

  13. Slide 13: Carter Corridor

    Carter Corridor Clearwater • 25km band of graphitic conductors Domain • Ideal Rock Type Carter Corridor • Extremely close to hydrothermal heat source (Clearwater Domain) Lightning Zone • Complex, long-lived faulting pattern 2023/2024 Last 12 Months Drilling • 8,042m across 10 holes • 5-800m step out

  14. Slide 14: Drill Results

    > =9 ¹ 600000 602000 604000 > = > 9 =9 > = 9 AA > =9 > = 9 6400000 6400000 A > = 9 > = 9 > = 9 > = > = 9 9 > = ! H 9 > = > = CRT23-05 9 9 Drill Results > = > ! ( 9 A =9 0.08% U 3O8 > = = 9 CRT23-06 over 0.4 m >9 > = = 9 > =9 • Diamond drill hole CRT23-05 returned 9 > > A =9 ct . orp ! H CRT23-04 0.0

  15. Slide 15: 2024: Discovery of the Lightning Zone

    2024: Discovery of the Lightning Zone • CRT24-10 intersected a 13 m wide zone of altered brecciation and shearing that returned 0.29% U3O8 over 0.9 metres (at a true vertical depth of 375 metres), including 0.68% U3O8 over 0.3 metre. • CRT24-08A, a 200 metre step out from CRT23-05 towards the northe

  16. Slide 16: 100% Owned Turnor Lake Project

    100% OWNED TURNOR LAKE PROJECT Drilling to date has identified a large region of elevated uranium Description Next Steps • 9,706 hectares situated in the easter plane of the • Results from 2 drill holes drilled at Athabasca Basin Turnor Lake during fall 2022 will be • 100% owned used to re-interpret

  17. Slide 17: 100% Owned Turnor Lake Project

    100% OWNED TURNOR LAKE PROJECT Drilling to date has identified a large region of elevated uranium Cameco DDH KER-17 0.09% U3O8 over 0.5m at unconformity Denison RL13-16 0.45% U3O8 over 2.3m IsoEnergy’s Hurricane Deposit 48.61MM lbs U3O8 @ 34.5% Purepoint IsoEnergy Denison ddh OD-1 0.06% U3O8 over 3.

  18. Slide 18: 100% Owned Turnor Lake Project

    100% OWNED TURNOR LAKE PROJECT Drilling to date has identified a large region of elevated uranium Description: • 9,706 hectares situated in the eastern plane of the Athabasca Basin • 100% Owned • Assessment held until: August 2031 TSXV: PTU | OTCQB: PTUUF 18

  19. Slide 19: 100% Owned Turnor Lake Project

    100% OWNED TURNOR LAKE PROJECT Drilling to date has identified a large region of elevated uranium Serin Zone Laysan Zone Description: • 9,706 hectares situated in the eastern plane of the Athabasca Basin Turaco Zone • 100% Owned • Assessment held until: August 2031 Turnor Lake Zone TSXV: PTU | OTCQB

  20. Slide 20: 100% Owned Red Willow Project

    100% OWNED RED WILLOW PROJECT A host of ready targets Description Next Steps • 22 mineral claims for a total of • Prospecting and field checking of 40,116 hectares Dancing Lake, Long Lake, Topping • 100% owned Island, Golden Eye, Ghost Lake, Horse • 2022/23 winter drill program Lake, Boundary, Jeffr

  21. Slide 21: 100% Owned Red Willow

    100% OWNED RED WILLOW ~10km NE of Orano’s JEB Mine & ~10km N of Cameco’s Eagle Point Mine Topping Island Golden Eye Jeffrey Description: Dancing Lake • 22 mineral claims with a total area of 40,116 hectares Osprey Dominic • 100% Owned Boundary Geneva • 2023 Fall Drill Program: Long Lake • 9 priority

  22. Slide 22: Smart Lake Joint Venture

    SMART LAKE JOINT VENTURE Due south of some of the Basin’s largest uranium deposits Description Next Steps • 9,860 hectares ~18 km west-northwest of • Follow-up airborne geophysics and Hook Lake JV and ~60km south-southwest of geological field mapping is planned for Orano’s former Cluff Lake Mine 202

  23. Slide 23: Smart Lake

    Smart Lake JV with Cameco Corp. • Geologically connected to the Shea Creek Deposit • The Smart Lake targets represent the southern end of the “Saskatoon Lake Conductor: displaced along the Beaty River Fault • Early drilling by the JV partners, intersected basement-hosted uranium mineralization assoc

  24. Slide 24: 100% Owned Tabbernor Project

    100% OWNED TABBERNOR PROJECT Due south of some of the Basin’s largest uranium deposits Description Next Steps • 70,598 hectares situated just outside of the • Follow-up airborne geophysics and Athabasca Basin and due south of some of the geological field mapping Basin’s largest uranium deposits • 10

  25. Slide 25: 100% Owned Tabbernor Project

    100% OWNED TABBERNOR PROJECT Located within the Tabbernor Fault System Tabbernor Fault System (TFS) • The TFS is a wide, >1500 km geophysical, topographic and geological structural zone • It hosts over 80 historic mines and gold occurrences, as well as cross cuts the Basin’s mine trend aligning itse

  26. Slide 26: Highly Qualified Leadership Team

    HIGHLY QUALIFIED LEADERSHIP TEAM With decades of experience in the Athabasca Basin Chris Frostad, BBA, CA, CPA - President & CEO and Director Linda Tong, GIS Specialist • 35+ years of experience in the development and building a variety of • 20+ years of experience in GIS application, GIS developmen

  27. Slide 27: Highly Qualified Leadership Team

    HIGHLY QUALIFIED LEADERSHIP TEAM With decades of experience in the Athabasca Basin Allan Beach, BA. LLB, Director and Corporate Secretary Chris Frostad, BBA, CA, CPA - President & CEO and Director • Former partner Fasken Martineau DuMoulin LLP, with over • 35+ years of experience in the development

  28. Slide 28: Compelling Exploration Upside

    COMPELLING EXPLORATION UPSIDE Exploration discovery delivers the most dramatic inflection point in resource value Carefully Assembled Athabasca Basin Portfolio TSX Venture: PTU | OTCQB: PTUUF Actively advancing a deep pipeline of strategically situated, Market Capitalization ($Cdn as of July 23, 202

  29. Slide 29: Stay Informed on News & Events Shaping the Uranium Market

    STAY INFORMED ON NEWS & EVENTS SHAPING THE URANIUM MARKET PTU Monthly Uranium Uranium Spotlight Exploration Newsletter Weekly Podcast Chris Frostad, President & CEO cfrostad@purepoint.ca T: +1.416.603.8368 Jeanny So, Corporate Communications info@jeannyso.com T: +1.647.202.0994 www.purepoint.ca Twit

Purepoint Uranium Group — Investor Presentation (July 2024) on 6ix