Bcm Resources Corporation · TSXV:B

Bcm Resources — Corporate Update (September 2024)

15 slides from Bcm Resources's corporate update, Sep 1, 2024

  1. Slide 1: Thompson Knolls Project Update

    Thompson Knolls Project Update September 1, 2024 1

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer BCM Resources Corporation is an early-stage mineral resource exploration company with no mineral projects that have been proven to be economic. The Thompson Knolls property is distinct and separate from any adjacent property, including Kings Canyon and Bingham, and the issuers,

  3. Slide 3: General Introduction

    General Introduction • BCM Resources Corporation (Symbol "B", TSX- Venture Exchange) is a diversified Canadian mineral exploration company focused on the continued exploration of its flagship Thompson Knolls Porphyry Cu-Au-Ag-Mo project, located approximately 208 Km (125 miles) SW of Kennecott Coppe

  4. Slide 4: Thompson Knolls Project

    Thompson Knolls Project • Thompson Knolls Cu-Au-Mo porphyry system is in King’s Canyon district, western Millard County, Utah, 3.5 km south of Highway 6/50 (“TKP”, “Property”, “Thompson Knolls”) • The property comprises 225 BLM claims and 2 parcels of Utah State leased lands totaling 5,540 acres (2,

  5. Slide 5: Phase 1, 2 and 3 Drillhole Locations

    Phase 1, 2 and 3 Drillhole Locations TK14 Magnetic anomaly area 1 N Magnetic anomaly area 2 Drillholes completed in Phase 3 drillholes* Magnetic anomaly TKP property Phase 1 and 2 areas 1 and 2 boundary Note: * TK11 and TK13 remain undrilled, TK12 is only partially drilled BCM Resources 5

  6. Slide 6: Research Prelude

    Research Prelude • In Summer 2023, BCM together with Crescat Capital became a part of the CASERM program at Colorado School of Mines (CSM) • CASERM researchers: Dr. Mathias Burisch Hassel, CSM Associate Professor and CSM MS Student Chad Abarbanel were assigned to conduct their research • In April 20

  7. Slide 7: Core Re-Logging Summary

    Core Re-Logging Summary • The new logging data implies discontinuous skarn packages that are intersected in drill holes TK6, TK8, TK9 and TK14 as well as at the very bottom of TK5 • Intersected skarn intervals are represented mainly by distal skarn mineral assemblages characterized by pyroxene and s

  8. Slide 8: Schematic Geological Model of the Thompson Knolls Skarn System

    Schematic Geological Model of the Thompson Knolls Skarn System 8

  9. Slide 9: Research Results

    Research Results • The geometry and mineralogy of skarn alteration intersected to date indicate that the “Copper core” of both Skarn and Porphyry remain outside the area of recent exploration drilling • Relatively high Cu grades associated with this intermediate-distal skarn is encouraging because t

  10. Slide 10: Conclusions & Recommendations

    Conclusions & Recommendations • The fluid migration pathways deduced from this observation could be from SW, or W or both SW and N • The most obvious scenario is that the fluids came from SW from the geophysical anomalous area 2 (Slide 11) hence this area deserves primary attention for follow up exp

  11. Slide 11: Our Interpretation

    Our Interpretation N 22.4 14.7 ? ?? 47.6 ? ? Magnetic anomaly area 2 TK17 Legend TK Mag anomaly a b Base metal ratio isolines: a) supported by drilling results, b) Vector of fluid movement interpreted extensions 11

  12. Slide 12: Future Drilling Plans

    Future Drilling Plans • Our vector path to the core continues to be refined with each drilling phase. After Phase 3 we applied more science into our exploration rather than continuing to drill a blind target • Focus on drilling of SW extension within geophysical anomaly area 2 (Slide 13) • Initially

  13. Slide 13: Planned Drillholes Under PoO with Proposed Additional Holes in Area 2

    Planned Drillholes Under PoO with Proposed Additional Holes in Area 2 N TK6 TK5 TK14 TK9 TK8 TK3a TK10 TK3 Area 1 TK15 TK11 TK1 TK16 TK7 TK2 TK17 TK4 TK12 TK13 Legend Company claims on BLM land DK14 DK DK13 1 Company leases on SITLA land DK Previously drilled holes 8 DK12 Area 3 Area 2 DK10 Drill ho

  14. Slide 14: Future Exploration

    Future Exploration • If the proposed Phase 4 drill program successfully delivers anticipated economic intercepts in both skarn and porphyry mineralization, our focus will be directed at the western anomalous Area 2 • Anticipated economic intercepts in Phase 4 will significantly increase the value of

  15. Slide 15: END

    BCM Resources Corp END

BCM Resources — Corporate Update (September 2024) on 6ix