Giyani Metals Corp · TSXV:EMM

Giyani Metals — Indaba 121 Cape Town 2022

21 slides from Giyani Metals's conference presentation, May 2022

  1. Slide 1: Developing Battery Grade Manganese for the EV Market

    DEVELOPING BATTERY GRADE MANGANESE FOR THE EV MARKET INDABA / 121 CAPE TOWN MAY 2022 giyanimetals.com

  2. Slide 2: Cautionary Note – Forward Looking Statements

    CAUTIONARY NOTE – FORWARD LOOKING STATEMENTS This presentation contains certain forward-looking information and forward-looking statements, as defined in applicable securities laws (collectively referred to herein as “forward-looking statements”). These statements relate to future events or the Comp

  3. Slide 3: High Value Exposure to Expanding EV Market

    HIGH VALUE EXPOSURE TO EXPANDING EV MARKET Overlooked component of the Operating in Tier One mining ESG at the core of the Near-term value catalysts EV supply chain jurisdiction projects success in 2022 • Developing K.Hill high purity • Botswana is the longest serving • Member of the Critical Minera

  4. Slide 4: ESG at the Heart of Everything We Do

    ESG AT THE HEART OF EVERYTHING WE DO • Giyani is committed to conducting its business in a manner that is ethical, sustainable and beneficial to all stakeholders • Giyani’s goal is to be a low carbon company, with initiatives including: • Renewable energy integration (solar power) into power mix • E

  5. Slide 5: LiB Battery Metals Supply Chain

    LIB BATTERY METALS SUPPLY CHAIN PROCESSED BATTERY RAW MATERIALS BATTERY PACKS EVS MATERIALS • Mineral ores are mined and • Metals salts are combined into • Cathodes, anodes and other • Completed battery packs processed into battery-grade precursor materials components combined into inserted into of

  6. Slide 6: Manganese: The Forgotten Battery Mineral

    MANGANESE: THE FORGOTTEN BATTERY MINERAL • Majority of LiB batteries cathodes are NMC (nickel + manganese + cobalt) • Price and sustainability are driving end-users towards manganese-rich formulations e.g. NMC-370 (BASF); NMx (SVolt) • As global battery demand is forecast to grow 14x by 2030, mangan

  7. Slide 7: Manganese Production Dominated by China

    MANGANESE PRODUCTION DOMINATED BY CHINA • Currently only one company produces HPMSM outside of China • K.Hill is scheduled to be only second project ex-China to produce HPMSM directly from ore • In 2021, the major Chinese manganese metal producers signed a “cooperation agreement” to consolidate dome

  8. Slide 8: Attractive Asset Base in Pivotal Location

    ATTRACTIVE ASSET BASE IN PIVOTAL LOCATION PROJECTS (100%) • Three previously producing battery-grade manganese oxide prospects • K.Hill: historic mine outside small town of Kanye • Otse: 2 km from A1 highway and 50 km from K.Hill • Lobatse: 1 km from the RSA border and 50 km from K.Hill • Ore from a

  9. Slide 9: Low Carbon, Selenium Free Production

    LOW CARBON, SELENIUM FREE PRODUCTION Demonstration Plant Easy mining Friable, low impurity ore amenable to free dig mining Low carbon MnO ore requires no calcining so hydromet process direct from ore to HPMSM. LCCA results in Q3 2022 • Demonstration plant will replicate the proposed Renewable energy

  10. Slide 10: Growth Through Successful Exploration

    GROWTH THROUGH SUCCESSFUL EXPLORATION Tonnage Grade MnO Contained K.Hill Project Including Extension Classification (Mt) (%) MnO (kt) Indicated Mineral Resources 2.1 19.3 410 Inferred Mineral Resources 3.1 16.9 530 High-grade stockpile at K.Hill • K.Hill resource has grown from 1.7Mt to over 2Mt of

