  1. Slide 1: A significant potash development in an established mining jurisdiction

    A significant potash development in an established mining jurisdiction

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Certain statements in this presentation may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation, or industry results, to be materia

  3. Slide 3: Strategy to build a 2 million tonnes per year potash facility

    strategy to build a 2 million tonnes per year potash facility p y • phased construction plan • lower l capex than th a conventional ti l mine i 2

  4. Slide 4: Investment highlights

    Investment highlights • Strong potash industry fundamentals • Attractive jurisdiction with existing infrastructure • Significant potash resource • Attractive project profile • Carnallite resource amenable to solution mining • Keyy p project j milestone: completed p NI 43-101 compliant p scoping p g

  5. Slide 5: Significant Growth Expected in Potash Demand

    Significant Growth Expected in Potash Demand Demand for Potash Drivers KCl(mmt) 80  Increasing world population 70 60  Changing g g diet p profile in 50 developing world 40 30  Decreasing arable land 20 10  Increasing use of biofuels 0 2018 2010 2011 2012 2013 2014 2015 2016 2017 2019 2000 2001

  6. Slide 6: An Established Potash Mining Jurisdiction

    An Established Potash Mining Jurisdiction N SASKATCHEWAN Saskatoon PCS PCS Cory Patience Lake Agrium Vanscoy Town of SASKATCHEWAN PCS Mosaic Wynyard Allan Colonsay PCS Karnalyte Lanigan Ca Resources na KP 360 (T Ye ra llo dian ns w – he Pa Ca a d ci na H fi c 0 25 50 75 100 km d w Ra Highways Railwa

  7. Slide 7: Significant Mineral Resource

    Significant Mineral Resource Resources KCl KCl Resource Category Grade Range % mmt Indicated 13%–17% 56.2 Inferred 13%–19% 186.3 Drill Hole o e Su Summary a y Sc Schematics e at cs Source: Preliminary Assessment, Wynyard Carnallite Project, Subsurface Mineral Permit KP 360, Saskatchewan, Canada, Aug

  8. Slide 8: Carnallite Resource Amenable to Solution Mining

    Carnallite Resource Amenable to Solution Mining Solution Mining Conventional Mining • Water soluble ore amenable bl tto solution l ti mining Extraction Injection Ore Skips Brine Tank • Allows for lower capex & Sh ft Shaft shorter construction timeline than conventional Mining Machines mining Conveyo

  9. Slide 9: Key Project Milestones Achieved

    Key Project Milestones Achieved  NI 43-101 compliant Preliminary Assessment complete • Drilling complete • 3D seismic complete  Conceptual mine plan and plant design complete Designed by Foster Wheeler 8

  10. Slide 10: Attractive Capex for New Potash Solution Mine

    Attractive Capex for New Potash Solution Mine Estimated Capex (US$/tonne) $1,750 Mining Methodology Conventional $1 480 $1,480 Solution $1 059 $1,059 $991 $911 $744 Karnalyte Potash One Western Potash MagIndustries BHP Billiton Agrium (Wynyard Carnallite (Legacy Project) (Milestone Project) (Kouilou

  11. Slide 11: Moving to Production

    Moving to Production 2011 2012 2013 2014 Feasibility Geological Analysis Environmental Impact Plant construction 500,000 tonne commissioning • Staged project roll-out mitigates pre-construction risk • Above indicative work plan assumes that plant construction and commissioning can be completed withi

  12. Slide 12: Proven & Committed Management Team

    Proven & Committed Management Team Robin Phinney, P.Eng. President & CEO MANAGEMENT TEAM EXPERTISE 30 Years Experience in Process, Design & Engineering Ron Love, Love CA VP, Finance & CFO 16 Years Experience Process Engineering Siu Ma, MBA, P.Eng. VP, Engineering and R&D 30 Years Experience Geology

  13. Slide 13: Strong Corporate Governance

    Strong Corporate Governance Bruce Townsend, Chairman* – 28 years experience with Potash Corp. – Former Director of Financial Analysis Nitrogen Operations with PCS Ian Brown, CA, Director* – Chartered Accountant with over 20 years of financial and capital markets experience – Current C and d fformer

  14. Slide 14: Quality Products

    Quality Products • Potash Granular Pellets • Low sodium content • Uniform size granular pellets • Moisture resistant • leads to better handling and storage • Suited for bulk blending • Industrial Grade Potash Compacted Flake 13

  15. Slide 15: End Markets

    End Markets Sell potash granular pellets into Product to meet market demands for North American agriculture market purity, ease of handling and bulk blending Industrial-grade potash Potash compacted flake for bulk handling Potential sale of magnesium oxide 50.2 million tonnes magnesium to industrial

  16. Slide 16: Opportunity for Expansion

    Opportunity for Expansion Quill Town of Lakes Wynyard Canadian Pacific Ra ilway N Yellowhead Hwy (Trans – Canada Hwy) 16 Karnalyte Resources KP 360 0 2 4 km Mineral & Surface KP360 Permit Area (340km2) Highways Drill Holes Owned by Karnalyte 2007 / 2008 3D Seismic (35km2) 2009 3D Seismic (71km2) Rai

  17. Slide 17: Investment highlights

    Investment highlights • Strong potash industry fundamentals • Attractive jurisdiction with existing infrastructure • Significant potash resource • Attractive project profile • Carnallite resource amenable to solution mining • Keyy p project j milestone: completed p NI 43-101 compliant p scoping p g