Ora Banda Mining Ltd. · ASX:OBM

Ora Banda Mining — Precious Metals Summit 2020

27 slides from Ora Banda Mining's conference presentation, Sep 15, 2020

  1. Slide 1: Advancing Towards Production at Davyhurst

    For personal use only ADVANCING TOWARDS PRODUCTION AT DAVYHURST Investor Presentation – Precious Metals Summit 15 September 2020 1

  2. Slide 2: Important Notice

    IMPORTANT NOTICE No reliance: This presentation is a document that has been prepared by Ora Banda Mining Limited (“Company”, “OBM” or “Ora Banda”) for the purpose of providing a company and technical overview to interested investors. None of the Company, nor any of its related bodies corporate, thei

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS • Positioned to be Australia’s next gold producer For personal use only • Definitive Feasibility Study (DFS) 1 confirms Davyhurst as a financially robust development project – Initial ~5.2 year mine life with first gold pour forecast in Q1 CY 2021 – 81kozpa – average annual gol

  4. Slide 4: Corporate Overview

    CORPORATE OVERVIEW For personal use only Ora Banda Mining (ASX:OBM) Board of Directors Share Price (8 September 2020) A$/share $0.35 Peter Mansell • Corporate lawyer with over 40 years’ experience Shares on issue 1 M 838.4 Non-executive Chairman • Currently Non-executive Chairman of Energy Resources

  5. Slide 5: 1. Key DFS Outcomes

    For personal use only 1. KEY DFS OUTCOMES 5 5

  6. Slide 6: Compelling Financial Metrics

    COMPELLING FINANCIAL METRICS1 • Strong financial returns for a technically robust re-start Key DFS Outcomes Unit Base Case Spot Case For personal use only Gold price A$/oz 2,100 2,550 • First gold pour targeted for January 2021 Gold produced (LOM) Koz 418 • DFS base case of A$2,100/oz gold price Gol

  7. Slide 7: Near Term +80kozpa Producer

    NEAR TERM +80KOZPA PRODUCER1 • 81koz average annual gold production ANNUAL ORE TONNAGE & ORE GRADE MINED BY PIT For personal use only 1400 3 – Production target of 481koz over initial 5.2 year mine life 2.58 2.53 Ore Tonnage (t) 2.44 Ore Grade (g/t Au) Thousands 1200 2.5 • 28 week project delivery e

  8. Slide 8: Pre-Existing Infrastructure Enables Rapid Re-Start

    PRE-EXISTING INFRASTRUCTURE ENABLES RAPID RE-START • Significant existing infrastructure 1.2Mtpa Davyhurst Processing Plant For personal use only facilitates near term production with low capex: – Refurbished 1.2Mtpa conventional process plant (replacement cost ~$100m) – 172 person accommodation cam

  9. Slide 9: Pre-Production Capital Costs

    PRE-PRODUCTION CAPITAL COSTS • Significant existing infrastructure enables a rapid and Pre-Production Capital Costs A$M For personal use only low-capex path to production Processing plant – direct costs 8.7 • Total estimated capital cost of A$45 million (+/- 10% Processing plant – indirect costs 2.6

  10. Slide 10: 2. Mine Development Program

    For personal use only 2. MINE DEVELOPMENT PROGRAM 10 10

  11. Slide 11: Six Key Deposits to Underpin Production

    SIX KEY DEPOSITS TO UNDERPIN PRODUCTION1 1. Riverina (Open Pit & Underground) – 44km from Davyhurst For personal use only • Resource 3.7 Mt @ 2.7 g/t for 322 koz1 - Open Pit (3.0 Mt @ 1.9 g/t for 183 koz) + Underground (0.7 Mt @ 5.9 g/t for 139 koz) • Ore Reserve 1.4 Mt @ 1.8 g/t for 81 koz2 • Miner

  12. Slide 12: Six Key Deposits to Underpin Production

    SIX KEY DEPOSITS TO UNDERPIN PRODUCTION • DFS mine plan based on Ore Reserve of 6.1Mt @ 2.4g/t Au Mined Processed Grade Gold Produced AISC For personal use only DFS mining schedule Ore (kt) Ore (kt) (Au g/t) (koz) (A$/oz) for 460koz Au1 First production to 30 June 2021 530 500 2.2 35 1,615 • Convent

  13. Slide 13: Key Activities on Path to Production

    KEY ACTIVITIES ON PATH TO PRODUCTION Key Workstreams Q2 CY20 Q3 CY20 Q4 CY20 Q1 CY21 Q2 CY21 Q3 CY21 Q4 CY21 For personal use only DFS Definitive Feasibility Study Completed Mining Timeline Early Works Completed 1. Riverina Ore to RoM Pad Mining Timeline Early Works 2. Golden Eagle Ore to RoM Pad Mi

