  1. Slide 1: Results for the Quarter and 9 Months ended 30 September 2020

    Results for the Quarter and 9 Months ended 30 September 2020…

  2. Slide 2: Cautionary Statement on Forward Looking Information

    Cautionary Statement on Forward Looking Information Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements, o

  3. Slide 3: Covid-19 update

    Covid-19 update… Barrick’s proactive and considered engagement with all stakeholders continues to ensure protection of our people and to support the sustainability of the business during the Covid-19 pandemic The WHO clinical-based protocol for the discontinuation of quarantine was adopted Our inter

  4. Slide 4: Health & Safety

    Health & Safety… Lost Time Injury Frequency Rate & Total Recordable Injury Frequency Rate 32.7% and 23.7% decrease in year-to- date LTIFR1 and TRIFR2, respectively, 3.0 2.75 versus the same period last year 2.5 YTD 28 LTIs1 and 145 TRIs2 recorded 2.18 2.23 2.11 compared to 36 LTIs and 168 TRIs in th

  5. Slide 5: Environment

    Environment… Loulo Solar Project injects Zero class 1 (high severity) environmental incidents3 2.4 million kWh into power grid recorded during the quarter and across the group year-to-date Group rehabilitated/reclaimed 288ha of land during Q3 and 964ha year-to-date 82% water reuse and recycling rate

  6. Slide 6: Community

    Community… Continued to provide timely assistance in the prevention of the Covid-19 pandemic to host communities and invested > $25 million I-80 Fund launched in July 2020 with $5 million NGM investment Provides low-interest loans to small businesses impacted by Covid-19 in Lander, Elko, Humboldt, a

  7. Slide 7: Employee demographics

    Employee demographics… % Women hired YTD 100% North America Expats 1.4% Donlin Gold (50%) Headcount: 7,689 Contractors: 5,004 50% Expats 2.7% Nationals 98.6% Africa and Middle East 0% NA LATAM & AP AME Headcount: 7,930 Golden Sunlight (100%) Hemlo (100%) Contractors: 13,099 % Women Nationals % Hired

  8. Slide 8: Barrick Q3 2020 KPIs

    Barrick…Q3 2020 KPIs Another solid quarter positions Barrick to deliver on annual production guidance Higher gold prices drive strong cash flow and increased royalty costs Operating cash flow of $1.9 billion and record free cash flow4 of more than $1.3 billion Debt net of cash reduced by 71% to $0.4

  9. Slide 9: Group operating results

    Group operating results… Another solid quarter of production driven by Carlin and Pueblo Viejo following scheduled plant maintenance in Q2 Gold operating results Q3 2020 Q2 2020 Q3 2019 9M 2020 Per ounce costs improve quarter-on-quarter Production (koz) 1,155 1,149 1,306 3,554 despite high royalty c

  10. Slide 10: Group financial results

    Group financial results… Financial Results Q3 2020 Q2 2020 Q3 2019 9M 2020 Revenue ($ million) 3,540 3,055 2,678 9,316 Free cash flow4 increased by 151% to a record $1.3 billion Net earnings ($ million) 882 357 2,277 1,639 Captured benefit of higher gold prices through agile Adjusted net earnings ($

  11. Slide 11: Carlin

    Carlin… Nevada, USA Strong, high-margin operating performance at Carlin Carlin12 (61.5%) Q3 2020 Q2 2020 Q3 2019 9M 2020 in Q3 driven by: Ore tonnes processed (000) 3,078 2,835 3,188 9,142 Improved throughput and reliability of the Goldstrike Average grade processed (g/t) 3.93 3.60 3.33 3.64 Roaster

  12. Slide 12: Carlin Trend exploration

    Carlin Trend…exploration Nevada, USA Evidence of high grade mineralisation between N Drilling in progress at Ren Multiple intercepts up to “Sinkhole” breccia target Basin Bounding Fault and Leeville 5.2m at 10.9g/t along the Post-Gen Faulti North Leeville – following up Early drill results in Leevil

