  1. Slide 1: Paladin Energy Ltd WNA Presentation

    PALADIN ENERGY LTD WNA PRESENTATION Wednesday 4 September 2019 ASX: PDN

  2. Slide 2: Disclaimer and Notes

    DISCLAIMER AND NOTES JORC AND NI 43-101 MINERAL RESOURCES AND ORE RESERVES This presentation includes certain statements that may be deemed “forward-looking In the following presentation, for those deposits that are reported as conforming to the statements”. All statements in this presentation, othe

  3. Slide 3: Corporate Profile: Who is Paladin?

    CORPORATE PROFILE WHO IS PALADIN? MARKET SNAPSHOT ASX: PDN as at 22 August 2019 An ASX listed independent uranium company Shares on issue 1,752M with a focus in Africa, Australia and Canada Share price A$ 13.5c Market capitalisation A$ 236.5M 14 years of production history across two mines Market ca

  4. Slide 4: Strong Demand in the Uranium Market

    STRONG DEMAND IN THE URANIUM MARKET A solid long-term outlook

  5. Slide 5: The Uranium Story is Compelling

    THE URANIUM STORY IS COMPELLING $160 Spot Price 2000 - 2018 Demand Fulfilment 2011 - 2018 Cumulative supply cuts 250.0 $140 “Under buying” 2016 2017 2018 2019 2020 200.0 0 Langer $120 -5 Heinrich U308 Spot price (US$/lb) 150.0 Cominak $100 -10 Mlbs McArthur Mlb U3O8 -15 Mlb $80 100.0 River -20 Kazak

  6. Slide 6: Supply Side Factors

    SUPPLY SIDE FACTORS KEY MARKET OBSERVATIONS New project development Kazakhstan production Stocks drawn down Significant decrease When long-term timelines stretched: flat @ <60Mlb to  Permitting uncertainty remains contracting returns, >400Mlb and +40Mlb in exploration spend 2021. 15% IPO + (ve) in

  7. Slide 7: Demand Side Factors

    DEMAND SIDE FACTORS GLOBAL WARMING  Nuclear energy is a low cost and low emission base load energy source  Global impetus to reduce carbon emissions and global warming  Intergovernmental Panel on Climate Change (IPCC) REPORT – Limit global warming increase to 1.5˚C  China - Plans to have 56 reac

  8. Slide 8: Sentiment Moving Back to Nuclear

    SENTIMENT MOVING BACK TO NUCLEAR  Nuclear energy is gaining increased support, even from former opponents (Source: Michael Shellenberger https://www.youtube.com/watch?v=N-yALPEpV4w)  Over two decades of climate change conferences (Berlin 1995) with little to show for it  Carbon emission continue

  9. Slide 9: Demand Growth Far Exceeds Supply Capability

    DEMAND GROWTH FAR EXCEEDS SUPPLY CAPABILITY Future Contracted Coverage Rates of US & European Utilities 325 120.00% 300 Contract Coverage (% of total requirements) 275 100.00% 250 225 80.00% 200 175 Mlbs 60.00% 150 125 40.00% 100 75 50 20.00% 25 0 0.00% Base supply need Additional High supply need S

  10. Slide 10: A Strategic Tier-One Asset at Langer Heinrich

    A STRATEGIC TIER-ONE ASSET AT LANGER HEINRICH A LOW COST, LONG LIFE URANIUM MINE

  11. Slide 11: We Are Not Standing Still…

    WE ARE NOT STANDING STILL… WE ARE PLANNING FOR A RAPID, RELIABLE RESTART CONCEPT STUDY COMPLETED TO OPTIMISE RESTART: Verify C&M practices to Learn from 10 years of Define further potential Prefeasibility study for ensure asset is operation to ensure restart improvements and cost rapid, low-risk res

  12. Slide 12: Rapid Production Restart on Uranium Price Recovery

    RAPID PRODUCTION RESTART ON URANIUM PRICE RECOVERY DESCRIPTION STATUS TIMING PURPOSE  Identify, detail and compare multiple Completed February restart options Concept Study 2019  Rank on risk and return 1. RAPID RESTART STUDY (PFS1) Strategic aim - be  Select single go forward plan able to initia

