Harmony Gold Mining Co. Ltd. · JSE:HAR

Harmony Gold Mining — Technical Presentation (March 2012)

43 slides from Harmony Gold Mining's technical presentation, Mar 13, 2012

  1. Slide 1: Doornkop site visit

    Doornkop site visit Jacques du Triou General manager Wednesday 13 March 2012 www.harmony.co.za

  2. Slide 2: Safe Harbour Statement

    Private Securities Litigation Reform Act Safe Harbour Statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and 21E of the Securities Exchange Act of 1934, as amended, that are intended to be covered by the safe

  3. Slide 3: Welcome and introduction

    Welcome and introduction www.harmony.co.za

  4. Slide 4: Agenda

    Agenda Activity Time Arrival and Coffee 07H25 to 08H00 Welcome and induction training 08H00 to 08H20 Change into underground clothing 08H20 to 08H45 Proceed to Lamp house and Sky Bank 08H45 to 09H00 Descent to 76 level Station – 30 minute discussion 09H00 to 09H45 Descent to 197 level Station – 30 m

  5. Slide 5: Doornkop management team

    Doornkop management team Name Designation Jacques Du Triou General Manager Rickus Nel Financial Manager Charel Olivier Ore Reserve Manager Ernest Carney Human Resources Leader Elvis Maribe Mining Manager Berty Thompson Shaft Engineer Carel Oosthuizen Production Engineer Danie Human Chief Safety Offi

  6. Slide 6: Safety induction and training

    Safety induction and training www.harmony.co.za

  7. Slide 7: Proceed to change house and underground

    Proceed to change house and underground

  8. Slide 8: Background information

    Background information www.harmony.co.za

  9. Slide 9: Historical overview

    Historical overview • Exploration at Doornkop started in the 1930‟s • Doornkop shaft was sunk to 1 127m below collar by 1983 and the first gold pour took place in 1986* • After several stoppages the main shaft deepening to access the South Reef commenced in 2004* • The main shaft deepening to final

  10. Slide 10: Doornkop's location and overview

    Doornkop‟s location and overview • Located 30 kilometers west of Johannesburg in Gauteng, Doornkop is a single-shaft operation mining to a depth of just less than 2 000m • Doornkop mines the Kimberley and South reefs by means of both narrow-reef conventional mining and mechanised board-and-pillar mi

  11. Slide 11: Infrastructure

    Infrastructure Plant Office Shaft Hostel 11 www.harmony.co.za

  12. Slide 12: Workplaces visited: 76 level

    Workplaces visited: 76 level 12 www.harmony.co.za

  13. Slide 13: Workplaces visited: 197 level

    Workplaces visited: 197 level 13 www.harmony.co.za

  14. Slide 14: Surface area visited: Rock winder

    Surface area visited: Rock winder 14 www.harmony.co.za

  15. Slide 15: Surface area visited: Processing plant

    Surface area visited: Processing plant 15 www.harmony.co.za

  16. Slide 16: Shaft schematic

    Shaft schematic Old mine New mine 16 www.harmony.co.za

  17. Slide 17: Benefits of Doornkop's shaft infrastructure

    Benefits of Doornkop‟s shaft infrastructure As a medium depth shaft the infrastructure is • Uncomplicated • Modern with reliable applicable technology • Energy efficient • Has sufficient buffer capacity for flexibility • Will have a low operating cost 17 www.harmony.co.za

  18. Slide 18: Shaft configuration

    Shaft configuration Shaft configuration 400nb Pump Columns 50nb Potable 212 to 106 Level Water Column 15.5 Ton Skip 300nb Service Water Columns 100nb Mud Column 212 to 126 Level 11 Ton Skip and 3 Deck Man Cage Cage (Dual Purpose) 11 Ton Skip and 3 Deck Man Cage Cage (Dual Purpose) 2 X 150nb Air Colu

  19. Slide 19: Shaft schematic – South reef

    Shaft schematic – South reef 19 www.harmony.co.za

  20. Slide 20: Rock handling system

    Rock handling system Rock flow Hoppers 202 level Tip Ore pass Silo Reef & Waste conveyors To Surface 207 level Waste Reef silo silo 212 Level Belt feeders Reef & Waste conveyors Chute system Weighing flask Discharge chutes Skip 20 www.harmony.co.za

  21. Slide 21: Water system

    Water system Water reticulation Water to Feed mining areas control 192 Level dam Water to Feed mining areas control Drain hole Water to Feed mining areas control Launder to settlers 2 x Settlers 207 Level dams 207 Level pumping 6 x Circulating pumps 2 x Dewatering pumps not shown 2 x Mud pumps not s

  22. Slide 22: Doornkop: Stratigraphic column

    Doornkop: Stratigraphic column 22 www.harmony.co.za

  23. Slide 23: Doornkop: Stratigraphic column | continued

    Doornkop: Stratigraphic column | continued 23 www.harmony.co.za

  24. Slide 24: Dual sink nearing - 212 level

    Dual sink nearing - 212 level 24 www.harmony.co.za

  25. Slide 25: Then….solid bottom sinking 212L

    Then….solid bottom sinking 212L 25 www.harmony.co.za

  26. Slide 26: Values, safety and safety initiatives

    Values, safety and safety initiatives www.harmony.co.za

  27. Slide 27: Our values

    Our values • Safety is our number 1 priority • Commitment • Accountability • Honesty • Discipline • Respect • Teamwork − From September 2008 quarterly value surveys are performed to establish weather management and supervisors are still abiding to these values − Formal feedback is given to all super