  13. Slide 13: Cortez

    Cortez… Nevada, USA Production and costs at Cortez in Q3 were impacted Cortez13 (61.5%) Q3 2020 Q2 2020 Q3 2019 9M 2020 by a decrease in trucking of open pit stockpiles to Ore tonnes processed (000) 3,301 2,381 2,837 10,466 Carlin as well as lower grades from CHUGi Average grade processed 1.34 1.87

  14. Slide 14: Cortez District opportunities

    Cortez District…opportunities Nevada, USA Dorothyi Robertson N 2.7m at 180.3g/t (FM19-14D) Dorothy Crossroads to Sophiai Sophiai Robertson 9.9m at 48.4g/t (FM20-153D) Fourmile 9.8m at 48.5g/t (FM19-47D) Pipeline and 9.6m at 80.1g/t (FM20-169D) (Barrick) Blanchei Sophia 21.5m at 40.2g/t (FM19-22D) Co

  15. Slide 15: Turquoise Ridge

    Turquoise Ridge… Nevada, USA Slightly lower production from Q2 due to autoclave Turquoise Ridge15 (61.5%) Q3 2020 Q2 2020 Q3 2019 9M 2020 maintenance and reliability upgrades, as well as lower recoveries due to ore blend Ore tonnes processed (000) 968 821 950 2,649 Despite lower production, per ounc

  16. Slide 16: Turquoise Ridge – Twin Creeks

    Turquoise Ridge – Twin Creeks… Nevada, USA Sparsely tested corridor between two giant deposits Focus is on improving deposit geology at both mines, in parallel with relogging available deep drill holes Structurally complex with evidence of leakage Multiple targets emerging for both expansion and new

  17. Slide 17: Other Nevada Gold Mines

    Other Nevada Gold Mines… Phoenix Phoenix (61.5%) Q3 2020 Q2 2020 Q3 2019 9M 2020 Gold production impacted by lower grades and recovery, Gold produced (oz 000) 30 35 25 100 though costs benefit from higher copper by-product credits Cost of sales ($/oz)7 1,773 1,726 2,186 1,697 Phoenix remains well-po

  18. Slide 18: Donlin making progress

    Donlin…making progress Alaska Successfully completed 85-hole drilling Top intercepts returned to date from 2020 program: program DC20-1873i Approximately 23,400 meters drilled in the 7.66m at 18.40g/t DC20-1878i 19.77m at 11.3g/t ACMA and Lewis deposit area Assays received for first 25 holes DC20-18

  19. Slide 19: Hemlo

    Hemlo… Ontario, Canada Hemlo continues to deliver consistent production, in line with guidance Hemlo (100%) Q3 2020 Q2 2020 Q3 2019 9M 2020 Costs managed despite impact of NPI royalty from Ore tonnes processed (000) 519 472 607 1,484 higher gold prices, though trending above guidance for Average gra

  20. Slide 20: Hemlo western upside

    Hemlo…western upside Ontario, Canada Black Fly Zone Black Fly trench program extents Multi-gram gold anomalies defined by Projected holes intersecting >3g/t gold trenching over 1,500 metre strike length Projected holes intersecting <3g/t gold Mine shafts Golden David west of the Williams open pit at

  21. Slide 21: Pueblo Viejo

    Pueblo Viejo… Dominican Republic As expected, production increased by 16% following Pueblo Viejo16 (60%) Q3 2020 Q2 2020 Q3 2019 9M 2020 the total plant maintenance shutdown in Q2 Ore tonnes processed (000) 1,281 1,088 1,182 3,841 Accordingly, per ounce costs showed strong Average grade processed (g

  22. Slide 22: Dominican Republic prospective belts

    Dominican Republic…prospective belts Revised structural model enabling prediction of controls and offsets to mineralisation. 4 new satellite targets identified Barrick JV with Precipitate Drilled Mejita NE target with a 4-hole initial campaign Pueblo Viejo obtaining gold mineralisation over an area

