SandRidge Energy, Inc. · NYSE:SD

SandRidge Energy — 2015 IPAA OGIS New York

29 slides from SandRidge Energy's conference presentation, Apr 20, 2015

  1. Slide 1: 2015 IPAA OGIS New York

    2015 IPAA OGIS NEW YORK MONDAY, APRIL 20, 2015 1

  2. Slide 2: Disclaimer

    DISCLAIMER Forward Looking Statement This presentation includes "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These statements express a belief, expectation or intention an

  3. Slide 3: Mission Statement

    MISSION STATEMENT Our Mission at SandRidge is to create the premier, high-return, growth-oriented, resource conversion company, focused in the Midcontinent region of the United States. FY SANDRIDGE THE POWER OF US”

  4. Slide 4: SandRidge Has a Leading U.S. Midcontinent Oil & Gas Position

    SANDRIDGE HAS A LEADING U.S. MIDCONTINENT OIL & GAS POSITION WE ARE SKILLED, LARGE SCALE DEVELOPERS OF OIL AND GAS RESOURCES • 1,400 wells drilled, over $5B invested since 2010 ($1.6B in 2014) • Producing over 90 MBoe/d, largest water gathering system in U.S. (over 1.2 MMBw/d) • Expert at horizontal

  5. Slide 5: Actions to Thrive in Lower Price Environment

    ACTIONS TO THRIVE IN LOWER PRICE ENVIRONMENT SUCCESS DEMONSTRATED BY HITTING GROWTH GUIDANCE AND ADDING RESERVES • Reserves up 37%, PUD type curve up 27% • 2014 production of 29 MMBoe, 1% over guidance; Midcon grew 47% YoY to Q4’14 76 MBoe/d IMPROVED CAPITAL EFFICIENCY THROUGH 2015 AND INTO 2016 • $

  6. Slide 6: 27% More EUR for 80% of the Cost

    27% MORE EUR FOR 80% OF THE COST returns are preserved… drilling location count grows. At lower well costs… Development inventory is preserved with lower costs and expanded with oil price recovery Type curve returns at target costs and Service cost reductions plus increased current strip comparable

  7. Slide 7: 2015 Capex of $700MM vs. $1.6B in 2014

    2015 CAPEX OF $700MM VS. $1.6B IN 2014 Reducing Capital Spending While Increasing Efficiency PRINCIPLES PLANNED SPEND AND RESULT $700MM Capex budget Drilling projects must generate hurdle returns at strip pricing 28.0-30.5 MMBoe guided production Unlock value in this market • Efficiency gains Guidin

  8. Slide 8: Strong Hedge Position

    STRONG HEDGE POSITION $50 Oil in 2015 Realizes $81.50 per Bbl * • As of 02.25.2015 • Positions displayed include royalty trusts, but are exclusive of basis hedges. • Liquids hedged to NYMEX WTI; Natural Gas hedged to NYMEX Henry Hub * NGL barrels hedged at 3:1 ratio to WTI SandRidgeEnergy.com 8 8 23

  9. Slide 9: Capital Structure Focus

    CAPITAL STRUCTURE FOCUS Ample Liquidity, No Near Term Maturities • $900MM borrowing base MARKET VALUE ($ in millions) • New senior secured covenant (2.25x EBITDA beginning 3/31/15) Market Cap (4/14/2015) $1,002 • No bond maturities before 2020 Net Debt(1)(2) 3,014 Preferred Stock 565 Enterprise Valu

  10. Slide 10: 2014 Achievements

    2014 ACHIEVEMENTS Hit our Operating Stride in 2014, Now Focused on Balance Sheet 2014 FULL YEAR RESULTS • 37% Proved reserves growth • 27% Type curve growth * • 47% Midcon production growth TOTAL SD PRODUCTION • 1% over production guidance midpoint • Added Garfield county to focus area • Pioneered m

