Slide 1: Stefan Ciocan, Business Development Manager
Stefan Ciocan Business Development Manager, Transylvania +40 751 125 273 stefan.ciocan@ctp.eu ctp.eu
Slide 2: CTPark Sibiu East location and distances
CTPark Sibiu East Romania 2/5 DISTANCES Timisoara 262 km Bucharest 270 km Belgrade 410 km So ia 468 km Budapest 550 km CTPark Sibiu East is located in the Eastern Industrial Zone of the City, right next to the European road E68 and the A1 Sibiu – Nadlac Highway, which goes up to the border with Hung
Slide 3: CTPark Sibiu East availability
CTPark Sibiu East Romania 3/5 AVAILABILITY Built Planned AVAILABLE NOW 885 m² DEVELOPMENT OPPORTUNITY 0 m² BUILT-UP AREA 42,862 m² TOTAL AREA 8.70 ha SUE2 106 SUE1 Hig hway 1 km City Ce nt r e 5 km Timisoa r a 270 km Bucha r est 270 km 0.1 km 5 km 6 km 18 km
Slide 4: CTPark Sibiu East building features and services
CTPark Sibiu East Romania 4/5 sega m i e v itart su l lI Flexible options for dock levellers and loading ramps Turn-key, built-to-suit solutions to it clients' exact requirements Landscaped green areas with year-round park management services End-to-end development services including permitting, des
Slide 5: CTP is a full-service commercial real estate developer and manager
CTPark Sibiu East Romania 5/5 CTP is a full-service #1 NOTES commercial real estate Market leader in CEE developer and manager specializing in the delivery and management of custom-built, high-tech business parks for 11.0 Million m2 leading international and domestic companies Total Lettable Area ma
Slide 6: Exterior Technical Specifications
Exterior Technical Specifications Roof ➜ Tenants benefit from secure, low-maintenance insulation that is 100% waterproof and UV-resistant. All new roofs are built ‘solar-ready’ with a minimum of 10% skylight coverage. Ventilation flaps provide Intelligent engineering extends beyond the building wall
Slide 7: Interior Technical Specifications
Interior Technical Specifications Sustainability ➜ All buildings are designed for minimal environmental impact and efficient utilisation of energy, water, and other resources. Materials and installations are carefully selected to minimise maintenance costs. CTParks and buildings provide optimal work