  14. Slide 14: Work in Progress

    WORK IN PROGRESS For personal use only Grade Control Drilling Program at Riverina in Progress New Secondary Feed Scaffold in Tank to Furnace & Carbon Open Pit Mining Hopper Wing Wall Refurbish Agitator Reactivation Kiln Fleet for Riverina Mobilising Overhauling Secondary & Tertiary Crushers 14

  15. Slide 15: 3. Ongoing Exploration Programs

    For personal use only 3. ONGOING EXPLORATION PROGRAMS 15 15

  16. Slide 16: Riverina South - An Advanced Near Mine Prospect

    RIVERINA SOUTH - AN ADVANCED NEAR MINE PROSPECT Exploration Riverina South Prospect – Adjoins Riverina Open pit For personal use only • Confirmed extension to Riverina Main Lode mineralisation, remains open along strike to the south and at depth • Maiden resource estimation scheduled for September 2

  17. Slide 17: Exploration Potential - Multiple Regional Prospects

    EXPLORATION POTENTIAL – MULTIPLE REGIONAL PROSPECTS Exploration Large landholding covering 1,350km2 and many kms of prospective strike For personal use only Tenement consolidation occurred in 2007, but no coherent exploration effort undertaken as yet High priority targets include well-defined but po

  18. Slide 18: Appendices

    18 For personal use only APPENDICES 18

  19. Slide 19: Riverina

    1 RIVERINA Mine Development Riverina - Open Pit & Underground Riverina For personal use only Isometric view looking north-west • Resource 3.7 Mt @ 2.7 g/t for 322 koz1 - Open Pit 3.0 Mt @ 1.9 g/t for 183 koz - Underground 0.7 Mt @ 5.9 g/t for 139 koz • Ore Reserve 1.4 Mt @ 1.8 g/t for 81 koz2 • Loca

  20. Slide 20: Golden Eagle

    2 GOLDEN EAGLE Mine Development Golden Eagle - Underground For personal use only • Resource 0.4 Mt @ 3.9 g/t for 49 koz1 Golden Eagle Long Section • Ore Reserve 0.1 Mt @ 3.8 g/t for 16 koz2 • Located 2 km from Davyhurst Process Plant • Substantial development complete (mine developed to 150m vertica

  21. Slide 21: Missouri

    3 MISSOURI Mine Development Missouri Missouri - Open Pit & Underground For personal use only Isometric view looking north-west • Resource 2.1 Mt @ 3.4 g/t for 227 koz1 • Ore Reserve 1.5 Mt @ 2.6 g/t for 130 koz2 • Located 37 km from Davyhurst Process Plant Missouri Mine Design Showing pit design & m

  22. Slide 22: Sand King

    4 SAND KING Mine Development Sand King - Open Pit & Underground For personal use only Sand King Mine Design • Resource 2.5 Mt @ 3.5 g/t for 286 koz1 Showing pit design & mineralisation wireframes • Ore Reserve 1.3 Mt @ 2.6 g/t for 110 koz2 Isometric view looking north-west • Located 37 km from Davyh

  23. Slide 23: Waihi

    5 WAIHI Mine Development Waihi - Open Pit & Underground For personal use only • Resource 2.5 Mt @ 2.6 g/t for 206 koz1 - Open Pit 2.1 Mt @ 2.4 g/t for 159 koz - Underground 0.4 Mt @ 3.8 g/t for 47 koz • Ore Reserve 1.5 Mt @ 2.3 g/t for 110 koz2 • Located 3 km from Davyhurst Process Plant • Undergrou

  24. Slide 24: Callion

    6 CALLION Mine Development Callion - Open Pit & Underground For personal use only • Resource 0.7 Mt @ 4.9 g/t for 107 koz1 • Ore Reserve 0.2 Mt @ 2.6 g/t for 21 koz2 • Located 14 km from Davyhurst Process Plant • High grade underground potential 1. Refer to Appendix (Slides 24 and 25) - Mineral Reso

  25. Slide 25: Appendix A - Ore Reserve Table

    APPENDIX A – ORE RESERVE TABLE For personal use only PROVED PROBABLE TOTAL MATERIAL PROJECT ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000oz.) Sand King - - 1,300 2.6 1,300 2.6 110 Missouri - - 1,500 2.6 1,500 2.6 130 Riverina Open Pit - - 1,400 1.8 1,400 1.8 81 Golden Eagle - - 130 3.8 13

  26. Slide 26: Appendix B - Mineral Resource Table

    APPENDIX B – MINERAL RESOURCE TABLE For personal use only Notes: 1. The Missouri, Sand King, Riverina, Waihi, Callion & Golden Eagle Mineral Resources have been updated in accordance with all relevant aspects of the JORC code 2012, and initially released to the market on 15 December 2016 & 26 May 20

  27. Slide 27: David Quinlivan, Managing Director

    For personal use only David Quinlivan Managing Director Email: info@orabandamining.com.au Phone: +61 8 6365 4548 27

Ora Banda Mining — Precious Metals Summit 2020 on 6ix