Sun Summit Minerals Corp. · TSXV:SMN
Sun Summit Minerals — Investor Presentation (September 2025)
24 slides from Sun Summit Minerals's investor presentation, Sep 30, 2025
Slide 1: Gold-Copper Discovery Potential in Mining Friendly Toodoggone
Gold-Copper Discovery Potential in Mining Friendly Toodoggone British Columbia, Canada Q4 2025| SUNSUMMITMINERALS.COM | TSX-V: SMN | OTCQB: SMREF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Forward-Looking Information Statements contained in this presentation that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied
Slide 3: Investment Highlights
Investment Highlights ▪ Gold-copper discovery potential in the Toodoggone, B.C. ▪ Value creation from drilling and resource delineation ▪ 25,000 hectares located in Tier 1 jurisdiction, hottest district in Canada and ripe for consolidation ▪ FCX, CG, SKE actively investing in the Toodoggone ▪ Fully
Slide 4: Safe, Mining Friendly, Prolific Jurisdiction
JD Project: Safe, Mining Friendly, Prolific Jurisdiction ▪ “Golden Horseshoe”: shares same Stikinia Terrane: similar geological environment to Golden Triangle, and underexplored ▪ Significant deposits / proven mineralization ▪ Mining friendly / low-risk jurisdiction ▪ Access to hydroelectric power,
Slide 5: JD-Theory: 25,000 ha
JD-Theory: 25,000 ha BC’S NEXT PREMIER MINING JURISDICTION FYL-FCX JV: April 2025 ▪ Under-explored, significant discovery potential $39.1 million earn-in ▪ Emerging district, increased activity & investment ▪ Adjacent to epithermal gold systems: ▪ Lawyers, Ranch (Thesis Gold: $480M market cap) ▪ Sha
Slide 6: Fully Funded 2025 Exploration Program
JD Project: Fully Funded 2025 Exploration Program FULLY FUNDED FOR AGGRESSIVE EXPLORATION PROGRAM IN 2025 OXIDE ▪ 5-year permit in place FERICRETE ▪ 2025 exploration program: ▪ 5,500+ meters diamond drilling (20-25 holes) FINN ▪ Soil geochemistry (~2,000 soil samples) ▪ Prospecting & Mapping (~150 r
Slide 7: Finn to Creek Corridor
JD Project: Finn to Creek Corridor Wolf Zone Schmitt Zone AG Carb Zone SIGNIFICANT SIZE & SCALE POTENTIAL 35.4g/t Au 1500g/t Ag 18.5g/t Au 300g/t Ag 0.1g/t Au 292g/t Ag Finn-Creek Corridor ▪ Multiple high-grade gold, silver and base metal targets identified along trend ▪ Size potential along strike
Slide 8: Creek Zone 2025 Progress
JD Project: Creek Zone 2025 Progress FIRST DRILL HOLE IN 2025: CREEK ZONE (Hole CR-25-007): 78M@3.72 g/t 30m downhole from surface ▪ 11 holes drill holes completed for 3,700 meters ▪ Proposed follow up drilling north- west of hole CR-25-007 ▪ Potential for new parallel zone ▪ 75m west of hole CR-24-
Slide 9: Creek Zone 2025 Progress
JD Project: Creek Zone 2025 Progress JD PROJECT DRILL RESULTS: HIGH-GRADE EPITHERMAL AU-AG: 78 m of 3.72 g/t Au incl. 19.1 m of 7.5 g/t Au (CZ-25-007) 122.5 m of 2.1 g/t Au incl. 1.5 m of 121.0 g/t Au (CZ-24-004) 57.95 m of 2.7 g/t Au incl. 19.5 m of 7.3 g/t Au (CZ-24-005) 22.0 m of 11.7 g/t Au incl
Slide 10: Creek Zone Visible Gold in Core (Hole CR-25-007)
JD Project: Creek Zone Visible Gold in Core (Hole CR-25-007) SUNSUMMITMINERALS.COM | TSX-V: SMN | OTCQB: SMREF 10
Slide 11: Creek Zone
JD Project: Creek Zone CREEK ZONE ▪ IP geophysics confirmed chargeability and resistivity highs that require further testing ▪ Structural mapping to target high-grade veins sets JD PROJECT DRILL RESULTS: HIGH-GRADE EPITHERMAL AU-AG: 78 m of 3.72 g/t Au incl. 19.1 of 7.5 g/t Au (CZ-25-007) 122.5 m of
Slide 12: Creek Zone Highlight Drill Holes
Highlight Drill Holes JD Project: Creek Zone CZ24-004: 122.5m @ 2.1 g/t Au inc. 1.5m @ 121.0 g/t Au CZ24-005: 58.0m @ 2.7 g/t Au inc. 19.5m @ 7.3 g/t Au CZ97-008: 22.0m @ 11.7 g/t Au inc. 4.0m @ 61.2 g/t Au CZ98-012: 21.5m @ 3.1 g/t Au inc. 3.0m @ 18.7 g/t Au ▪ High-grade, vein-hosted gold + base me
Slide 13: Finn Zone