  13. Slide 13: Option 1. Rapid Restart Study (PFS1)

    OPTION 1. RAPID RESTART STUDY (PFS1)  Comparatively low initial restart capital requirements of circa US$78M (excludes C&M costs) Plant repair and Working capital improvement US$54M US$24M (includes: first fill of reagents, recommissioning, remobilisation and tailings dam costs)  Process largely a

  14. Slide 14: Option 2. Processing Upgrade Study (PFS2)

    OPTION 2. PROCESSING UPGRADE STUDY (PFS2) FURTHER ENCHANCEMENTS TO LANGER HEINRICH AFTER THE RAPID RESTART BACK END UPGRADE*  To reduce reagent costs and recover vanadium, water recovery US$43M from tailings and pressure leach  12-15 month Prefeasibility Study (currently in-progress) to select pro

  15. Slide 15: World Wide Production Cost Curve – All Projects

    WORLD WIDE PRODUCT COST CURVE – ALL PROJECTS 100.00 90.00 80.00 70.00 Full costs (US$/lb U3O8) 60.00 50.00 40.00 Target Life of Mine AISC1 30.00 Aspirational Target Langer Heinrich AISC1 20.00 10.00 0.00 0.00 100.00 200.00 300.00 400.00 500.00 600.00 Cumulative Annual Production (Mlb pa) Source: UxC

  16. Slide 16: Paladin (Africa) Ltd Sale Announced

    PALADIN (AFRICA) LTD (PAL) SALE ANNOUNCED  PAL to be sold to Lotus Resources Pty Ltd (subsidiary Hylea Resources). PAL holds an 85% interest in Kayelekera Mine and associated leases  Consideration for the sale:  A$5M  A$200,000 cash  A$4.8M in shares (A$1.8M on completion subject to 12 month es

  17. Slide 17: Conclusion

    CONCLUSION Diversified portfolio of developed mines and exploration projects with significant leverage to upward movements in the uranium price Lead time and capital associated with a re-start to bring Langer Heinrich back into production is shorter and lower than new projects Lower incentive price

  18. Slide 18: Contact Us

    CONTACT US HEAD OFFICE INVESTOR RELATIONS Level 4, 502 Hay Street Karen Oswald Subiaco Western Australia 6008 T: +61 (8) 9423 8162 T: +61 (0) 8 9381 4366 M: +61 (0) 423 602 353 E: paladin@paladinenergy.com.au E: karen.oswald@paladinenergy.com.au www.paladinenergy.com.au

  19. Slide 19: Appendix

    APPENDIX

  20. Slide 20: Meet Our Board of Directors

    MEET OUR BOARD OF DIRECTORS Rick Crabb – Non-Executive Chairman David Riekie – Non-Executive Director Daniel Harris – Non-Executive Director John Hodder – Non-Executive Director Mr Crabb practiced as a solicitor form 1980 to 2004 Mr Riekie is an experienced ASX Director at both the Mr Harris is a se

  21. Slide 21: Meet Our Senior Management

    MEET OUR SENIOR MANAGEMENT Scott Sullivan – Chief Executive Officer Anna Sudlow – Chief Financial Officer Andrea Betti – Company Secretary Mr Sullivan brings 30 years of diversified mining experience to Paladin, across Anna is a highly qualified CFO with more than 20-years’ experience Ms Betti is an

  22. Slide 22: Resource & Reserve Tables

    Paladin Attributable Mineral Resources Mt Grade ppm U3O8 Mlb U3O8 (100% basis) Paladin Ownership (%) (Mlb) RESOURCE & RESERVE TABLES Namibia Langer Heinrich Measured 60.7 515 68.7 75 51.5 Indicated 21.5 460 21.7 75 16.3 Inferred 8.7 470 9 75 6.8 Stockpiles 30.8 355 24 75 18.0 Total Namibia 121.7 460

  23. Slide 23: A Quality Global Suite of Exploration Assets

    A QUALITY GLOBAL SUITE OF EXPLORATION ASSETS Mt Isa (100%)  Three Exploration Permits and six Mineral Development Licences  Largest uranium deposit in Queensland Canada Manyingee  Potential for future development of uranium mine 41.5Mlb Status: Pre-development exploration Michelin 127.7Mlb 148.4M