  23. Slide 23: Veladero

    Veladero… Argentina As previously disclosed, year-to-date operations have been Veladero17 (50%) Q3 2020 Q2 2020 Q3 2019 9M 2020 impacted by: Ore tonnes processed (000) 3,189 2,609 3,463 9,041 A mandatory nationwide quarantine Average grade processed (g/t) 0.79 0.93 0.74 0.83 Movement and social dist

  24. Slide 24: LATAM portfolio a work in progress

    LATAM portfolio…. Dominican Republic  New predictive structural ,model a work in progress Pueblo Viejo  Drilling validates target Guiana Shield Broadening growth mandate to greater  Negotiations to Guiana Shield consolidate properties region Northern Peru Veladero Strategy  Exploring the Jurassi

  25. Slide 25: Porgera

    Porgera… Papua New Guinea As previously disclosed, Porgera entered care and maintenance on April 25 after a government announcement that our application for renewal of the Special Mining Lease (SML) had been rejected. We believe the government’s action was a violation of due process and have launche

  26. Slide 26: Loulo-Gounkoto

    Loulo-Gounkoto… Mali Production consistent with prior quarter, keeping the Loulo-Gounkoto19 (80%) Q3 2020 Q2 2020 Q3 2019 9M 2020 Complex on track to meet the upper end of 2020 guidance Ore tonnes processed (000) 1,004 972 1,013 2,957 Total cash costs per ounce8 higher from Q2 due to higher Average

  27. Slide 27: Loulo District

    Loulo District… Senegal-Mali Baboto N Bambadji Permiti Loulo Permiti Gara Loulo 3  Additional drill results at Kabewest confirmed a  Scout drilling in the Yalea Transfer Zone confirms 40-70m wide complex mineralised system with Yalea down plunge extension of the shoot with 43.80m at 30m at 2.45g/t

  28. Slide 28: Tongon

    Tongon… Côte d'Ivoire Solid and reliable production in Q3 – consistent with Tongon (89.7%) Q3 2020 Q2 2020 Q3 2019 9M 2020 both prior quarter and prior year Ore tonnes processed (000) 999 1,013 964 2,994 Although impacted by higher processing and mining costs in Q3, total cash costs per ounce8 and A

  29. Slide 29: Kibali

    Kibali… DRC Kibali delivered consistent results with production Kibali20 (45%) Q3 2020 Q2 2020 Q3 2019 9M 2020 and total cash costs per ounce8 in-line with Q2 Ore tonnes processed (000) 862 857 852 2,557 Underground set new ore delivery record in Q3 Average grade processed (g/t) 3.67 3.68 3.74 3.71

  30. Slide 30: KZ Structure resource replacement pipeline

    KZ Structure…resource replacement pipeline DRC Kalimva-Ikamva Ikamva Kalimva Kibali on track to grow mineral Oere reserves net of 2020 depletion Mengu HiIl Pakaka Robust mineral resource growth Mofu Pamao pipeline and mineral reserve Kombokolo Pakaka conversion lays foundation for continued growth i

  31. Slide 31: North Mara

    North Mara… Tanzania Production in-line with Q2 North Mara (84%)21 Q3 2020 Q2 2020 Q3 2019 9M 2020 Focus on improving the underground mine resulted in total Ore tonnes processed (000) 622 611 172 1,869 cash costs per ounce8 decreasing by 10% from prior Average grade processed quarter 3.59 3.75 5.58

  32. Slide 32: North Mara Gokona system

    North Mara…Gokona systemi Tanzania Kofia KDH001 Host sandstones & West conglomerates with variable +2.8km East A1/A2T alteration Open GOKONA GENA Open Surface Upper Drill Drill West Gap Gap Shoot Phase Phase Upper East Shoot Upper West 1 2 Au g/t Extn Gena 2.5-5 Extn. Open 5-10 400m Conversion Area

