  1. Slide 1: Commissioning vs. Recommissioning for Energy Efficiency and Improving Overall Building Performance

    Slide 1: Commissioning vs. Recommissioning for Energy Efficiency and Improving Overall Building Performance

    Commissioning vs. Recommissioning for Energy Efficiency and Improving Overall Building Performance Rebecca Ellis Questions & Solutions Engineering September 9, 2020

  2. Slide 2: Agenda

    Slide 2: Agenda

    Agenda  Buildings & Business  Commissioning Overview  Recommissioning Overview  Typical Energy Conservation Opportunities  Costs  Benefits

  3. Slide 3: Buildings & Business

    Slide 3: Buildings & Business

    Buildings & Business  Why do you have buildings? – Shelter people? – Shelter processes? – Shelter product? – Other?

  4. Slide 4: Buildings & Business

    Slide 4: Buildings & Business

    Buildings & Business  Why do you have Mechanical & Electrical Systems? – Lighting? – Comfort? – Safety? – Process / Production – Other?

  5. Slide 5: Buildings & Business

    Slide 5: Buildings & Business

    Buildings & Business  How does Building Performance Impact your Bottom Line? – Personnel productivity? – Production quality? – Customer perception? – Inventory preservation? – Energy costs? – Maintenance costs? – Other?

  6. Slide 6: Buildings & Business

    Slide 6: Buildings & Business

    Buildings & Business  Commissioning & Recommissioning Focus on: – Systems Performance – Systems Efficiency

  7. Slide 7: Commissioning Overview

    Slide 7: Commissioning Overview

    Commissioning Overview  What is Commissioning? – Systematic process of assuring by verification and documentation, from the design phase to a minimum of one year after construction, that all building facility systems perform interactively in accordance with the design documentation and intent, and

  8. Slide 8: Commissioning Overview

    Slide 8: Commissioning Overview

    Commissioning Overview  Pre-Design Phase Activities Commissioning Owner’s Project Plan Requirements Document

  9. Slide 9: Commissioning Overview

    Slide 9: Commissioning Overview

    Commissioning Overview  Design Phase Activities O&M Manuals & Commissioning Design Reviews Specification Training Planning

  10. Slide 10: Commissioning Overview

    Slide 10: Commissioning Overview

    Commissioning Overview  Early Construction Phase Activities Shop Drawing O&M Manual Training Plans Scheduling Review Review

  11. Slide 11: Commissioning Overview

    Slide 11: Commissioning Overview

    Commissioning Overview  Testing & Training Phase Activities Prefunctional Functional Equipment Checklists Performance Training Testing Systems Manual Commissioning & Training Report

  12. Slide 12: Commissioning Overview

    Slide 12: Commissioning Overview

    Commissioning Overview  Occupancy & Operations Phase Activities Amend Recommissioning Late Warranty Commissioning Deferred Testing Plan Checkup Report

  13. Slide 13: Commissioning Overview

    Slide 13: Commissioning Overview

    Commissioning Overview  Systems – HVAC – Normal and Emergency Power – Life Safety – Lighting Controls – Plumbing – Blackout (Integrated Systems) Testing – Building Enclosure

  14. Slide 14: Recommissioning Overview

    Slide 14: Recommissioning Overview

    Recommissioning Overview  Also Known As… – Retro-Commissioning – Existing Building Commissioning – On-going Commissioning

  15. Slide 15: Recommissioning Overview

    Slide 15: Recommissioning Overview

    Recommissioning Overview  Process can Begin Anytime after the Original Design and Construction Team are off the Job – One day later – One year later – Many years later

  16. Slide 16: Recommissioning Overview

    Slide 16: Recommissioning Overview

    Recommissioning Overview  Recommissioning is: – A process by which existing facility system performance is evaluated against the owner’s needs and adjusted and optimized to meet the functional performance criteria. • COVID-19 Note – A process that focuses on DYNAMIC system operation instead of STAT

  17. Slide 17: Recommissioning Overview

    Slide 17: Recommissioning Overview

    Recommissioning Overview  Recommissioning is Verifying Systems Perform as effectively as Desired – Environmental controls – Ventilation • COVID-19 Note – Life safety systems – Lighting – Electrical power – Energy management – Process

  18. Slide 18: Recommissioning Overview

    Slide 18: Recommissioning Overview

    Recommissioning Overview  Recommissioning is Verifying Systems Perform as Efficiently as Possible – Minimizing run times – Adjusting setpoints – Controlling outside air ventilation • COVID-19 Note – Optimizing equipment staging – Sensor calibration – Valve & damper performance – Etc.