  11. Slide 11: Upcoming Milestones Towards Production

    UPCOMING MILESTONES TOWARDS PRODUCTION Completion and Mobilisation of Demo publication of Submission of ESIA Product testing by Plant to site in Construction and Feasibility Study and and Mining Licence battery and CAM Botswana and commissioning of LCCA application producers recommissioning commerci

  12. Slide 12: Standout Opportunity in Its Peer Group

    STANDOUT OPPORTUNITY IN ITS PEER GROUP • Only 3 listed companies are actively developing new HPMSM Comparison of Project Profitability vs Enterprise Value projects In feasibility Producing ore 500 120 • K.Hill is the highest grade listed HPMSM project and has the largest NPV per tonne (Mn) in the gr

  13. Slide 13: International Mine-Building Experience

    INTERNATIONAL MINE-BUILDING EXPERIENCE GIYANI METALS BOARD OF DIRECTORS JONATHAN HENRY JOHN PETERSEN STEPHANIE HART MICHAEL JONES ROBIN BIRCHALL NON-EXECUTIVE CHAIR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR CEO MENZI BATTERY METALS (PTY) LIMITED THUSO DIKGAKA KNEIPE SETLHA

  14. Slide 14: Strong Share Structure and Debt-Free

    STRONG SHARE STRUCTURE AND DEBT-FREE Warrants / Options / TICKER MARKET CAP* SHARE PRICE* 52 WEEK RANGE SHARES O/S RSUs O/S TSXV : EMM C$ 81.1M C$ 0.39 C$ 0.28 - 0.70 208,010,715 56,156,024 OTC: CATPF MAJOR SHAREHOLDERS RAB Capital 9.1% Directors and Management 3.0% 1 Primevest Capital 3.0% MMCAP As

  15. Slide 15: Contact Us

    CONTACT US Giyani Metals Corp. 2010 Winston Park Drive - Suite 200 Oakville, ON L6H 5R7 Canada info@giyanimetals.com giyanimetals.com @GiyaniMetals #GiyaniMetals 14 giyanimetals.com

  16. Slide 16: Appendix

    APPENDIX 15 giyanimetals.com

  17. Slide 17: K.Hill Project Overview

    K.HILL PROJECT OVERVIEW • K.Hill is the highest valued project in its peer group on an NPV/t Mn resources basis but Giyani trades at the lowest P/NAV • Initial designs are a highlight a low profile, shallow dual pit operations feeding a nearby processing facility • April 2021 PEA based on K.Hill Mai

  18. Slide 18: Project Milestones Achieved

    PROJECT MILESTONES ACHIEVED Aug. 2020: Completed high Dec. 2020: Received Jun. 2021: Sep. 2021: Feb. 2022: Dec. 2019: purity manganese market approval for ESIA Mar. 2021: Results of the initial New MRE of 1.6Mt in New MRE of 2.1Mt in Commencement of K.Hill analysis, price forecasting & Scoping & Ter

  19. Slide 19: Targeting Low Carbon Manganese

    TARGETING LOW CARBON MANGANESE OTHER ATTRIBUTES THAT No Export’ Net Zero Transition to IPP CONTRIBUTE TO LOW CARBON FOOTPRINT OPERATION: Scenario 1 2 3 • Ore source is high grade and Export of excess power to grid? No Yes Yes located close to the processing Requires Regulatory approval No Yes Yes pl

  20. Slide 20: Botswana: Africa's Premier Mining Location

    BOTSWANA: AFRICA’S PREMIER MINING LOCATION STABLE ECONOMY TO INVEST IN • Well established mining industry with investor friendly laws and processes for exploration, development and operations • Longest serving democracy in Africa • Steady economic growth of 4% in the 12 months to September 2019 (5%

  21. Slide 21: K.Hill Visualisation

    K.HILL VISUALISATION 20 Aerialgview i y of an imetals.com the K.HILL Deposit

Giyani Metals — Indaba 121 Cape Town 2022 on 6ix