  11. Slide 11: Year End Proved Reserves +37% to 516 MMBoe

    YEAR END PROVED RESERVES +37% TO 516 MMBOE Consistent Growth of a Strong Reserves Base RESERVES MIX • $5.5B SEC PV-10(a) (+34% YOY) • 42% Liquids Mix • $10.69 Proven Value/Boe(a) • 18.7 Years Reserve Life • 604% All-in Reserve Replacement • 12.2 Years Proved Developed • 65% Proved Developed Reserve

  12. Slide 12: Well Performance Supports Type Curve Growth

    WELL PERFORMANCE SUPPORTS TYPE CURVE GROWTH Several Quarters of Stronger Gas IPs and Early Volumes SandRidgeEnergy.com 12 12

  13. Slide 13: 2015 Mississippian PUD Type Curve

    2015 MISSISSIPPIAN PUD TYPE CURVE 484 MBoe, 44% Liquids 2015 OIL: 118 MBo 30 Day IP (Bo/d) 190 1st Year Decline(a) 80% B Factor 1.26 2015 NGL: 97 MBbls Yield (Bbls/MMcf) 51.6 Shrink 86.1% 2015 GAS: 1.6 Bcf (b) 30 Day IP (Mcf/d) 966 1st Year Decline(a) 62% B Factor 2.00 MBoe SandRidgeEnergy.com (a) R

  14. Slide 14: Meaningful Well Cost Reductions

    MEANINGFUL WELL COST REDUCTIONS $250K of $600K Targeted Savings Realized as of March 2015 EFFICIENCY GAINS • Rig efficiency • Location high-grading • Wellbore + completion design SERVICE COSTS • Rig rates • Directional drilling • Stimulation • Liner packer system • ESPs MULTILATERAL EXPANSION • 40%

  15. Slide 15: 40% Multilaterals in 2015 Drilling Plan

    40% MULTILATERALS IN 2015 DRILLING PLAN 100% of 90-Day Type Curve Production for 85% of the Cost of a Single Lateral FULL SECTION DEVELOPMENT ACTIVITY AND SUCCESS IN 2014 • Sole multilateral operator in the Midcontinent • Multilateral program consisted of 28 projects with average completed well cost

  16. Slide 16: Multi-Zone Drilling Locations and 2015 Activity

    MULTI-ZONE DRILLING LOCATIONS AND 2015 ACTIVITY Ramp Down to 6 Development Rigs + 1 Committed to Appraisal New Ventures DRILLING LOCATION INFORMATION ( As of February 2015) MISS CHESTER WOODFORD* Producing Laterals 1,375 37 5 Peak 30-Day Boe 365 361 418 Future Locations(a) 3,212 401 147 * Wells deve

  17. Slide 17: Large Midcontinent Fairway for Appraisal

    LARGE MIDCONTINENT FAIRWAY FOR APPRAISAL Material Success in Chester and Woodford • Appraisal / New Ventures is a critical piece of SD business • Focused on redevelopment of additional legacy vertical reservoirs and technology transfer of SD expertise from existing to new areas • $46MM CAPEX budget

  18. Slide 18: New Ventures Success Case

    NEW VENTURES SUCCESS CASE Pioneering Chester Oil Development • First industry horizontal re-development of legacy Chester vertical production – Fine grained silty sandstone, distinct pay intervals separated by shale – Existing infrastructure in area – Higher oil cut and less water production than Mi

  19. Slide 19: Geological Expertise Unlocks Woodford

    GEOLOGICAL EXPERTISE UNLOCKS WOODFORD Refined Geological Model Yielding Strong Results • Woodford targets now identified based on four desirable characteristics: – Production interval above Woodford (example: Mississippian) – Siliceous Woodford member with moveable oil – Productive interval below Wo

  20. Slide 20: Saltwater Gathering & Disposal (SWG)

    SALTWATER GATHERING & DISPOSAL (SWG) Most Efficient SWG Operator in the Mid-Continent ~$600MM INVESTED THROUGH 2014 PRODUCE • Average capacity of 15,000 Bw/d per • ~1.3 million barrels of water gathered and disposed per well day during Q4‘14 in the Mid-Continent and Permian Basin – Low pressure pump