  33. Slide 33: Bulyanhulu and Buzwagi

    Bulyanhulu and Buzwagi… Tanzania Bulyanhulu Bulyanhulu (84%)21 Q3 2020 Q2 2020 Q3 2019 9M 2020 Underground mining operations resumed in Q3 Gold produced (oz 000) 7 7 6 21 First development fronts now advanced Gold sold (oz 000) 46 30 5 83 Processing of fresh underground ore is on track for Q4 Cost o

  34. Slide 34: Bulyanhulu Reef 1 orebody drilling extends high grade at depth

    Bulyanhulu Reef 1 orebody… drilling extends high grade at depthi N Haulage Level BGMDD0071 True width 2.60m at 11.3g/t 2020 Mining Area 2000m Deep West BGMDD0070 True width 4.70m at 38.2g/t BGMDD0069 True width 2.77m at 33.0g/t BGMDD0072 BGMDD0069B True width 7.90m at 10.3g/t True width 1.85m at 110

  35. Slide 35: Copper mines

    Copper mines… Lumwana, Zambia Lumwana (100%) Q3 2020 Q2 2020 Q3 2019 9M 2020 Production in Q3 impacted by lower throughput due to plant Copper produced (lbs million) 62 72 65 198 maintenance, with improvement expected in Q4 Cost of sales ($/lb) 2.06 2.06 2.04 2.03 Despite this, C1 cash costs per pou

  36. Slide 36: MRM and Exploration Upside

    MRM and Exploration Upside… 11–20 years Sustainable 6–10 years Delivery  Exploration 0–5 years  Mineral Resource Management  Life of Mine Plans

  37. Slide 37: Performance driven by a clear strategy

    Performance driven by a clear strategy… Dividend per Sharei Cumulative OCFii Cumulative FCF4 Debt, Net of Cash 10 7000 4000 4000 9 3500 3500 6000 8 3000 3000 5000 7 2500 2500 6 4000 5 2000 2000 3000 4 1500 1500 3 2000 1000 1000 2 1000 500 500 1 0 0 0 0 Cents per share $ million $ million $ million i

  38. Slide 38: Relative Share Price Performance

    Relative Share Price Performance… Relative Share Price Performance since Relative Share Price Performance YTD merger announcement with Randgold Base = 100 Base = 100 300 170 Barrick: 44% Barrick: 156% 160 275 150 250 140 225 130 200 120 175 110 100 Spot Gold: 25% 150 90 GDX: 33% 125 80 100 Spot Gold

  39. Slide 39: Endnotes

    Endnotes 1. Loss time injury frequency rate (LTIFR) is a ratio calculated as follows: number of loss time injuries x 1,000,000 hours divided by the total number of hours worked. 2. Total reportable incident frequency rate (TRIFR) is a ratio calculated as follows: number of reportable injuries x 1,00

  40. Slide 40: Endnotes

    Endnotes 8. “Total cash costs” per ounce, “All-in sustaining costs” per ounce and "All-in costs" per ounce are non-GAAP financial performance measures. “Total cash costs” per ounce starts with cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of

  41. Slide 41: Endnotes

    Endnotes 12. On July 1, 2019, Barrick's Goldstrike and Newmont's Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined

  42. Slide 42: Technical Information

    Technical Information The scientific and technical information contained in this presentation has been reviewed and approved by Steven Yopps, MMSA, Manager of Growth Projects, Nevada Gold Mines; Craig Fiddes, SME-RM, Manager – Resource Modeling, Nevada Gold Mines; Chad Yuhasz, P.Geo, Mineral Resourc

  43. Slide 43: Appendix A – Carlin Trend Significant Intercept Table

    Appendix A – Carlin Trend Significant Intercept Tablei i. All intercepts calculated using a 5 g/t Au cutoff and are uncapped; Drill Results Presented Q3 2020 minimum intercept width is 0.8m; internal dilution is less than 20% Width total width Core Drill Holeii Azimuth Dip Interval (m) Au (g/t) ii.

