Titan Mining Corp. · TSX:TI

Titan Mining — Investor Presentation (January 2025)

23 slides from Titan Mining's investor presentation, January 2025

  1. Slide 1: Investor Presentation

    BUILT FOR GROWTH Investor Presentation JANUARY 2025 | TSX: TI 1

  2. Slide 2: Forward Looking Information

    INVESTOR PRESENTATION FORWARD LOOKING INFORMATION This presentation contains "forward-looking information" within the meaning of Canadian securities laws. In some cases, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "targets", "expects", "is

  3. Slide 3: Track Record of Value Creation

    INVESTOR PRESENTATION 2025 Augusta Group Companies(2) Track Record of Value Creation C$41M Market Cap Past Augusta Group Company Returns TSX: TI C$105M Market Cap TSX: G 12,960% 3,300% 1,000% 6,100% OTCQB: AUGG Return Return Return Return SOLD for $1.6B SOLD for $667M $1.6B Market Cap(1) SOLD for $2

  4. Slide 4: A Best-in-class Leadership Team

    INVESTOR PRESENTATION A Best-in-class PROVEN SUCCESS Leadership Team Mine development, operational excellence & Richard Warke EXECUTIVE CHAIRMAN Governor George Pataki DIRECTOR innovation Consistent record of creating shareholder value at Augusta Served three terms as the 53rd Governor of the State

  5. Slide 5: Capital Structure

    INVESTOR PRESENTATION Capital Structure Optimizing cash flow and focused on de- Shareholder Distribution(3)(4) leveraging High insider ownership Unique positioning: junior with steady-state cash flow, significant exploration upside and critical metals strategic positioning CAPITAL STRUCTURE Toronto

  6. Slide 6: Investment Highlights

    INVESTOR PRESENTATION acres of mineral rights Investment Highlights controlled throughout the district U.S production base in upstate Significant graphite discovery at New York Empire State Mine’s (ESM)’s Existing infrastructure includes property 5,000 tpd mill, skilled The Kilbourne Graphite Projec

  7. Slide 7: Zinc: 2024 Guidance - Production and Cost

    INVESTOR PRESENTATION 2024 ZINC GUIDANCE- PRODUCTION AND COST Payable Production Zinc 56-60 Million lbs Zinc C1 Cash Cost (1) 0.98 - 1.02 per lb Exceeded 2023 guidance of 54-58M lbs AISC(1) 1.04 - 1.10 per lb 61M lbs zinc produced in 2023, up 16% YoY Sustaining Capital US$3 - US5$ Million US$38m in

  8. Slide 8: Zinc: ESM #4 Mine, N2D and Turnpike

    INVESTOR PRESENTATION ESM #4 Mine, N2D and Turnpike Zinc Near term resource expansion and opportunities to increase production #4 Mine – mineralized zones generally plunge to northeast; potential to extend zones up and down-plunge - Underground exploration drilling following up on intercepted minera

  9. Slide 9: Regional Surface Exploration - Planning

    INVESTOR PRESENTATION Regional Surface Exploration - Planning Drilling - Targeting undertested historic Zn mineralization, productive geologic units, and untested Zn anomalies in soil and rock Prioritization of targets within proximity to existing ESM infrastructure Goal of +31,000 ft of surface dri

  10. Slide 10: Zinc: Consistent Resource Replacement and Expansion

    INVESTOR PRESENTATION Zinc Consistent Resource Replacement and Expansion Underground Drilling at ESM Drill core from N2D Continued Growth by Increased Mine Life the Drill Bit UNDERGROUND AS OF JULY 16, 2024 Titan expects to expand its mineral Contained zinc in 2024 MRE Tons (000’s US Contained Pound

  11. Slide 11: Kilbourne Graphite Maiden Resource

    INVESTOR PRESENTATION Kilbourne Graphite Maiden Resource Strengthening the domestic critical minerals supply chain Open ~8,000 ft Open-pit constrained inferred resource of 22 million tons at an average grade of 2.91% Cg (based on a cut off grade of 1.50%) 653 kt of contained graphite within inferred

  12. Slide 12: Potential Long-life Open Pit Resource

    INVESTOR PRESENTATION Graphite Mineral Resource Estimate Classification Deposit Cut-Off Grade (% Cg) Tonnage (‘000 Ton) Grade (% Cg) Contained Graphite (‘000 Ton) Potential Long-life Inferred Kilbourne 1.50 22,423 2.91 653 Open Pit Resource Based on 45 surface diamond drill holes Mining cost of $4.6