  21. Slide 21: Largest Saltwater Gathering System in the Nation

    LARGEST SALTWATER GATHERING SYSTEM IN THE NATION Pipeline Footprint Resembles Typical Gathering System • 191 SWG wells • 1,260 MBw/d current volumes • 99% of Water is Piped vs. Trucked • 1,049 miles of installed pipelines • Advanced hydraulic simulation • Resembles hydrocarbon gathering and processi

  22. Slide 22: Appendix

    FY SANDRIDGE APPENDIX

  23. Slide 23: 2015 Production Guidance

    2015 PRODUCTION GUIDANCE Note: Totals may not foot due to rounding (a) 2014: 1.3 MMBoe of non-recurring production related to divested GOM assets SandRidgeEnergy.com 23 23

  24. Slide 24: Capital Structure Overview

    CAPITAL STRUCTURE OVERVIEW Senior Notes ($ in millions) Preferred Stock ($ in millions) 8.75% Sr Notes due 2020 $450 8.5% Convertible Perpetual Preferred (a) $265 7.5% Sr Notes due 2021 1,175 7.0% Convertible Perpetual Preferred (b) 300 8.125% Sr Notes due 2022 750 Total $565 7.5% Sr Notes due 2023

  25. Slide 25: Hedging Overview

    HEDGING OVERVIEW LIQUIDS Q1 2015 Q2 2015 Q3 2015 Q4 2015 2015 2016 Swaps Volumes (MMBbls) 2.29 1.73 1.01 0.55 5.59 1.46 Price ($/Bbl) $92.71 $91.55 $92.43 $94.11 $92.44 $88.36 Three-way Collars Volumes (MMBbls) 0.72 0.73 1.56 1.56 4.58 2.56 Call Price ($/Bbl) $103.13 $103.13 $103.65 $103.65 $103.48

  26. Slide 26: 2014 Year End Reserves

    2014 YEAR END RESERVES Creating Value from a Strong Reserve Base SEC Pricing $91.48 / $4.35 RESERVES PV10 PV-10 LIQUIDS GAS EQUIVALENT % $MM % MMBbls Bcf MMBoe Reserves by Reservoir Status PDP – Producing 119 1,011 287 56% $ 3,523 64% PNP – Non Producing 15 117 35 7% 462 8% PBP – Behind Pipe 2 76 14

  27. Slide 27: 2015 Operational Guidance

    2015 OPERATIONAL GUIDANCE PRODUCTION PRICE REALIZATIONS a) EBITDA from Oilfield Services and Other is a non-GAAP Oil (MMBbls) 9.0 – 10.0 Oil (differential below WTI) $3.75 financial measure as it excludes from net income interest expense, income tax expense and depreciation, Natural Gas Liquids (MMB

  28. Slide 28: 2015 Capex Guidance

    2015 CAPEX GUIDANCE 2015 CAPEX GUIDANCE 2015 GUIDANCE LATERAL COUNTS 2015 GROSS 2015 NET Development D&C $306 Development 182 116 Appraisal & New Ventures D&C 29 Appraisal & New Ventures 11 8 Carryover 102 Total Laterals 193 124 Total D&C $437 SWG - D&C 11 Permian 0 JV Carry 0 Total D&C $448 OTHER E

  29. Slide 29: SandRidge Investor Relations

    Our Mission at SandRidge is to create the premier, high-return, growth-oriented, resource conversion company, focused in the Midcontinent region of the United States. SANDRIDGE INVESTOR RELATIONS 123 Robert S. Kerr Avenue, Oklahoma City, OK 73102 investors@sandridgeenergy.com www.SandRidgeEnergy.com

SandRidge Energy — 2015 IPAA OGIS New York on 6ix