Eq Resources Limited · ASX:EQR

Eq Resources — Carbine Tungsten — North Qld Economic Summit 2015

19 slides from Eq Resources's conference presentation, 2015

  1. Slide 1: Carbine Tungsten Limited

    Carbine Tungsten Limited Mt Carbine Tungsten Project Jim Morgan CEO & Managing Director

  2. Slide 2: Mt Carbine Tungsten Mine - Location

    Mt Carbine Tungsten Project Mt Carbine Mining Leases cover Mt Carbine ~367 hectares. Tungsten Historical Mt Carbine Tungsten Mine - Location Mine located 130km by sealed highway from the port of Cairns in Northern Queensland, Australia. The northern face of the open pit mine is visible from the high

  3. Slide 3: Tungsten: Industrial Enabling Metal with Strategic Importance

    Tungsten…. Industrial Enabling Metal with Strategic Importance

  4. Slide 4: Tungsten: Industrial Enabling Metal

    Tungsten… Aeronautical & Automobile Manufacturing Industrial With a density of 19.25 g/cm3, tungsten is also among the Enabling heaviest metals. Metal with Strategic Rail & Heavy Earthmoving Importance Highest melting point of all metals at 3,422 ± 15 oC and a boiling point which corresponds approx.

  5. Slide 5: Tungsten: Industrial Enabling Metal

    Tungsten… Industrial Enabling Electronics Metal with Strategic Importance New Generation Solar Cells

  6. Slide 6: History of the Mt Carbine Tungsten Mine

    History of the Mt Carbine Tungsten Mine • Tungsten discovered at Mt Carbine in 1895. • Mining at Mt Carbine consisted of small scale, selective underground mining of the quartz veins until 1919 when world wolframite prices collapsed. • Mt Carbine mined sporadically from 1919 to 1968. • In 1972, Quee

  7. Slide 7: Project Economics

    Project Economics NPV Mt Carbine Project Outline $161 million FEASIBILITY STUDY - KEY FINDINGS Resource • Feasibility Study completed July 2012 • Payback period 1.5 years. Mine 47Mt @ 0.13% WO3 confirmed the technical and financial Stockpile 12Mt @ 0.075% WO3 feasibility of the Mt Carbine Project. •

  8. Slide 8: Evolution of the Mt Carbine Tungsten Project

    Evolution of the Junior Diversified 2018 Onwards Significant Open Pit Mine Development Exploration Company Mt Carbine Major Tungsten Producer Tungsten Project Pure Play Tungsten Mining & Tungsten Stockpile Production Company Development & Production 2012 - 2014 2016-2017

  9. Slide 9: Project Overview

    Mining Sublease Boundary Project Overview 1) Stockpiles 2) Open cut

  10. Slide 10: Stockpile Project

    Stockpile Project • Environmental Authority for EPML00956913 issued August 2013. • Covers existing tungsten stockpiles [~12 million tonnes of at-surface stockpiled material] with an annual processing capacity of up to 3 Million Tonnes per Annum (MTPA). • Commercial resource with a mine life potentia

  11. Slide 11: Stockpile Project

    Stockpile Project  Funding: Technical due diligence phase of the funding negotiations with Mitsubishi RtMJ completed in April 2014. US$15 million secured loan (including prepayment fund of previous US$1 million loan) approved by Mitsubishi RtMJ Board in late September 2014.  Off-take: MoU in place

  12. Slide 12: Mt Carbine Mineral Resource Summary - July 2014

    MT CARBINE MINERAL RESOURCE SUMMARY - JULY 2014 TUNGSTEN RESOURCES AS WO3 Resource Resource Cut-off Grade Tonnes WO3 WO3 (%) (Mt) (%) (mtu) 0.075 840,000 Low Grade Stockpile Indicated 0.00 12.0 Main Zone Hard Rock Indicated 0.05 18.0 0.140 2,520,000 Main Zone Hard Rock Inferred 0.05 29.3 0.120 3,516

  13. Slide 13: Open Pit Project

    Open Pit Project • 10 year mine life. • Mineralisation remains open at depth. • Low planned strip ratio. • Process plant will be same as the LGSP operations. • Contains higher grade material than the LGSP ores. Perspective view of WO3% model blocks looking west, incorporating the South Wall Fault an

  14. Slide 14: Planned Acquisition of Quarries

    Planned Acquisition of Quarries • Memorandum of Understanding entered into for the purchase of Mt Carbine and Mossman Quarries. • Established business operated for over 20 years within the Mt Carbine Mining Leases. • Mt Carbine Quarries has a stockpile of “historically excavated and demineralised” m

  15. Slide 15: Quarry - Long Term Strategic Importance

    Quarry - Long Term Strategic Importance • White Paper on Developing Northern Australia released by the Federal Government in June 2015 offers many strategic business opportunities, Mt Carbine & such as:- Mossman Quarries ‒ Commonwealth Government providing a new $5 billion Northern Australian Infras

  16. Slide 16: Economic Benefits

    Economic Benefits • Employment Opportunities for:- • ~ 34 people – Stockpile Project (Operational Phase) • ~ 60 people - Open Cut Project (Operational Phase) • ~150 people during construction phases • Sourcing goods and services from local businesses, wherever possible and economical to do so. • Spo

  17. Slide 17: Mt Carbine - Future Exploration Potential

    Mt Carbine - Future Exploration Potential IRON DUKE - MT CARBINE, QLD • Present resource estimate does not include any Iron Duke mineralisation. Lies within the planned open-cut envelope. • Average true width 8m from 6 drill holes with an average weighted grade of .32% WO3. Mapping indicates a strik

  18. Slide 18: Disclaimer

    Disclaimer Forward Looking Statements Some statements in this presentation relate to the future and are forward looking statements. Such statements may include, but are not limited to, statements with regard to intention, capacity, future production and grades, projections for sales growth, estimate

  19. Slide 19: Thank-you

    Thank-you Carbine Tungsten Limited ACN 115 009 106 50 Scott Street, Bungalow, CAIRNS QLD 4870 - PO Box 1040, Bungalow, CAIRNS QLD 4870 Telephone: +61 (0)7 4052 2400 - Facsimile: +61 (0)7 4052 2444 www.carbinetungsten.com.au (ASX: CNQ)