18 slides from Prospex Energy's investor presentation, April 2022

  1. Slide 1: Prospex Energy plc Corporate Presentation

    Prospex Energy plc Corporate Presentation AIM : PXEN April 2022

  2. Slide 2: Disclaimer

    DISCLAIMER This Presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities nor shall it or any part of it form the basis of or be relied on in connection with, or act as any inducement to enter into, any contract or commitm

  3. Slide 3: Recent High Impact Events

    RECENT HIGH IMPACT EVENTS Higher-than-predicted revenue generation from our Spanish assets due to historically high electricity prices. Spanish subsidiary now significantly cash- positive Government approval and completion of acquisition of UOG’s 20% share in the Selva field in Italy, bringing PXEN’

  4. Slide 4: Poised for Growth

    POISED FOR GROWTH GROWTH IN ITALY ▪ The enlarged interest in the Italian asset is projected to generate net cashflows of €2.6 million per year, according to the CGG CPR, calculated at 2019 gas prices ▪ Using current forward curve gas price predictions (ICE TTF) the 2023 net annual cashflow figure is

  5. Slide 5: Multiple Paths to Income

    MULTIPLE PATHS TO INCOME GENERATION AND OPTIMISATION • Electricity Sales from the El Romeral Power Plant • Automation of the Power Plant for around-the- clock power generation • Gas Sales from the Selva field in Italy • Multi-well campaign submitted for environmental approval to grow our Spanish res

  6. Slide 6: About Prospex

    ABOUT PROSPEX AIM listed natural gas production and power generation investment company (AIM:PXEN) Spain: Ongoing Production & Power Generation ►8.1MW power station generating revenue at record-high electricity prices, allowing loan repayments to Prospex ►Plant upgrade completed to allow 24/7 power

  7. Slide 7: Assets: Italy and Spain

    O.nospex ENERGY PLG Assets: Italy and Spain

  8. Slide 8: Italy – Podere Gallina

    ITALY – PODERE GALLINA Proven GAS RESERVES in prolific Po Valley region ► Podere Gallina is a 331km2 exploration permit with multiple prospects ► PXEN farmed-in to 17% in October 2017 ► Podere Maiar (PM-1) discovery well drilled in December 2017 ► Well tested gas to surface in January 2018 from 2 in

  9. Slide 9: Selva Gas Production

    SELVA GAS PRODUCTION STEPS TO GETTING ON PRODUCTION ►Preliminary production concession, approved Feb 2019 ►Technical environmental approval, approved Jan 2020 & Nov 2020 ►Environment Minister Decree, approved April 2021 ►INTESA (Intergovernmental agreement) ongoing, target Q2 2022 ►Final Production

  10. Slide 10: El Romeral: Production & Development Project

    EL ROMERAL: PRODUCTION & DEVELOPMENT PROJECT HISTORY ►Since 1983, 7 wells drilled resulted in gas discoveries ►5 went on production from 2002 ►2 proven undeveloped discoveries (PUDs) Uceda El Romeral Power Station El Romeral-3 CURRENT Aventurado North ►Production from 2 wells ►Record-high electricit

  11. Slide 11: El Romeral: Gas Ready for Development

    EL ROMERAL: GAS READY FOR DEVELOPMENT ►VERY LOW RISK Prospective Resources (NSAI-certified 2019) in El Romeral - ready for development ► 11 selected prospect locations, 19 drilling locations, over 3 production 1U 2U 3U PROSPECTIVE RESOURCES (Bcf)* licences 45.0 ► 2 PUDs (5 Bcf, 2C resources) 40.0 48

  12. Slide 12: Spain – Tesorillo Project

    SPAIN – TESORILLO PROJECT POTENTIAL UNDEVELOPED DISCOVERY ►PERMIT TEMPORARILY SUSPENDED, awaits Ministry resolution and reinstatement as production licence ►Contains the Almarchal-1 gas discovery well (drilled in 1957) which logged 212m of net gas pay. Multiple DST’s flowed gas to surface ►Operated

  13. Slide 13: The Team; Outlook & Objectives

    The Team Outlook & Objectives

  14. Slide 14: Outlook for 2022-2023

    OUTLOOK FOR 2022-2023 2022 2023 Q1 Q2 Q3 Q4 Q1 Q2 OTHER BUSINESS DEVELOPMENT OPPORTUNITIES (INCLUDING SOLAR PROJECTS) EL ROMERAL PERMITTING & PLANNING MULTIWELL CAMPAIGN SPAIN INCREASE ELECTRICITY PRODUCTION REVENUES TESORILLO – WELL DESIGN AND PERMITTING; GEOLOGY + GEOPHYSICS INTEGRATION; FIELDWORK

  15. Slide 15: Summary

    SUMMARY Investment case: Unlocking shareholder value: ►Secured reserves/commercial revenue generation in 2021 ►Diversified portfolio assembled ►Rising share price in response to commodity prices and loan ►Risk managed repayments, still trading at discount to market valuation ►Multiple routes to sign

  16. Slide 16: Reserves and Resources

    RESERVES AND RESOURCES Net 2P Reserves Net Contingent Resources Net Prospective Resources Podere Gallina, El Romeral, 0.15 Tarazona, 0.9 33.9 Romeral Prospects, 44.8 Tesorillo 15%, 124.6 North Selva – Romeral-4S, 1.6 Level B, 3.3 5.11 Bcf 7.72 Bcf 494 Bcf Tesorillo 35%, Italy, 4.96 290.64 South Selv

  17. Slide 17: The Team

    THE TEAM Mark Routh CEO & Managing Director Mark is a Petroleum Engineer with more than 40 years of experience in the oil & gas industry. He has an MSc in Petroleum Engineering. He spent eight years as CEO/Chairman of AIM listed IOG plc. Founded CH4 Energy in 2002, which was focused on gas in NW Eur

  18. Slide 18: Thank you