JD Project: Finn Zone ▪ Broad zone of near-surface, epithermal-related gold-silver mineralization ▪ Open at depth along strike, down dip, in footwall ▪ Prior drilling in high grade core; subsequent drilling confirmed FINN ZONE continuity of mineralization ▪ Priority drill targets to verify historica
Slide 14: Multiple Priority Targets
JD Project: Multiple Priority Targets ▪ 12 km trend of strong porphyry-related hydrothermal alteration ▪ Structurally and topographically below significant epithermal-related, gold- silver systems ▪ Strong-prospectivity for porphyry-related copper-gold mineralization across the JD project ▪ JD Porph
Slide 15: Porphyry Trend
JD Project: Porphyry Trend (A) Map of the JD Project showing the (A) Map of the JD recently acquired and compiled IP data Project showing the (400m depth slice through the recently acquired and chargeability model). New (black) and compiled IP data historical IP lines (dashed) shown. Key (400m depth
Slide 16: Porphyry Targets
McClair Creek Gossan JD Project: Porphyry Targets Porphyry Pearl UNTAPPED PORPHYRY COPPER-GOLD POTENTIAL ▪ Prolific Copper-Gold belt (Kemess Mine) OXIDE ▪ Strategic exploration for porphyry copper FERICRETE Brenda deposits lacking in Toodoggone region EAST McCLAIR ▪ Numerous poorly tested porphyry-r
Slide 17: Buck Project: District Scale Potential
Buck Project: District Scale Potential ▪ 100% owned, 52,000 ha/520 km2 Equity (Newmont) 34 Mt @ 65 g/t Ag (Mined)15 property, in mining friendly jurisdiction, with year-round access. ▪ Emerging mineralized belt near operating mines, with existing infrastructure: new acquisition Equity Silver Mine (N
Slide 18: Management & Directors
Sun Summit Minerals: Management & Directors Brian Lock | Executive Chairman Over 40 years of experience in the mining industry. Prior positions include Director, Executive VP, President and CEO of several public mining companies including Castle Peak Mining and Scorpio Gold Corp. Niel Marotta | Chie
Slide 19: Path to Value Creation
Path to Value Creation Q4 2025 Completion of 5,000m+ 52 week high/low $0.34/$0.07 drill program: JD Project Market Capitalization ~$48 Million CAD Niel Marotta CEO & Director Q4/Q1 2026 Drill results: JD project nmarotta@sunsummitminerals.com Outstanding Shares (million) 216.0 Q3/Q4 2026 Additional
Slide 20: Appendix: References
Appendix REFERENCES: 1. Krause, R.G. (1995), 1994 Geological and Geochemical Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 23663, https://apps.nrs.gov.bc.ca/pub/aris. Drillholes JD94-01 to 32 2. Krau
Slide 21: JD Project: Untapped Potential
JD Project: Untapped Potential ▪ $2.5 million exploration expenditures in 2024 ▪ $7-8 million expected by end of 2025 Porphyry ▪ $12 - 13 million remaining required spend by end of 2029 Ranch Pearl ▪ Remaining payment & requirements to earn-in to 100%: JD CAMP Sofia ▪ Second Anniversary (Dec 2025):
Slide 22: Creek Zone (2024)
JD Project: Creek Zone (2024) 362 g/t Au with qtz – carb – sph - cpy CZ-24-005 53.6 g/t Au with 121 g/t Ag, 53.6 g/t Ag and 18.2% Zn and cemented breccia cpy 4.06% Zn 2.2% Cu over 0.58 m over 0.25 m sph K - spar halo 362 g/t Au over 0.25 cm 53.6 g/t Au over 0.58 cm 21.6 g/t Au over 0.50 cm qtz –carb
Slide 23: Finn Zone
JD Project: Finn Zone FINN ZONE ▪ Broad zone of near-surface, epithermal-related gold-silver mineralization ▪ Structurally controlled mineralization ▪ Prior drilling in high grade core; subsequent drilling confirmed continuity of mineralization ▪ Open along strike and down dip ▪ Priority drill targe
Slide 24: Additional Target Areas
JD Project: Additional Target Areas 20 km EPITHERMAL GOLD-SILVER AND PORPHYRY COPPER-GOLD POTENTIAL OXIDE AND FERICRETE Porphyry Cu-Au ▪ Toodoggone mineral belt known for OXIDE high-grade epithermal Au systems, and FINN TO CREEK FERICRETE Epithermal Au-Ag large bulk-mineable porphyry Cu-Au EAST MCCL
Sun Summit Minerals — Investor Presentation (September 2025) on 6ix