  44. Slide 44: Appendix B – Fourmile Significant Intercept Table

    Appendix B – Fourmile Significant Intercept Tablei Drill Results Returned Q3 2020 i. All intercepts calculated using a 5 g/t Au cutoff and are uncapped; minimum intercept width is 0.8m; internal dilution is less than 20% Core Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au (g/t) total width ii

  45. Slide 45: Appendix B – Fourmile Significant Intercept Table

    Appendix B – Fourmile Significant Intercept Tablei i. All intercepts calculated using a 5 g/t Au cutoff and are Previously Reported Drill Results Presented Q3 2020 uncapped; minimum intercept width is 0.8m; internal Core Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au (g/t) dilution is less th

  46. Slide 46: Appendix C – Donlin Gold JV Significant Intercept Table

    Appendix C – Donlin Gold JV Significant Intercept Tablei Drill Results Presented Q3 2020 Core Drill Width i. Significant intervals represent drilled intervals and not Holeii Area Azimuth Dip Interval (m) (m)iii Au (g/t) necessarily true thickness of mineralization. Mineralized 14.0-17.8 3.8 3.5 inte

  47. Slide 47: Appendix C – Donlin Gold JV Significant Intercept Table

    Appendix C – Donlin Gold JV Significant Intercept Tablei Drill Results Presented Q3 2020 i. Significant intervals represent drilled intervals and not necessarily Core Drill Holeii Area Azimuth Dip Interval (m) Width (m)iii Au (g/t) true thickness of mineralization. Mineralized intervals meet or 43.8

  48. Slide 48: Appendix D – Pueblo Viejo Significant Intercept Table

    Appendix D – Pueblo Viejo Significant Intercept Tablei Drill Results from Q3 2020 i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; a minimum intercept length of 10m is reported, with internal dilution of Core Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au (g/t) no more

  49. Slide 49: Appendix E – Loulo-Gounkoto Significant Intercept Table

    Appendix E – Loulo-Gounkoto Significant Intercept Tablei Drill Results from Q3 2020 Lode Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au (g/t) Transfer Zone YADH147 68.98 -61.78 902.6-907.3 4.70 1.98 i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept wid

  50. Slide 50: Appendix E – Loulo-Gounkoto Significant Intercept Table

    Appendix E – Loulo-Gounkoto Significant Intercept Tablei Drill Results from Q3 2020 Lode Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au (g/t) i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum Transfer Zone YADH170 67.00 -63.00 1168.9-1171 2.10 1.16 intercept wid

  51. Slide 51: Appendix E – Bambadji Significant Intercept Table

    Appendix E – Bambadji Significant Intercept Tablei Drill Results from Q3 2020 i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2m; internal dilution is equal to or less than 2m total width. Lode Drill Holeii Azimuth Dip Interval (m) Width (m)iii Au

  52. Slide 52: Appendix F – North Mara (Gena) Significant Intercept Table

    Appendix F – North Mara (Gena) Significant Intercept Tablei,ii Gena Central - Resource Conversion Drilling - Q3 2020 i. All intercepts for Gena are calculated at 1g/t Au cut-off grade as a rounded Location Type Drill Hole iii Azimuth Dip Interval (m) Width (m) iv Au (g/t) marginal cut-off for resour

  53. Slide 53: Appendix F – North Mara (Gokona) Significant Intercept Table

    Appendix F – North Mara (Gokona) Significant Intercept Tablei,ii Gokona Deep Central - Resource conversion drilling - Q3 2020 Location Type Drill Holeiii Azimuth Dip Interval (m) Width (m)iv Au (g/t) DDC5 DDH UGKD702 331.3 -75.7 388 393 5 3.4 i. All intercepts calculated at 1.9g/t Au cut-off grade a

  54. Slide 54: Appendix G – Bulyanhulu Significant Intercept Table

    Appendix G – Bulyanhulu Significant Intercept Tablei i. Capping at 300 g/t Au on the raw data, with minimum of 1m Bulyanhulu Deep West Drilling – Q3 2020 intercept, with at least 60% of the resulting intercepts above 2 g/t Au cut-off. Azimuth Width True Width Au ii. Bulyanhulu – drill hole nomenclat