  28. Slide 28: Safety: programs and initiatives

    Safety: programs and initiatives Behavioral safety program • We initiated our „Siyanqoba‟ program in 2007 with the support of our Unions and Associations and has never looked back • Initially all crews and their supervisors attended a three day course that covered various behavioral topics. • Today

  29. Slide 29: Safety: programs and initiatives | continued

    Safety: programs and initiatives | continued Training • Research was conducted into the latest training methodologies and it was decided to adopt E-Learning on Doornkop in late 2006 due to the versatility and reliability of the system • Our first learners went through E-Learning in 2008 and a study

  30. Slide 30: Safety achievements

    Safety achievements 1 000 000 Fatality free shifts 14 August 2009 1 000 000 Fatality free shifts 21 September 2010 1 500 000 Fatality free shifts 7 April 2011 4 000 000 Fall of ground (FOG) fatality free shifts 19 April 2011 Best safety improvement - shield 2008 Best FOG improvement – shield 2008 Be

  31. Slide 31: Lost Time Injury Frequency Rate (LTIFR)

    Lost Time Injury Frequency Rate (LTIFR) 35 30 25 20 15 10 5 0 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 Jul Aug Sep Oct Nov Dec Jan Feb YTD 11 11 11 11 11 11 12 12 YTD: Year to date 31 www.harmony.co.za

  32. Slide 32: Reserves, resources and production figures

    Reserves, resources and production figures www.harmony.co.za

  33. Slide 33: Mineral Reserves and Resources (30 June 2011)

    Mineral Reserves and Resources (30 June 2011) Tonnes Gold Gold Operations (Mt) (g/t) (000kg) (000oz) Total Mineral Resources Kimberly Reef 11.5 2.37 27 879 South Reef 23.1 8.25 191 6 137 Grand Total 34.6 6.30 218 7 016 Total Mineral Reserves Kimberly Reef 5.4 2.23 12 390 South Reef 3.2 5.33 17 552 G

  34. Slide 34: Key production statistics (annually)

    Key production statistics (annually) Production FY11 FY10 FY09 ‟000 (metric) 718 540 549 Volumes milled ‟000 (imperial) 792 595 605 kg 2 512 1 950 1 311 Gold produced oz 80 763 62 694 42 150 g/t 3.50 3.61 2.38 Average grade Oz/t 0.102 0.105 0.070 Financial R million 781 517 343 Revenue US$ million 1

  35. Slide 35: Statistics | continued

    Statistics | continued FY11 FY10 People Number of employees Employees 2 838 1 645 Contractors 853 1 004 Total 3 691 2 649 HDSA in management % 35 38 Women in mining % 9 8 Training & dev. expenditure R million 19 10 Safety Fatalities 0 2 LTIFR Per million hours worked 8.04 5.50 Environment Electricit

  36. Slide 36: Production and cash operating costs (R/kg)

    Production and cash operating costs (R/kg) Kg’s R/kg 1 000 300 000 900 250 000 800 700 200 000 600 500 150 000 400 100 000 300 200 50 000 100 - - Dec 08 Mar 09 Jun 09 Sep 09 Dec 09 Mar 10 Jun 10 Sep 10 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 Kilograms produced R/kg cash operating cost Linear (Kilograms p

  37. Slide 37: Latest quarterly results (Q2 of FY12)

    Latest quarterly results (Q2 of FY12) Indicator Units Dec 2011 Sept 2011 % variance Tonnes 000 232 277 (16) Grade g/t 3.87 3.13 24 Gold produced Kg 897 866 4 Cash operating costs R/kg 237 007 270 487 12 Operating profit R‟000 179 225 118 607 51 37 www.harmony.co.za

  38. Slide 38: Upgrade of infrastructure at the South reef

    Upgrade of infrastructure at the South reef • Press release 17 February 2012 • The build-up in production on the South reef reached a plateau • Design changes were required and ways of improving production from the South reef • Production at South reef was stopped for 17 days at end of February 2012

  39. Slide 39: Development and the way forward

    Development and the way forward www.harmony.co.za

  40. Slide 40: Development metres and square metres mined

    Development metres and square metres mined Development metres Square metres mined 1 300 19 000 1 200 17 000 1 100 15 000 1 000 13 000 900 800 11 000 700 9 000 600 7 000 500 5 000 Feb-11 Sep-11 Jan-11 Apr-11 Jul-11 Nov-11 Mar-11 Aug-11 Dec-11 Jun-11 Oct-11 May-11 Dec-11 Jan-11 Apr-11 Jul-11 Feb-11 Ma

  41. Slide 41: The way forward

    The way forward • Expected potential ounces: 190 000-220 000oz • Cash operating cost* R/kg: R200 000-220 000/kg • Cash operating cost* US$/oz: US$820-905/oz • Life of mine (LOM) ~14 years *Future costs are calculated in real terms and using an exchange rate of R7.57/US$ 41 www.harmony.co.za

  42. Slide 42: Thank you for visiting Doornkop

    Thank you for visiting Doornkop www.harmony.co.za

  43. Slide 43: An exciting investment proposition

    Henrika Basterfield Investor Relations Officer Tel: +27 (0)11 411 2314 Mobile: +27 (0)82 759 1775 Email: henrika@harmony.co.za Marian van der Walt Executive: Corporate and Investor Relations Tel: +27 (0)11 411 2037 Mobile: +27 (0)82 888 1242 Email: marian@harmony.co.za An exciting investment proposi

Harmony Gold Mining — Technical Presentation (March 2012) on 6ix