  19. Slide 19: Recommissioning Overview

    Slide 19: Recommissioning Overview

    Recommissioning Overview Report & Operational Criteria Recommendations Documentation • Gap analysis • Fine tuning • Capital projects Information Gathering • Documentation reviews Implementation • Interviews • Field observation Measurement & Verification Dynamic System Testing & Monitoring

  20. Slide 20: Recommissioning Overview

    Slide 20: Recommissioning Overview

    Recommissioning Overview  Systems – HVAC – Lighting Controls – Plumbing

  21. Slide 21: Typical Energy Conservation Opportunities

    Slide 21: Typical Energy Conservation Opportunities

    Typical Energy Conservation Opportunities  COVID-19  Operating Equipment more than Required  Outside Air Control – Too much – Too little  Ventilating Unoccupied Spaces

  22. Slide 22: Typical Energy Conservation Opportunities

    Slide 22: Typical Energy Conservation Opportunities

    Typical Energy Conservation Opportunities  Air-Side Economizers – Malfunctioning dampers – Dry-bulb vs. enthalpy control – Mixed air temperature control vs. discharge air temperature control – Sensor calibration – Malfunctioning rooftop controllers

  23. Slide 23: Typical Energy Conservation Opportunities

    Slide 23: Typical Energy Conservation Opportunities

    Typical Energy Conservation Opportunities  Pumping more Water than Required  Supplying more Air than Required  Simultaneous Heating & Cooling

  24. Slide 24: Typical Energy Conservation Opportunities

    Slide 24: Typical Energy Conservation Opportunities

    Typical Energy Conservation Opportunities  Conditioning Unoccupied Spaces  Maintaining Tighter Temperature Control than Required  Heating with 100% Outside Air Units

  25. Slide 25: Typical Energy Conservation Opportunities

    Slide 25: Typical Energy Conservation Opportunities

    Typical Energy Conservation Opportunities  Failed Hardware – Valves leaking past – Dampers not closing – Sensors out of calibration

  26. Slide 26: Cost of Commissioning

    Slide 26: Cost of Commissioning

    Cost of Commissioning  Major Projects (>$10,000,000) – 0.5-1.0% of Total Construction Cost – 2-4% of Construction Cost of Systems being Commissioned  Small Projects – Higher %

  27. Slide 27: Cost of Commissioning

    Slide 27: Cost of Commissioning

    Cost of Commissioning  “Shifted” instead of “Additional” Costs – Shift costs to design phase – Shift costs to commissioning process Without Commissioning Design Construction First Year of Operation Fine‐tuning With Commissioning Contractor Callbacks Design Construction and Cx Project Costs over Tim

  28. Slide 28: Cost Commissioning & Recommissioning

    Slide 28: Cost Commissioning & Recommissioning

    Cost Commissioning & Recommissioning Cost Non-Energy Median = per Sq. Energy SPB in Benefits Ft. Savings years (per Sq.Ft.) Existing $0.27 15% of whole 0.07 $0.18 Buildings building energy New $1.00 No before 4.8 $1.24 Construction measurement (Engineering possible estimates) Lawrence Berkeley Natio

  29. Slide 29: Cost of Recommissioning

    Slide 29: Cost of Recommissioning

    Cost of Recommissioning Project Type Size (1,000 sq ft) Cost ($/sq ft) Laboratory 10 1.00 Office 20 0.25 Laboratory 30 2.50 Office 60 0.42 Office 150 0.27 Office with TES 160 1.25 Multi-Building 360 0.17 Office 390 0.10 Office 400 0.19 Association of State Energy Research Technology Transfer Institu

  30. Slide 30: Cost of Recommissioning

    Slide 30: Cost of Recommissioning

    Cost of Recommissioning Savings/ Payback Building Cost Year (Years) Highrise Office $12,745 $8,145 1.6 Medical Facility $24,000 $63,502 0.4 Computer/Office $28,000 $30,385 0.9 Retail $52,336 $42,500 1.2 E-source study of 44 building ranging from 80,000 to 887,000 sq ft. Includes investigation, repor

  31. Slide 31: Cost of Recommissioning

    Slide 31: Cost of Recommissioning

    Cost of Recommissioning  Recommissioning Rebates – CenterPoint Energy – Xcel Energy  Study Rebates  Implementation Rebates

  32. Slide 32: Benefits of Commissioning

    Slide 32: Benefits of Commissioning

    Benefits of Commissioning  Improve Building Turnover Process from Contractor to Operator  Verify System Performance  Reduce Contractor & Designer Call-Backs  Long Term Proper Operation  Energy Conservation

  33. Slide 33: Benefits of Recommissioning

    Slide 33: Benefits of Recommissioning

    Benefits of Recommissioning  Optimized System Operation – Proper system performance – Energy conservation  Systems Documentation & Training  Sustained Efficient Operation

  34. Slide 34: Discussion

    Slide 34: Discussion

    Discussion Rebecca Ellis President Questions & Solutions Engineering, Inc. Chaska, Minnesota Rebecca.Ellis@QSEng.com 612-309-0503

  35. Slide 35: Thanks for attending!

    Slide 35: Thanks for attending!

    a CenterPoint. Energy Thanks for attending! Proprietary and Confidential Information + 2