Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (May 2017)

24 slides from Yancoal Australia's corporate update, May 22, 2017

  1. Slide 1: Mount Thorley Warkworth Community Consultative Committee

    Mount Thorley Warkworth Community Consultative Committee Monday 22 May 2017 Independent Chair: Col Gellatly

  2. Slide 2: Agenda

    Agenda 1. Welcome 2. Apologies 3. Declaration of pecuniary interests / conflicts of interest 4. Correspondence 5. Matters arising from previous meeting (Actions) 6. Company reports 7. 2016 MTW Annual Review 8. Community feedback 9. General business & Future Dates

  3. Slide 3: Welcome

    Managed by Rio Tinto Coal Australia You are here Admffistration Office ACTION TO BE TAKEN ON DISCOVERING A FIRE OR OTHER EMERGENCY 1, ALERT PERSONS NEARBY OF THE SITUATION. 2. EXTINGUISH THE FIRE IF ABLE TO DO SO WITH SAFETY 9. IF NOT ABLE TO PERFORM 2) NOTIFY RECEPTION OF THE EMERGENCY 3, FOLLOW TH

  4. Slide 4: Apologies & others

    2.0 Apologies & others Apologies Hollee Jenkins (Late) Ian Hedley

  5. Slide 5: Declaration of interests

    3.0 Declaration of interests Source: Guidelines for establishing and operating community consultative committees for mining projects, June 2007

  6. Slide 6: Correspondence

    5.0 Correspondence 5.1 Business papers 5.2 Previous Minutes

  7. Slide 7: Matters arising from previous meetings

    6.0 Matters arising from previous meetings Item Action 1 MTW to provide some examples of past blasts; from planning stages to detonation; and provide detail on what the Blast Fume Model had predicted along with other data that had also been taken into consideration at the time by the decision makers

  8. Slide 8: Matters arising from previous meetings (continued)

    Item Action 6 Meeting Minutes to be re-distributed to members after the comments period close as "Endorsed by Chair - Pending Confirmation". The current process of ratifying them at the subsequent meeting is to remain in place. [Complete: See last minutes.] 7 MTW to provide some instructions to the

  9. Slide 9: Company Reports

    7.0 Company Reports 7.1 GM Overview of activities Colin Mackey – General Manager

  10. Slide 10: GM overview of activities

    • Wallaby Scrub Road – Aboriginal Land Rights Claim – Crown Land • VPA • Putty Road Underpass • Tailings Dam 2 Capping • Acquisitions • Yancoal

  11. Slide 11: Operational Update – Safety Snapshot

    Operational Update – Safety Snapshot AIFR YTD 2017 Injuries Year to Date: 0.63 25/01/17 – CHPP maintainer laceration to index finger requiring stitches (MTC) LTIFR YTD 2017 20/02/17 – Projects operator hits head and receives lower back and neck injury(LTI) 0.21 15/03/17 – CHPP maintainer receives la

  12. Slide 12: Blasting Overview

    Blasting Overview • 29 large blasts since last meeting. • 23 followed EnvMet Predictions. • Wind was in a more favourable direction which allowed these blasts to proceed. • All blasts must be fired in accordance to the Blasting Permissions page as well as on-the-ground verifications from the blastin

  13. Slide 13: Operational Update: 2017 Rehabilitation

    Operational Update 2017 Rehabilitation Rehabilitation target for 2017 = 122 ha (outlined in red) Works completed 2017: 59.1 ha bulk shaped 33.4 ha topsoiled 31.6 ha composted Planning to seed 20ha in May Currently targeting the South Pit area. • Shaping South Pit South • Filling and shaping the Trai

  14. Slide 14: Operational Downtime

    Operational Downtime Truck 2017 = 2188.03 hours Shovel 2016 = 1866.09 hours RT Dozer Grader 2017 Drill 2016 Dragline • Less noise downtime and more dust Dozer downtime. 0 200 400 600 800 1000 1200 1400 1600 • Boom spray trial on Hours dragline Noise # CRO Assessments # Individual assessment above #

  15. Slide 15: Inter-Agency Audit Program on Dam Safety

    Inter-Agency Audit Program on Dam Safety • NSW EPA findings • Department of Planning and Environment – 1 non-compliance. (Dam 5S needs de-silting) – 16 Compliant. 15 Presentation title 22 May 2017

  16. Slide 16: Department of Industry

    • Department of Industry 16 Presentation title 22 May 2017

  17. Slide 17: Community Development: Social Impact Management Plan

    Community Development • Social Impact Management Plan (SIMP) • Thanks for your time and feedback on the draft SIMP • Consolidating feedback ahead of a community drop-in style session tentatively planned for June • Common feedback/areas of priority have included: – Property values in the Bulga area –

  18. Slide 18: Community Development Fund programmes

    Programme Partner Value Community Development Enterprise Facilitation Sirolli Institute Fund $45,000 $80,000 Upper Hunter Where There’s A UHWTAWF – Positive Education Program Will Foundation • CDF Science and Enginnering Challenge, and University of Newcastle $83,952 SMART Program (2015-2017) $60,00

  19. Slide 19: Site Donations

    Site Donations • Rotary Club of Singleton on Hunter – 2017 Singleton Art Prize - $5,000 • Australian Families of the Military – Mental Health Retreat - $600 • Wildlife Aid Inc - $2,000 • Singleton Business Chamber - International Women's Day event - $775 • Cancer Council NSW – Singleton Relay for Li

  20. Slide 20: Community Development: Workforce residence

    Community Development • 2,703 people (incl. contractors) working across the Hunter Valley • 25% reside within the Singleton Shire Port Stephens 6% Rest of NSW 6% Singleton 25% Lake Macquarie 9% Newcastle 8% Muswellbrook 6% Upper Hunter 2% Cessnock 11% Maitland 26% 20 Presentation title 22 May 2017

  21. Slide 21: General Business

    8.0 General Business 8.1 2016 MTW Annual Review

  22. Slide 22: Feedback from community representatives

    9.0 Feedback from community representatives

  23. Slide 23: Future Dates

    10.0 Future Dates 10.1 Next Meeting (confirm today) 14th August 2017 14:00-16:00 Warkworth Boardroom Focus Topic Suggestions?

  24. Slide 24: End of meeting

    End of meeting – please travel safely

Yancoal Australia — Corporate Update (May 2017) on 6ix