  13. Slide 13: Price Sensitivities and Kilbourne Graphite Product Segments

    INVESTOR PRESENTATION PRICING SENSITIVITIES – KILBOURNE MINERAL RESOURCE Price Sensitivities $USD per Ton Concentrate RF Graphite [%] Mill Feed [k Ton] Contained Graphite [k Ton] Waste [k Ton] Overburden [k Ton] and Kilbourne 872.00 0.80 3.30 7,198 238 4,810 3,532 Graphite Product 926.50 981.00 0.85

  14. Slide 14: Metallurgy

    INVESTOR PRESENTATION Phase III-SGS (1) Assays (%) Composite C(t) C(g) Metallurgy Master 3.48 3.14 Process Optimization completed at SGS Lakefield for Master North Shallow 3.38 3.21 Composites and Variability Composites South Shallow 3.51 3.28 Master & Variability Composite Head Grades North Deep 2.

  15. Slide 15: Natural Flake Graphite Processing Facility

    INVESTOR PRESENTATION Natural Flake Graphite Processing Facility (the “Facility") Facility key objectives Product Qualification Path to full scale commercialization Operating Parameters 60,000 tons per annum throughput @ 2.91% Cg grade 85% assumed recoveries (accounting for ramp up), 75% availabilit

  16. Slide 16: Graphite Development Plan and Indicative Timeline

    INVESTOR PRESENTATION Graphite Development Plan and Indicative Timeline Year 0 Year 1 Year 2 & 3 (Scale Up)(1) Resource declaration (Q4 2024) Infill drilling of resource to FEED/Detailed engineering Technical measured & indicated status Metallurgy Phase III Equipment orders Facility Design & Commenc

  17. Slide 17: Graphite - Demand by Type and Region

    INVESTOR PRESENTATION Graphite - Demand by Type and Region NATURAL FLAKE GRAPHITE DEMAND BY GEOGRAPHY (MILLION MT) GRAPHITE MARKET DEMAND FORECAST BY APPLICATION Titan Start of Customer Deliveries and Facility Production No domestic commercial producers of China is expected to control 82% of The US

  18. Slide 18: Near Term Catalysts

    INVESTOR PRESENTATION Near Term Catalysts Zinc • District exploration plans • Exploration and Exploration and production updates • FY 25 production Guidance production updates Q1 2025 H2 2025 • Final engineering/PDC • Targeted start of • PEA on Kilbourne >> 20,000t and 40,000t processing Graphite Eq

  19. Slide 19: Appendix

    2 Oo c o 2. ro¥ <x

  20. Slide 20: History of Exploration Success

    INVESTOR PRESENTATION History of Long production history with numerous discoveries exploration Pierrepont (1979) Hyatt (1917) 120,000 #4 (1965) #2 (1927) #3 (1946) Titan Opens ESM Edwards (1903) NE Fowler (#4) success Taylor (Hyatt) New Fold (#4) West Branch (Hyatt) Mahler (#4) Mud Pond / Davis (#4)

  21. Slide 21: Our Approach to Sustainability

    INVESTOR PRESENTATION Our Approach to Committed to localization and building partnerships that deliver long-term mutual benefits Sustainability 1 2 3 Employees uphold integrity, trust, and Community Environmental Integrity commitment to community as well as Involvement and Social and Trust Stewardsh

  22. Slide 22: Scientific and Technical Information

    INVESTOR PRESENTATION SCIENTIFIC AND TECHNICAL INFORMATION The scientific and technical information contained in this presentation relating to the Empire State Mines Zinc operations was based upon the technical report titled "Empire State Mines 2024 NI 43-101 Technical Report Update Gouverneur, New

  23. Slide 23: Vancouver and Toronto Offices

    TSX: TI | BUILT FOR GROWTH VANCOUVER TORONTO Suite 555 - 999 Canada Place Suite 2915 - 181 Bay Street Vancouver, BC Canada, Toronto, ON V6C 3E1 Canada, M5J 2T3 info@titanminingcorp.com info@titanminingcorp.com 604-687-1717 416-366-5678 VISIT US AT TITANMININGCORP.COM

Titan Mining — Investor Presentation (January 2025) on 6ix